The likely significant route-wide environmental effects of the construction and operation of the HS2 Phase 2a scheme, based on the current level of design and assessment.

This publication was withdrawn on

Final versions of these draft documents can now be accessed on the HS2 Phase 2a Environmental Statement collection.

Documents

Volume 3: Route-wide effects

Details

This document has been published as part of the High Speed Two Phase 2a Working Draft Environmental Impact Assessment Report.

It describes the impacts and effects that are likely to occur at a geographical scale greater than the community areas described in Volume 2 community area reports.