Guidance

Combined Heat and Power case studies

Selected combined heat and power case studies.

Documents

CHPQA Case Study - Volac Renewable Energy

This file may not be suitable for users of assistive technology.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email enquiries@beis.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CHPQA case study - Lister Hospital

This file may not be suitable for users of assistive technology.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email enquiries@beis.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CHPQA case study - Coventry Energy from Waste

This file may not be suitable for users of assistive technology.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email enquiries@beis.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CHPQA case study - Bath Riverside

Details

A series of interesting CHP case studies are given above. These case studies have been selected from CHP schemes registered within the Combined Heat and Power Quality Assurance programme.

Published 10 February 2017
Last updated 3 April 2020 + show all updates
  1. New case study added: Volac Renewable Energy.

  2. New case study added: Queens University Belfast.

  3. A new case study has been uploaded.

  4. First published.