Guidance

Treating and using water containing concrete at construction sites: RPS 287

Published 23 October 2024

Applies to England

This regulatory position statement (RPS) does not change your legal requirement to get an environmental permit for a waste operation when you store, treat or use waste water containing concrete at construction sites.

However, the Environment Agency will not normally take enforcement action against you if you do not comply with this legal requirement provided that:

  • your activity meets the description set out in this RPS

  • you comply with the conditions set out in this RPS

In addition your activity must not cause (or be likely to cause) pollution of the environment or harm to human health, and must not:

  • cause a risk to water, air, soil, plants or animals

  • cause a nuisance through noise or odours

  • adversely affect the countryside or places of special interest

Activity this RPS applies to

This RPS applies to storing, treating and using waste water containing concrete on a construction site before use or disposal. This can include water produced by washing out equipment such as concrete mixers, concrete batching plants, delivery lorries and related equipment such as chutes, pump lines, drums, wheelbarrows.

Under this RPS you can use:

  • treated waste water containing concrete for washing equipment

  • untreated or treated waste water containing concrete for producing new concrete  

You must not use untreated or treated water containing concrete to suppress dust.

This RPS does not apply to water containing grouts. 

Conditions you must comply with

You must:

  • follow a method statement which minimises the risk of pollution, including but not limited to control measures, monitoring and inspection, staff training and incident response planning

  • keep records for 2 years from your last use of this RPS to show that you have complied with this RPS and make these records available to the Environment Agency on request

Storage

You must:

  • securely store the water – secure means that the water cannot escape, and unauthorised people cannot access it

  • contain the water before treatment and use, for example through an impermeable settling tank, engineered lagoon or leakproof skips  

  • maintain a freeboard of 10% of the capacity of the tank, engineered lagoon or leakproof skip to prevent overtopping

You must not store more than 30m3 of waste water containing concrete at any time in any single location on the construction site.

Treatment

You must only treat water containing concrete by:

  • filtration, settlement lagoons or physical dewatering, for example in a settlement tank, silt press or other specialised treatment system

  • correcting the pH using solutions or carbon dioxide before use or lawful disposal 

  • using products that solidify water containing concrete prior to use or transfer from the construction site 

You must operate and maintain specialised treatment systems using trained operatives in line with the manufacturer’s instructions 

You must not use any chemicals or flocculants other than products to solidify water containing concrete

Use

You must:

  • monitor pH of the water containing concrete and keep records of compliance of the treated water prior to use or lawful disposal  

  • comply with your waste environmental permit or exemption if you want to use set concrete on the construction site

Locations

You must not carry out activities associated with storing, treating or using water containing concrete within 10m of any watercourse and within 50m of:  

  • Sites of Special Scientific Interest 

  • Special Areas of Conservation (SACs) including proposed SACs 

  • Special Protection Areas (SPAs) including potential SPAs 

  • Ramsar sites – wetlands of international importance (both listed and proposed)

  • Marine Conservation Zones

  • other nature conservation sites, such as ancient woodlands and local and national nature reserves – check the map 

  • local wildlife sites 

Discharges

You must keep records demonstrating lawful discharge of waste waters to groundwater, surface water or sewer.

Things to note

If the water under this RPS cannot be used on the construction site then it must be legally discharged or transported off-site for treatment and disposal.

Before you discharge water containing concrete you must take certain actions first. If you discharge to:

This RPS does not include the use of untreated or treated waste water containing concrete in dust suppression because of environmental and human health risks associated with chromium VI.

You must comply with your waste environmental permit or waste exemption if you want to use waste dried solids fines on your construction site.

When you must check back

The Environment Agency will review this RPS by 30 June 2027.

The Environment Agency can withdraw or amend this regulatory position before the review date if they consider it necessary. This includes where the activity that this RPS relates to has not changed.

You will need to check back from time to time, including at and before the review date, to see if this RPS still applies.

This RPS remains in force until it is removed from GOV.UK or is otherwise identified as having been withdrawn.

You can subscribe to email updates about this RPS. These will tell you if the RPS has changed and when it has been withdrawn.

If you cannot comply with this RPS

If you operate under this RPS but can no longer comply with it, you must:

Contact the Environment Agency

If you have any questions about this RPS email wastetreatment@environment-agency.gov.uk and put ‘RPS 287’ in the subject.