Standard rules: environmental permitting
For each activity there is a set of rules and a risk assessment.
You can apply for a standard rules permit if your operation meets the relevant description and rules, but:
- you cannot vary (change) the rules and you have no right of appeal against them
- if you want to change your operations and so will no longer meet the rules then you will have to apply to change your standard permit to a bespoke permit instead
- if there is a change in your local environment after your permit has been issued (for example due to a change in the definition of a groundwater source protection zone or houses are built close to the site), you may need to upgrade the operation to a standard sufficient for the changed environment, or change to a bespoke permit
Before you submit your permit application you:
- must check your site meets the standard rules location criteria
- can use the pre-application advice service to make sure your permit application is correct
If your site does not meet the criteria we will return your application.
Anaerobic digestion including use of the resultant gas and storing digestate
Car and vehicle dismantling
Car and vehicle dismantling - unavailable for new applications
Composting, sewage or sludge treatment, biogas
Composting, sewage or sludge treatment, biogas - unavailable for new applications
Deposit for recovery
Deposit for recovery - unavailable for new applications
Electrical insulating oil storage
Flood risk activities
Standard rules permits for flood risk activities
Medium combustion plant and specified generators
Metal recycling, scrap metal and WEEE - not cars or vehicles
Metal recycling, scrap metal and WEEE - not cars or vehicles - unavailable for new applications
Mining, oil and gas
Mobile plant for land-spreading or treatment
Radioactive substances for non-nuclear sites
Research and development
Storage or treatment of waste - recycling, dredging, clinical, soil, tyre shred or wood treatment
Storage or treatment of waste - recycling, dredging, clinical, soil or wood treatment - unavailable for new applications
Waste transfer station or amenity site with or without treatment
Water discharges
The annual permit fee (‘subsistence’) for standard water discharge permits starts from the date the permit is issued, so you should not apply for a permit significantly ahead of when it’s required.
As well as the 5 standard permits listed in this section, standard permit SR2008 No 27 (mobile plant for the treatment of soils and contaminated material, substances or products) can also apply to water discharges.