Open consultation

Environmental permitting: standard rules consultation no 18

Summary

We want your views on a proposed revision to SR2018 No 9 for specified generators.

This consultation is being held on another website.

This consultation closes at

Consultation description

We want your views on the proposal to include the option for secondary abatement in this rule set:

  • SR2018 No 9 standard rules Specified Generator, Tranche B low risk, base load operation between 0 - 0.9 MWth (megawatt thermal)

Documents

SR consultation no 18: revision of standard rule set SR2018 no 9

This file may not be suitable for users of assistive technology. Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email enquiries@environment-agency.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Published 23 November 2018