What to include in your leachate management plan

What to include in a leachate management plan for a landfill site for hazardous and non-hazardous waste.

Managing leachate at your site

Your permit requires you to manage and operate your facility by following a written management system. Follow the guidance on how to develop and maintain management plans.

For landfills for hazardous or non-hazardous waste, you must provide a plan for managing leachate. Your plan must explain how you will:

  • manage leachate from the initial development of the site until the leachate achieves its completion criteria
  • manage any discharges from your site, such as to surface water or to the sewerage network

You must normally review your leachate management plan when you carry out your review of the hydrogeological risk assessment.

Where your leachate collection, control and discharge system does not perform adequately and as intended, you must provide a voluntary action or improvement plan. This must include details of what contingency measures you will put in place to ensure leachate is extracted, monitored and treated effectively. This is required to demonstrate compliance with your permit conditions.

Where the Environment Agency has agreed a voluntary action or improvement plan to ensure that leachate is more effectively managed at your site, you may need to review your leachate management plan more frequently. You must agree the review frequency in writing with your local Environment Agency officer.

Leachate management can influence the potential for odour pollution. Your leachate management plan must take account of this and must provide details on how you will reduce the potential for odour production.

You must manage your leachate at your site so that it doesn’t compromise the effectiveness of your landfill gas collection system.

Your infrastructure and procedures for extracting and monitoring leachate must be fit for purpose.

Read the guidance on how to:

What to include in your leachate management plan

Your leachate management plan should include the following sections on this page.

You should include an entry in each section. This may be just to confirm that these features are not relevant to your site, or are not available, or to reference documents where you have provided the required information. 

The Environment Agency accepts that you may not need to complete some of the sections.

Where you include information in tables in the report, put these next to the text they relate to.

Include drawings and cross sections where applicable.

Consider including all the information you used to complete the plan in appendices or provide references to where this is in another document, for example your environmental setting and installation design report. This also applies to all numerical and analytical models you refer to in the report and their results.

Where required by your permit, you must review the leachate quality at your site or refer to the document where this information is held. For example, within your review of the hydrogeological risk assessment. This is to ensure that this reflects what you provide in the conceptual model for the site.

This also applies to any closed landfills where you:

Where your permit says you should review your hydrogeological risk assessment every 4 years, you should read this to now mean every 6 years.

1. Introduction

The introduction to your leachate management plan should include:

  • details of the operator, site name and address
  • details of the agent who completed the plan
  • report context – include background information and an outline of the installation or site
  • site location and setting, including the outline area of the installation or site and how it relates to historically operated areas of landfill or waste recovery activities
  • the site history and the current operational status of the site
  • roles and responsibilities and management structure or a reference to the report it is in
  • the date and reference of any previous leachate management plan
  • the date and reference of the current permit
  • a summary of any permit improvement conditions relating to the management and monitoring of leachate and whether these have been agreed and implemented
  • the aims and objectives of the report

2. Conceptual site model

Your leachate management plan should include or refer to the current:

Summarise or refer to the current conceptual site model for your site and confirm the sources, pathways and receptors.

Where required by your permit, you must review and maintain your conceptual site model when you review the hydrogeological risk assessment for your site. This is to ensure that it remains appropriate.

The plan should consider any future failure scenarios and outline how these will be addressed.

Include drawings and cross sections where applicable.

3. Landfill containment system

You should include details of the as constructed landfill containment system for each cell or phase at your site or provide references where these are within another document. Confirm the as constructed:

  • dewatering or under drainage system
  • basal containment
  • sidewall containment
  • inter cell bunds
  • temporary and permanent capping

Include details of those areas of the site that have no landfill containment system. Include details of any changes in the design of the base or sidewall containment within a cell or phase.

Where your leachate compliance limit or level is based on groundwater levels outside the waste mass, for example, in sub-water table landfills, you must show that you can maintain an inward hydraulic gradient. You must include details of those areas of the site where hydraulic containment is relied on.

4. Leachate collection and extraction system and infrastructure

Include details of the leachate collection and extraction system and infrastructure you use at your site. Confirm, for each cell or phase, the detailed design of the:

  • leachate collection and extraction system
  • leachate collection and delivery pipework
  • leachate extraction and independent monitoring infrastructure
  • as constructed well or borehole basal and surface elevations or levels

Confirm whether you use any leachate monitoring wells or boreholes for leachate extraction and, if you do, identify these on a drawing.

You should include your procedures for monitoring leachate levels from these wells or boreholes in your leachate monitoring methodology. This should include how you have determined the length of time between the suspension of any pumping and the monitoring of the leachate level.

Pumping suspension testing or recovery trials should normally be undertaken either:

Read the guidance on monitoring landfill leachate, groundwater and surface water: LFTGN02.

Read about how to monitor and report your performance.

5. Leachate management system

Include details of the leachate management system you use at your site or provide a reference to the report it is in.

Confirm the:

  • design of any leachate re-circulation system
  • design and capacity of the leachate storage and treatment facility
  • method of leachate treatment including details of any chemical dosing, biological media or physical filtration processes that are used
  • method of leachate disposal, for example by discharge to controlled waters, sewer network or exported by road tanker
  • disposal route for concentrates and other bio sludges that may accumulate within your leachate treatment facility
  • annual volume of leachate discharged from site by direct discharge to controlled water, indirect discharge by sewer discharge consent or indirect discharge by tanker
  • requirements of any wastewater discharge consent, including the name of any third party
  • Dangerous Substances and Explosive Atmospheres Regulations requirements or signage

6. Water balance calculation and leachate management

Review the volumes of leachate that are produced and are discharged from your site.

Provide an appropriate water balance calculation to predict the volume of leachate that will be produced at your site. Where the Environment Agency has agreed a voluntary action or improvement plan to ensure that leachate is more effectively managed at your site, you must provide an appropriate water balance calculation annually.

Ensure that you have adequate provision for storing, removing and, where applicable, treating leachate. This is to keep leachate levels below the permit compliance limit based on your water balance calculations. 

Review your water balance calculation annually so that you can predict and manage the volumes of leachate requiring extraction, storage, treatment and disposal.

Read about what to include in your hydrogeological risk assessment.

Some permits require you to provide the Environment Agency with a summary of the volumes of leachate removed from site. If your permit does not require this, you will need to provide this data to them annually or at a frequency agreed in writing with your local Environment Agency officer.

7. Leachate monitoring

Your permit will tell you:

  • what you must monitor
  • how often you must monitor
  • where you must monitor
  • what you must report

Include a table to show the current leachate monitoring requirements for your site. Include the monitoring requirements for:

  • leachate level
  • leachate quality
  • leachate volume discharged to controlled waters, sewer network, off-site effluent treatment plant, tankering or other off-site transfer
  • groundwater level where your site is hydraulically contained

8. Leachate monitoring methodology

Include the methodology you use to monitor the:

  • leachate level
  • leachate quality
  • leachate volume
  • leachate discharge
  • groundwater level where your site is hydraulically contained

Your methodology should also include details of:

  • the techniques and equipment you use
  • how and at what frequency your equipment will be calibrated
  • how you report the data
  • how you ensure that the elevations or levels of the well head and base of any infrastructure are accurate and reliable

9. Inspection and maintenance

Include details or refer to your current procedures, including the frequency, for how you will inspect, maintain and service each element of the leachate collection, control and discharge system. Include:

  • any supplementary processing and treatment equipment
  • how you will minimise potential emissions of landfill gas or odour (or both) and prevent leaks or spills of leachate or other chemicals used when treating landfill leachate
  • contingency measures for system failures or unexpected events
  • timescales for replacing or repairing failed equipment

Include details of, or refer to your current procedures, for the inspection and maintenance of the:

  • leachate collection system
  • leachate extraction system
  • leachate monitoring system
  • leachate re-circulation system
  • leachate treatment system
  • leachate discharge system including how the volume of leachate leaving site is monitored or calibrated

10. Performance of the leachate management system

Include details, or refer to your current procedures, for assessing how the current leachate management system is performing for:

  • the whole site
  • each hydraulically separate cell or phase
  • each well or borehole where you extract leachate by pumping

Include your procedures for assessing the performance of the:

  • leachate collection system
  • leachate extraction system
  • leachate monitoring system
  • leachate storage and treatment system

11. Procedures in the event of the failure or redundancy of the leachate management system

Include details or refer to your current procedures you will use in the event of the failure or redundancy of any element of your leachate system. Include timescales for implementing any remedial measures. Include details of what you will do where:

  • there is a mechanical breakdown of any plant machinery used to collect and discharge leachate
  • leachate levels are exceeding the action or permit compliance limit
  • there are anomalous results in the leachate level or quality monitoring data
  • operational problems or failures in the leachate control system are identified during routine inspections or the maintenance programme
  • there are emissions of landfill gas or odour (or both)
  • there are leaks or spills of leachate
  • there are extreme weather events, for example high rainfall, and high and freezing temperatures
  • fire or vandalism or differential settlement destroys any infrastructure
  • there are any other system failures or unexpected events

12. Tables

Tables can be used to summarise information and data within your leachate management plan more clearly. You may use tables where applicable and put them next to the text they relate to.

The tables in your leachate monitoring plan may include the following.

Table 1

A summary of the construction of each cell or phase, with elevations or levels in metres above ordnance datum (mAOD), including:

  • cell or phase number or identification
  • whether construction quality assurance was employed and to what extent
  • reference to construction quality assurance records
  • design of dewatering or under drainage system
  • basal liner design
  • sidewall liner design
  • design and location of inter cell bunds
  • design of the leachate collection, extraction and monitoring system including the basal gradient, direction of flow towards the extraction point and the design and location of target pads
  • cells or phases that do not have a basal or sidewall liner or leachate collection system
  • changes in the design of the sidewall containment within a cell or phase together with the elevations or levels in mAOD of any change in design
  • design of the cap

Table 2

A summary of the operational development of each cell or phase including:

  • cell or phase number or identification
  • date cell or phase constructed
  • date infilling of cell or phase commenced
  • date infilling of cell or phases completed
  • details of cell or phases overtipped
  • date temporary and permanent capping completed

Table 3

A summary of the existing leachate extraction and monitoring infrastructure including:

  • cell or phase number or identification
  • well or borehole identification
  • number of wells or boreholes within each cell or phase
  • type of well or borehole such as whether it is original or retro-fitted
  • the date any retro-fitted well or borehole installed
  • purpose of well or borehole such as whether it is for extraction or monitoring
  • whether a pump is fitted
  • any additional comments

Table 4

A summary of the existing well or borehole basal and surface elevations or levels including:

  • cell or phase number or identification
  • well or borehole identification
  • elevation or level to base in mAOD
  • elevation or level to base or sidewalls of cell or phase in mAOD
  • construction details
  • elevation or level to the top of the casing and ground surface including the date last surveyed in mAOD

Table 5

A summary of leachate level monitoring requirements including:

  • cell or phase number or identification
  • well or borehole identification
  • action or control levels in mAOD
  • compliance limits or trigger levels in mAOD
  • purpose of well or borehole such as whether it is for extraction or monitoring or a combination of both

Table 6

Include a summary of the volume of leachate extracted at the site per month per cell or phase. You do not need to do this if your permit requires you to provide this information within your annual report.

13. Drawings

The drawings in your leachate management plan must be site-specific.

One drawing can provide information for more than one part of the leachate management plan if the drawing is clearly labelled and of a suitable scale.

Use recognised scales (such as 1:1250) for all drawings, maps or plans to clearly show the relevant details. All elevations or levels must be in mAOD.

Label each drawing with the:

  • drawing title
  • site name
  • name and address of the operator
  • date the drawing was made
  • drawing identification number
  • scale of the drawing
  • key
  • grid lines and north point
  • paper size of the original drawing

Include identification numbers for each leachate extraction and monitoring point.

Where you do include drawings, these may include:

  • a plan showing the site location and location of each individual cell or phase
  • a plan and cross sections, including elevations or levels in mAOD, showing the design of the basal and sidewall containment including the location of any inter cell bunds and the basal gradient
  • a plan and cross section, including elevations or levels in mAOD, showing the design and location of the leachate collection, extraction and monitoring infrastructure including the design and location of the target pads
  • a plan showing all surface leachate management pipework or drains
  • a plan showing the location of any leachate storage and treatment facility
  • a plan showing the location of any leachate discharge points
  • a plan and cross section, including elevations or levels in mAOD, showing the conceptual site model including the permitted leachate level (or levels) in each cell, phase or catchment area

14. Appendices

Appendices may be used to summarise information and data within your leachate management plan more clearly.

You do not need to include information in the appendices if:

  • you have included it within the main text of the report
  • you have referred to another document or where your permit requires you to provide this information within your annual report

Where you use appendices, refer to these within the relevant section of the leachate management plan. You may include:

  • details of the construction of the leachate extraction and monitoring infrastructure including the design, borehole logs and construction quality assurance records
  • water balance and leachate removal rates
  • leachate level monitoring methodology
  • details of how pumping trials or pumping suspension or recovery trials will be carried out
  • leachate extraction and monitoring infrastructure maintenance schedule
  • leachate extraction and monitoring infrastructure monitoring schedule
  • leachate level and extraction infrastructure contingency action plan
  • procedures and infrastructure to be used to recirculate leachate (as agreed with the Environment Agency)
  • procedures to be used for extreme weather events, for example, high rainfall and high and freezing temperatures
  • procedures for inspecting, maintaining and servicing each element of the leachate extraction and monitoring infrastructure and overland and underground pipework
  • procedures for the installation, operation, maintenance and monitoring of the leachate extraction and monitoring infrastructure
  • digital copies of any data or models you used

Go to the next section: Accept the right waste.