SR2015 No.34: temporary scaffolding affecting up to 20 metres length of a main river

SR2015 number 34: temporary scaffolding affecting up to 20 metres length of a main river.

Documents

SR2015 No.34: Temporary scaffolding affecting up to 20 metres length of a main river

This file may not be suitable for users of assistive technology. Request an accessible format.

If you use assistive technology (eg a screen reader) and need a version of this document in a more accessible format, please email enquiries@environment-agency.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Generic Risk Assessment for SR2015 No.34: Temporary scaffolding affecting up to 20 metres length of a main river

This file may not be suitable for users of assistive technology. Request an accessible format.

If you use assistive technology (eg a screen reader) and need a version of this document in a more accessible format, please email enquiries@environment-agency.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Detail

When referred to in an environmental permit, these rules will allow the operator to erect and use temporary scaffolding affecting up to 20 metres length of a watercourse that is a main river for a maximum of 4 weeks. The watercourse must be at least 4 metres in width.

These rules do not allow the erection or use of scaffolding on or within 8 metres of flood defences.

The activities shall be undertaken outside of the relevant fish breeding season.