We launched the carbon capture, usage and storage (CCUS) cluster sequencing process on 7 May 2021 to identify and sequence carbon capture, usage and storage (CCUS) clusters suitable for deployment in the mid-2020s. This was a commitment in the 10 Point Plan.
The East Coast Cluster and Hynet were sequenced onto Track-1. The Scottish cluster was announced as a reserve in case a backup is needed.
We received submissions for power, industrial carbon capture (ICC) and hydrogen to connect onto a Track-1 or reserve cluster as part of the Phase-2 cluster sequencing process.
For projects to proceed to the evaluation stage of Phase-2, they were reviewed to ensure they met the eligibility criteria (outlined in Phase-2 guidance).
The projects listed here have met those criteria.
Power CCUS
East Coast Cluster
- VPI Humber Zero
- Whitetail Clean Energy
- Net Zero Teesside Power
- Alfanar CCGT Teesside
- Keadby 3 Carbon Capture Power Station
- C.GEN Killingholme
Hynet
- Making Net Zero Possible – Grain
Scottish Cluster
- Peterhead Carbon Capture Power Station
Hydrogen
East Coast Cluster
- H2NorthEast
- Uniper Humber Hub Blue Project
- bpH2Teesside
- Hydrogen to Humber (H2H) Saltend
Hynet
- Project Cavendish
- HyNet Hydrogen Production Project (HPP)
Scottish Cluster
- Acorn Hydrogen
- Fife Hydrogen Hub
Industrial carbon capture (ICC)
East Coast Cluster
- STV 1+2 Energy from Waste Carbon Capture Project
- STV 3 Energy from Waste Carbon Capture Project
- Tees Valley Energy Recovery Facility Project (TVERF)
- Altalto Immingham waste to jet fuel
- Lighthouse Green Fuels
- Redcar Energy Centre
- Humber Zero - Phillips 66 Humber Refinery
- Prax Lindsey Oil Refinery Carbon Capture Project
- ZerCaL250
- Teesside Hydrogen CO2 Capture
- Saint-Gobain Glass Carbon Capture Project
- Norsea Carbon Capture
- CF Fertilisers Billingham Ammonia CCS
- Teesside Green Energy Park Limited
- North Lincolnshire Green Energy Park
Hynet
- Viridor Runcorn Industrial CCS
- Protos Biofuels
- Protos Energy Recovery Facility
- Hanson Padeswood Cement Works carbon capture and storage project
- CF Fertilisers Ince Capture Plant
- Buxton Lime Net Zero
- Carbon Dioxide Capture Unit - EssarOil UK
- Emerge CCS
Scottish Cluster
- CO2 Extraction from St Fergus Gas at SAGE Terminal
- Acorn Capture