Report 10/2017: Partial collapse of a bridge onto open railway lines at Barrow upon Soar

Partial collapse of a bridge onto open railway lines at Barrow upon Soar, Leicestershire, 1 August 2016.

R102017_170606_Barrow_upon_Soar

At around 23:50 hrs on 1 August 2016, a bridge carrying Grove Lane in Barrow upon Soar, Leicestershire, over the Midland Main Line, partially collapsed and a large volume of masonry fell onto the railway lines below. At the time of the collapse, core sampling work was being undertaken to investigate localised subsidence in the footpath on the south side of the bridge. The bridge was closed to the public when the collapse occurred, but the railway lines below were open to traffic.

When the coring had reached about 1.4 metres below ground, water appeared at the surface and shortly afterwards, the adjacent wall fell away from the side of the bridge, taking with it part of the footpath, a length of cast iron water main and the core sampling rig. Five workers were able to get clear as the collapse occurred and no-one was injured. Two of the four railway lines through the bridge were completely obstructed and there was debris on a third. There were no trains on the immediate approach to the bridge at the time of the collapse.

The RAIB investigation found that the incident occurred because the bridge wall, built around 1840, was not designed to resist overturning. It had also been weakened by a full- height vertical crack. The water main, which ran close to the vertical crack, probably had a slow leak which was causing on-going subsidence in the footpath. Prior to 1 August, however, there was no evidence that the wall was at risk of imminent collapse.

The coring work on the night of the incident disturbed the pressurised water main and it ruptured. The consequent release of water behind the wall quickly overloaded it and caused the wall to overturn about its base.

Underlying the incident was the lack of understanding of the risk posed to the structure and to the open railway from coring in proximity to the water main.

The RAIB has made two recommendations to Network Rail. The first relates to the competence of its staff and contractors, and the availability of information to enable them to manage the potential risk to its structures from breaches of water utilities. The second relates to the provision of appropriate engineering input to risk assessments for intrusive investigations and masonry repairs on bridges carrying water services. A further recommendation is made to Network Rail’s contractor, Construction Marine Limited, about the improvement of processes relating to street works and the location of water services.

The report has identified a learning point to reinforce the requirement for bridge examiners to report evidence of underground services and any changes since the previous inspection to enable a possible connection to be drawn between a water main and observations of defects on the bridge.

Response to recommendations:

  • RAIB will periodically update the status of recommendations as reported to us by the relevant safety authority or public body
  • RAIB may add comment, particularly if we have concerns regarding these responses.