Skip to main content
Collection

Energy infrastructure development applications: decisions

Decisions by the Secretary of State on energy infrastructure applications.

Decisions made by the Secretary of State on energy infrastructure applications include:

  • Development Consent Orders (DCOs) under the Planning Act 2008 (PA 2008)
  • Material Changes (MC) and Non-Material Changes (NMC) to DCOs under the PA 2008
  • correction of errors in DCOs under the PA 2008
  • post consent condition discharges for DCOs under the PA 2008
  • applications for consent under section 36 (s.36) of the Electricity Act 1989 (EA 1989)
  • variations to existing s.36 consents under s.36C of the EA 1989
  • post consent condition discharges for s.36 of the EA 1989
  • applications made under the Transport and Works Act 1992 (TWA 1992)
  • overhead line applications under section 37 (s.37) of the EA 1989 following a Public Inquiry
  • Compulsory Purchase Orders (CPOs) for electricity infrastructure
  • Directions under section 35 (s.35) of the PA 2008
  • Environmental Impact Assessment screening and scoping opinions under the Electricity Works (Environmental Impact Assessment) (England and Wales) Regulations 2017 (2017 EIA Regs)
  • Safety Zones for offshore renewable energy installations under the Energy Act 2004 (EA 2004)

Archived Energy Infrastructure site

The previous Energy Infrastructure pages have been archived. Please check the archive if you are looking for decisions made between 2005 and 2017.

2026

2025

2024

2023

2022

2021

2020

2019

2018