Notice

CR0 4TD, Viridor South London Limited: environmental permit draft decision advertisement - EPR/GP3305LN/V003

Published 21 July 2023

This notice was withdrawn on

The consultation period for this application has ended. You can view current licences on the Public Registers.

Applies to England

Details of the application

The Environment Agency has received two substantial variation and consolidation applications for environmental permits under the Environmental Permitting (England and Wales) Regulations 2016. These had environmental permit references EPR/GP3305LN for Beddington Energy Recovery Facility and EPR/JB3136RD for Beddington Waste Transfer Station, but are now being consolidated into one permit, with reference EPR/GP3305LN. It is now consulting on the proposed decision.

Applicant name

Viridor South London Limited

Reference number

EPR/GP3305LN/V003

Brief description of activity

The Operator applied to vary and consolidate the permits for Beddington Energy Recovery Facility (ERF) (EPR/GP3305LN) and Beddington Waste Transfer Station (EPR/JB3136RD, also listed as EAWML 104442), so that the two activities are regulated under a single Environmental Permit.

In addition the Operator has requested the following changes:

  • Variation of the main listed activity (S5.1 A1 (b) The incineration of non-hazardous waste in a waste incineration plant with a capacity of 3 tonnes per hour or more) to increase in the processing capacity of the Energy Recovery Facility to 382,286 tonnes per annum.

  • Amendment to the locations of emission points S1, W1 and W2 to show their correct locations on the site plan.

  • Add an emission point (A4) for the shredder associated with the waste transfer station activities.

  • Amend the waste transfer station permit from a standard rules permit (SR2015 No10) to a bespoke permit including hazardous waste transfer station & non-hazardous waste transfer and treatment station activities.

  • Amend the European Waste Catalogue codes for the waste transfer station activity.

  • Amend improvement conditions 2 and 6 to mark them as complete.

  • Renaming of the site to “Beddington ERF and WTS” to better reflect the activities undertaken onsite.

Application type

Substantial variation and consolidation

Regulated facility address

Beddington ERF and WTS
Beddington Lane
Croydon
CR0 4TD

Local authority

London Borough of Sutton

Information placed in Citizen Space for consultation:

  • Draft variation notice

  • Draft decision document

  • Schedule 5 Notice response dated 21/06/2023, including details on plant capacity and waste acceptance procedure

  • Schedule 5 Notice response dated 25/05/2023, including greenhouse gas assessment, site condition report, site condition report supporting information, Fire Prevention Plan and emissions points layout plan.

How to view and comment on the application

End date for representations: 15 September 2023

You can comment:

Online: view and comment on the proposed decision using Citizen Space

Via email: pscpublicresponse@environment-agency.gov.uk

For advice about how to make a representation or if you are unable to make a representation via e-mail please call 03708 506 506.

The Environment Agency will normally put any comments it receives on the public register. This includes your name but not your personal contact details. Please tell us if you do not want your response to be public.

The privacy notice for permit applicants/operators can be viewed at Privacy Notice
Find out more about consultations on draft decisions for environmental permits