Including marine noise reduction methods for pile driving in offshore wind development applications
Published 27 November 2026
Applies to England
As an offshore wind developer, you have a responsibility to reduce marine noise during pile driving activity to your ‘best endeavours’.
At multiple stages of a project’s development, you can demonstrate how you have done this.
Before applying, you should read the reducing marine noise policy for guidance on:
- applying the term ‘best endeavours’ in this specific context
- methods of noise reduction you could consider
Determining your method for reducing marine noise
When considering your method for reducing marine noise, you should think about:
- multiple noise reduction options
- which options could be used in your project
- using primary, secondary or both noise reduction methods
You’re not being assessed on the amount of noise you are reducing. Rather, that you’re applying your ‘best endeavours’ to achieve it. This is to allow individual developments to consider practical restrictions that are specific to the project, for example water depth or foundation design.
Pre-application: Discussing your application with consenting and licensing authorities
You should contact the appropriate consenting and licensing authorities at the earliest opportunity to discuss the development and application. You should keep a record of the conversations.
You do not need to commit to a particular type of noise reduction at the pre-application stage. But if these are known, you are encouraged to provide this information.
Applying for a consent or licence
When you apply for relevant consents and licences, you may be asked to provide some of the following documents or plans.
Impact assessment
Most applicants will need to provide an impact assessment. In this written document you should lay out the potential positive effect your chosen method would have on noise reduction. This should include:
- the potential worst-case impacts from piling without a defined level of noise reduction
- any potential impacts with noise reduction methods
The impact assessment should consider the individual circumstances of your project. It’s recommended that you research the noise reduction options that are available and appropriate for your development, to inform the level of noise reduction that is practically achievable. However, you do not need to specify a specific method, type or brand of noise reduction at this stage. This is so consent and licensing authorities can make an informed decision.
The level of noise reduction deemed possible and used in the modelling will represent the minimum level of noise reduction expected if consent and licensing is granted. This impact assessment is normally the first opportunity to demonstrate how you have applied best endeavours to reduce noise.
New noise reduction methods may become available after your development has already been granted consent. If a better method becomes available while your development design is being finalised, you can consider new and innovative methods.
You can find additional guidance from the JNCC for conducting underwater noise assessments.
Outline Marine Mammal Mitigation Plan
Typically, you’ll need to submit a draft or ‘outline’ Marine Mammal Mitigation Plan (MMMP) at the application stage.
The level you commit to reducing underwater noise by within this plan will provide licensing authorities (and advisers) confidence that best endeavours will be considered in your project design refinement process. You can provide the details of how you’ll achieve this in the final MMMP post-consent.
It is expected you would finalise the plan once the project design is confirmed.
Summary of pre-application discussions
You may be asked for discussion logs with all consenting authorities and statutory nature conservation bodies (SNCBs).
In-Principle Monitoring Plan (or similar)
Monitoring the efficiency of your marine noise reduction method will likely be a key part of your application. You may be asked to provide details of any underwater noise and marine mammal monitoring you propose, including any additional monitoring that may be required to test the efficacy of new noise reduction methods.
This may be within an In-Principle Monitoring Plan (IPMP) or similar document.
For developments within a Marine Protected Areas (MPA)
If your development is happening with a Marine Protected Area (MPA) you may need to provide the following:
- Site Integrity Plans (SIPs)
- information to support a Marine Conservation Zone (MCZ) assessment
- information to support a Habitat Regulations Assessment (HRA)
For developments part of Nationally Significant Infrastructure Projects (NSIPs)
If your development is part of a Nationally Significant Infrastructure Project (NSIP), you’ll need to detail any specific conditions you have considered related to the use of noise reduction methods in the draft Development Consent Order (DCO) or deemed marine licence.
Your plans will need to be updated and approved with the consenting authority and SNCBs before construction starts. This is normally a requirement as part of the draft for DCOs and marine licences.
Exceptional circumstances
There may be exceptional circumstances where you are unable to present a suitable noise reduction method.
For example, if:
- the site conditions are unsuitable for current noise reduction technologies
- the applicant can prove that the inability to secure noise reduction methods is outside of their control, noting that it is the applicant’s responsibility to allow enough time to apply and secure noise reduction methods
- costs of acquiring or using noise reduction methods are so significant as to render the project financially unviable.
(This list is not exhaustive and should be treated as indicative.)
Where this is envisaged, we recommend that developers discuss individual circumstances with the relevant consenting and licensing authority.
You may be asked to provide a fully evidenced justification or explore other methods by the consenting or licensing authority, if they consider that insufficient justification has been provided. This could delay the consent or licence applications from being processed or approved.
Applicants who can demonstrate they have identified the most effective, available noise reduction method or methods for their specific project are less likely to face such delays.
Further guidance for all projects
Read guidance:
- on the Environmental Impact Assessment (EIA) process for Nationally Significant Infrastructure Projects (NSIPs)
- from the MMO on information needed to support marine licence applications in English waters
Projects that have consent (pre-installation)
After receiving all relevant consents and licences up to this stage, you should demonstrate that you have made best endeavours to take all actions that a reasonable party would take to acquire and utilise noise reductions in their developments.
Final Marine Mammal Mitigation Plan
Your chosen methods of noise reduction should be detailed in your final MMMP. You should provide:
- evidence that all options available at the time of preparing the final MMMP were considered
- evidence on how your final choice was made, linking back to the original review as necessary
- evidence why other options were not suitable for your particular project
Minimum level of noise reduction
The minimum level of noise reduction achieved by your chosen method should be equal to or greater than the level stated in your original impact assessment at the application stage.
There may be exceptional circumstances after consent or a licence is granted which mean noise reduction methods can no longer be acquired or used. This may be despite using your best endeavours. If you cannot meet the minimum level of noise reduction assessed at the application stage, you will need to inform the relevant consenting and licencing authorities as early as possible. You’ll need to provide clear evidence and justification against the original impact assessment, providing updates where required. You may need a licence or consent variation.
For projects where noise reduction was not assessed at the application stage, options should be discussed with the consenting authority and SNCBs to agree an approach.
Timelines after consent is granted
The deadline for when you must send documents to the consenting authority for approval depends on the conditions set out in your consent. The consenting authority will contact the SNCBs as part of their review, when appropriate. You can discuss finalising these documents with the SNCBs before you submit.
You should submit your final MMMP to the consenting authority at least 6 months (but no sooner than 9 months) before piling is expected to start, unless stated otherwise in the consent. This is to give the consenting and licensing authority time to review, consult and discharge the relevant conditions.
Projects that have consent (during installation)
After all relevant consents and licences are formally approved (discharged) , including the final MMMP, you can now consider that you have met best endeavours. This should be detailed in required post-consent discharge submissions.
From this point onwards, the consent conditions agreed including mitigated noise levels (based on the prior impact assessment) become the superseding requirements that developers must legally meet.
As the noise levels are part of the consent conditions, if the noise reduction methods fail or do not perform as expected, you will need to inform the relevant consenting and licensing authorities as early as possible. You will need to provide justification against the original impact assessment and provide updates where required. Additional noise modelling may be required to assess impacts, determine significance and assess what changes may be required. The consenting and licensing authorities will provide guidance on how to proceed.
Applying for a wildlife licence
It is assumed that a wildlife licence will be required, because the underwater noise impacts of piling cannot be completely mitigated. If you apply for a wildlife licence, the application should include (but is not limited to):
- details to demonstrate how the ‘no satisfactory alternatives’ test has been met (within the final MMMP) and acquired noise reduction methods
- the underwater noise assessment presented in the environmental statement
A wildlife licence will only be granted where the licensing authority is satisfied that all relevant legal tests have been met.
You should submit the application to the licensing authority at least 6 months (but no sooner than 9 months) before piling starts. It is recommended that you submit at the same time as you complete the MMMP, as both documents use the same information.
Read the Marine Management Organisation’s guidance on how to apply for a wildlife licence in English waters.
Innovative noise reduction technologies
The development of innovative noise reduction methods is welcomed and encouraged. However, technologies with more robust evidence are likely to face smoother consenting journeys, as mitigation of environmental impacts can be better estimated.
You may still propose the use of new technologies if you also commit to:
- undertake greater monitoring to evidence their efficacy at sea
- provide a suitable alternative form of noise reduction if the novel technology proves to be ineffective
You should discussed the use of new technologies as early as possible, preferably during the pre-application stage, to ensure the consultation period with SNCBs is as efficient as possible. The SNCBs welcome discussions on the trialling of new technologies on a case-by-case basis.
Projects with existing consents and licences that specify particular noise reduction methods may nevertheless consider the use of new technologies. This is contingent on the new technology providing equal or improved levels of noise reduction, to the methods previously committed to. Any changes should be done in consultation with the SNCBs and reflected in an updated MMMP.