Monkey Island footbridge replacement: river restriction notice
Published 3 March 2017
When
6 March 2017 to 31 January 2018
Where
Backwater around Monkey Island, Boveney Reach
Details
As part of the development of Monkey Island, the footbridge is being replaced.
Due to these works the backwater will be shut off to all navigation. The current bridge does not allow for powered vessels to navigate and this closure will only effect small powered vessels and unpowered craft.