SR2021 No 6: anaerobic digestion facility, including use of the resultant biogas – installations
For a Part A installation with an anaerobic digestion treatment capacity of over 100 tonnes of waste, or waste and non-waste each day accepting no more than 100,000 tonnes each year.
Applies to England
Documents
Details
You can apply for this standard rules permit if:
- your activity meets the rules set out in the permit
- you can manage the potential risks as set out in the generic risk assessment
Updates to this page
-
Standard rules: 'Activity 4 – treating biogas and biomethane' changed (b) and added (d) and (e). Added technique 21 and 22, 2.5 decarbonisation readiness, 4.2.5 and 'table 4.2' captured, treated and stored carbon dioxide. 'Interpretation' added last sentence to 'accident management plan' and meaning for 'CCR', 'CCR conditions', 'change in type of technical assessment', 'decarbonisation readiness', 'HCR' and 'HCR conditions'. Generic risk assessment: added 3.4 Accidental release of CO2.
-
Edit to Appendix A - removal of contact details on form as no longer used.
-
Added 'or habitats' to the conservation screening distance in the Introductory note and under 2.2 The site.
-
First published.