Guidance

Movement of abnormal loads by water

Guidance on when to move an abnormal load by water and when it is allowed for it to be moved by road.

This publication was withdrawn on

This publication was withdrawn from GOV.UK on 27 September 2022 and replaced with the latest information on the National Highways website

Documents

Water preferred policy guidelines for the movement of abnormal loads

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email info@highwaysengland.co.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

Where practical, economic and environmentally desirable the largest abnormal loads should be moved by inland and/or coastal water to reduce the impact caused by moving these loads by road.

This document provides details of the water preferred policy for the movement of abnormal loads and guidance to help those wishing to move an abnormal load determine whether their load should be moved by water or road.

View map of inland freight routes suitable for abnormal load movements.

Find out more about the requirements for transporting abnormal loads.

Published 12 July 2012
Last updated 3 May 2019 + show all updates
  1. Updated version of the Water preferred policy guidelines document added

  2. link to map of inland freight routes added.

  3. Documents updated

  4. First published.