ETL application checklist: water to air heat pumps, split, multi-split and variable refrigerant flow (VRF)
Energy Technology List application checklist for water to air heat pumps, split, multi-split and variable refrigerant flow (ECA751).
Documents
Details
This checklist will support your application to have a product listed on the Energy Technology List.
Updates to this page
-
Updated in line with ETL criteria changes of 29th March 2019.
-
First published.