Guidance
Request for planning permission for an Entertainment Resort Complex and associated development in Bedford: part 4 - Environmental Statement appendices
Documents supporting the request for planning permission for an Entertainment Resort Complex and associated development in Bedford.
Applies to England
Glossary and acronyms
Appendix 1
- Appendix 1.1 Relevant Expertise and Competency
- Appendix 1.2 Location of Required Information within the ES
Appendix 2
- Appendix 2.1 Environmental Statement Basis of Assessment
- Appendix 2.3 Outline Construction Environmental Management Plan
- Appendix 2.4 Description of Development for EIA and Examples
- Appendix 2.7 Daylight Assessment Results
Appendix 3
- Appendix 3.1 Legislation, Policy and Guidance for all ES Technical Topics
- Appendix 3.2 Significance Criteria for all ES Technical Topics
- Appendix 3.3 Assessment of Residential Properties in Site boundary
- Appendix 3.4 Table 1 – Summary of Assumptions – Transport
Appendix 5
- Appendix 5.1 Transport Assessment and annexes
- Appendix 5.2 Link Sensitivity Review (Volume 3)
- Appendix 5.3 18-Hour AAWT Flows (Volume 3)
- Appendix 5.4 Traffic Flows for Sensitivity Testing Scenario 5a (Volume 3)
- Appendix 5.5 Traffic Flows for Sensitivity Testing Scenario 5b (Volume 3)
- Appendix 5.6 Travel Plan
Appendix 6
- Appendix 6.1 Preliminary Ecological Appraisal Report
- Appendix 6.2 Aquatic Habitat Scoping Assessment Report
- Appendix 6.4 Outline Habitat Creation and Enhancement Plan
- Appendix 6.5 Outline Landscape and Ecology Management Plan
- Appendix 6.6 Inter-Project Cumulative Assessment
- Appendix 6.7 Great Crested Newt Survey Report
- Appendix 6.8 Macrophyte Survey Report
- Appendix 6.9 Breeding Bird Survey Report
- Appendix 6.10 Bat Roost Appraisal Report
- Appendix 6.11 Otter and Water Vole Survey Report
- Appendix 6.12 Reptile Survey Report
- Appendix 6.13 Terrestrial Invertebrate Survey Report
- Appendix 6.14 UK Habitat Classification Report
- Appendix 6.15 Wintering Bird Survey Report
- Appendix 6.16 Bat Activity Survey Report
- Appendix 6.17 Aquatic Ecology Survey Report
- Appendix 6.18 Barn Owl Survey Report
- Appendix 6.19 Letters of Comfort - Protected Species Licencing
Appendix 7
- Appendix 7.1 Technical Methodology: Photography, 3D Modelling, Accurate Visual Representations
- Appendix 7.2 LVIA Engagement
- Appendix 7.3 LVIA Methodology
- Appendix 7.4 Landscape Character Areas: Key Characteristics
- Appendix 7.5 Landscape Character: Assessment of Effects
- Appendix 7.6 Detailed Visual Impact Assessment
- Appendix 7.7 Landscape Visualisations
Appendix 8
- Appendix 8.1 Traffic Data
- Appendix 8.2 Air Quality Model Details
- Appendix 8.3 Background Air Pollution Data
- Appendix 8.4 Air Quality Monitoring Data
- Appendix 8.5 Details of Selected Human Receptors
- Appendix 8.6 Details of Ecological Receptor Transects
- Appendix 8.7 Results for Human Receptors
- Appendix 8.8 Results for Ecological Receptors
Appendix 9
- Appendix 9.1 Baseline Noise Survey Details
- Appendix 9.2 Construction Noise and Vibration Assessment
- Appendix 9.3 Construction and Operational Road Traffic Noise Assessment
- Appendix 9.4 Operational Noise Assessment
- Appendix 9.5 Demonstration of compliance with Operational Phase noise limits
Appendix 10
- Appendix 10.1 Historic Environment Desk-Based Assessment
- Appendix 10.2 Archaeological Trial Trench Evaluation Report Parts 1 to 3
- Appendix 10.3 Archaeological Mitigation Strategy
Appendix 11
- Appendix 11.1 Contaminated Land Preliminary Risk Assessment Parts 1 to 3
- Appendix 11.2 Ground Investigation Technical Note
- Appendix 11.3 Mineral Resource Assessment
- Appendix 11.4 Outline Land Remediation Strategy
Appendix 12
- Appendix 12.1 Flood Risk Assessment
- Appendix 12.2 Water Strategy
- Appendix 12.3 Drainage Strategy
Appendix 13
- Appendix 13.1 Temporary workforce accommodation strategy
Appendix 14
- Appendix 14.1 Carbon Management Plan
Appendix 16
- Appendix 16.1 Major Accidents and Disasters Long List
- Appendix 16.2 Major Accidents and Disasters Risk Record
Appendix 18
- Appendix 18.1 Long List of Committed Developments
Updates to this page
Published 3 July 2025