Hurdle rate estimates for electricity sector technologies
Research carried out in 2024, on estimates of hurdle rates for a range of different electricity generation technologies.
Documents
Details
DESNZ commissioned CEPA to undertake this research covering updates to the hurdle rate assumptions for the following technologies:
- renewable generation
- other low carbon generation
- thermal generation (both with and without carbon capture use and storage, or CCUS)
- storage technologies
- interconnectors
- hydrogen electrolysers
- demand response.
The evidence drawn from research reviews in the Generation Costs Series informs:
- cost estimates and technical assumptions within the Generation Costs Reports
- administrative strike prices (ASP) analysis for the Contracts for Difference (CfD) renewables deployment scheme
- power sector modelling