Notice

Monkey Island footbridge replacement: river restriction notice

Published 3 March 2017

This notice was withdrawn on

Notice no longer in force

When

6 March 2017 to 31 January 2018

Where

Backwater around Monkey Island, Boveney Reach

Details

As part of the development of Monkey Island, the footbridge is being replaced.

Due to these works the backwater will be shut off to all navigation. The current bridge does not allow for powered vessels to navigate and this closure will only effect small powered vessels and unpowered craft.