Regulations: Enforcement Undertakings accepted by OPSS
Summaries of Enforcement Undertakings from businesses accepted by OPSS and their associated Completion Certificates.
Certain regulations allow businesses to propose Enforcement Undertakings to the Office for Product Safety and Standards (OPSS). These are commitments to take specific actions within specified timeframes in order to address non-compliance.
Enforcement Undertakings are assessed by OPSS on a case-by-case basis and, if agreed, accepted. Decisions are made in line with our Enforcement Policy.
Read further information about Enforcement Undertakings
When OPSS is satisfied that the commitments in an Enforcement Undertaking are met, it issues an associated Completion Certificate.
A Completion Certificate can be applied for at any time. When making the application, the business needs to provide sufficient information to enable OPSS to determine that the actions in its Enforcement Undertaking have been completed.
Electric Vehicle (Smart Charge Points) Regulations 2021
The Enforcement Undertakings in the table below have been accepted by OPSS in accordance with the enforcement powers given in Schedule 2 of the Electric Vehicles (Smart Charge Points) Regulations 2021.
Active Enforcement Undertakings
| Business and registration number | Start and end dates | Link to summary |
|---|---|---|
| Chargemaster Limited trading as BP Pulse (06720009)- 3 year warranty replacements | 30/06/2022 to 01/06/2028 | |
| Chargemaster Limited trading as BP Pulse (06720009)- 3 year warranty replacements | 14/07/2025 to 01/06/2028 | |
| IDE Systems Limited (4973527) | 05/07/2022 to 30/06/2027 | |
| MyEnergi Limited (10261262)- 3 year warranty replacements | 13/12/2023 to 30/12/2027 |
Expired Enforcement Undertakings
The Enforcement Undertakings in the table below have expired and are no longer in force.
| Business and registration number | Start and end dates | Link to summary |
|---|---|---|
| British Gas New Heating Limited (06723244) | 30/12/2022 to 30/12/2025 | |
| DropNet Limited (13222370) | 25/06/2024 to 15/12/2024 | |
| Indra Renewable Technologies Limited (08740976) | 30/12/2022 to 31/12/2025 | |
| Juuce Limited trading as EO Charging Limited (09314212) - warranty replacements only | 30/06/2022 to 01/07/2025 | |
| Shenzhen EN Plus Tech Company Limited | 30/12/2022 to 31/12/2024 |
Completion Certificates
A Completion Certificate is required to discharge an Enforcement Undertaking. It does not certify that a charge point is compliant. The Enforcement Undertakings in the table below have been issued a completion certificate.
| Business and registration number | Enforcement Undertaking start and completion dates | Link to summary |
|---|---|---|
| 247 EV Limited (13272622) | 30/12/2022 to 01/02/2023 | |
| ABB E-Mobility UK Limited (13519130) | 30/06/2022 to 30/11/2022 | |
| Badger Power Limited (13764655) | 30/06/2022 to 31/05/2023 | |
| Charge Amps AB (13671012) | 06/07/2022 to 01/10/2022 | |
| Chargemaster Limited trading as BP Pulse (06720009) | 30/06/2022 to 31/03/2023 | |
| Chargemaster Limited trading as BP Pulse (06720009) | 30/06/2022 to 31/03/2023 | |
| Chargemaster Limited trading as BP Pulse (06720009) | 30/06/2022 to 31/03/2023 | |
| Chargemaster Limited trading as BP Pulse (06720009) | 30/06/2022 to 08/09/2023 | |
| Charged Electric Vehicles Limited (12702971) | 30/12/2022 to 30/01/2023 | |
| City Electrical Factors Limited (00336408) | 04/01/2023 to 01/04/2023 | |
| Compleo Charging Solutions UK Limited (11097731) | 30/06/2022 to 29/03/2024 | |
| CTEK Limited (556540-3234) | 30/12/2022 to 30/04/2024 | |
| Curv360 Ltd T/A Project EV (09840071) | 12/01/2023 to 01/04/2023 | |
| Drivenergy Limited (09053276) | 30/06/2022 to 31/12/2024 | |
| E.ON Energy Solutions Limited (03407430) | 30/06/2022 to 01/09/2022 | |
| E.ON Energy Solutions Limited (03407430) | 30/12/2022 to 31/07/2024 | |
| Eaton Electric Limited (04617032) | 22/02/2023 to 31/05/2024 | |
| Eaton Electric Limited (04617032) | 23/06/2023 to 01/08/2024 | |
| Equans EV Solutions Limited (07214557) | 20/03/2023 to 30/06/2023 | |
| Evec Limited (13715318) | 12/01/2023 to 01/10/2023 | |
| Ford Motor Company (235446) | 30/06/2022 to 30/12/2024 | |
| Free2Move eSolutions UK Limited (14180476) | 30/12/2022 to 31/07/2024 | |
| Garo Electric Limited (GB 338627574) | 15/03/2023 to 31/12/2024 | |
| House Group Developments Limited trading as waEV Charge (08928156) | 30/12/2022 to 31/07/2023 | |
| Hydra EVC Limited (13604117) | 30/06/2022 to 19/08/2022 | |
| Hydra EVC Limited (13604117) | 30/12/2022 to 30/06/2023 | |
| IES Synergy | 12/04/2024 to 30/09/2024 | |
| Juuce Limited trading as EO Charging Limited (09314212) | 30/06/2022 to 31/12/2022 | |
| Keba Limited (13781946) | 08/12/2023 to 30/06/2024 | |
| Luceco Plc T/A BG SyncEV (05254883) | 30/12/2022 to 31/08/2024 | |
| Medlock Electrical Distributors Limited (431947) | 05/01/2023 to 30/06/2023 | |
| Mer Fleet Services Limited (09002413) | 01/02/2023 to 30/06/2023 | |
| MyEnergi Limited (10261262) | 30/12/2022 to 24/01/2023 | |
| Rolec Services Limited (02294468) | 30/06/2022 to 14/10/2022 | |
| Schneider Electric (UK) Limited (02886434) | 30/12/2022 to 01/07/2023 | |
| Schneider Electric (UK) Limited (02886434) | 08/12/2023 to 30/06/2024 | |
| Shanghai Moss Huade Photoelectric Company Limited (913101153208131900) | 30/06/2022 to 31/08/2022 | |
| Shell EV Charging Solutions UK Limited trading as Shell Recharge Solutions (10296832) | 30/06/2022 to 30/10/2022 | |
| Shell EV Charging Solutions UK Limited trading as Shell Recharge Solutions (10296832) | 30/12/2022 to 30/04/2024 | |
| SmartEV Limited trading as Sevadis (10559843) | 30/12/2022 to 30/06/2024 | |
| Swarco UK Limited (2754698) | 19/08/2022 to 01/12/2022 | |
| T.R. Ventures Limited trading as Ultralec (07757720) | 30/12/2022 to 01/12/2023 | |
| Teltonika Energy (305956642) | 06/04/2023 to 30/09/2023 | |
| Toyota Motor Europe (GB558.611.818) | 12/04/2024 to 22/07/2024 | |
| Virtus Energy Limited (12080810) | 30/12/2022 to 30/01/2023 | |
| Wallbox UK Limited (GB309208713) | 30/06/2022 to 25/10/2022 | |
| Wallbox UK Limited (GB309208713) | 30/12/2022 to 31/12/2023 | |
| Wallbox UK Limited (GB309208713) - warranty replacements only | 02/01/2023 to 30/06/2024 | |
| Wallbox UK Limited (GB309208713) | 30/12/2023 to 30/06/2024 | |
| Webasto Thermo and Comfort UK Limited (2191825) | 02/08/2022 to 31/10/2023 | |
| Yesss Electrical Limited (07650325) | 30/12/2022 to 30/06/2023 | |
| Zaptec UK Limited (13185808) | 30/06/2022 to 31/10/2022 | |
| Zaptec UK Limited (13185808) | 30/12/2022 to 31/03/2023 | |
| Zaptec UK Limited (13185808) | 30/12/2022 to 31/12/2023 |
Unable to close down
OPSS issues a Completion Certificate when OPSS is satisfied that all actions in an Enforcement Undertaking have been completed. However, in some cases, OPSS is unable to issue a Completion Certificate for an Enforcement Undertaking – for example where a business is no longer trading or has ceased operations (the company has been dissolved) or cannot be contacted despite reasonable efforts.
In these cases, OPSS will continue to monitor market risk. Where OPSS due diligence indicates that the non-compliant product is no longer being sold, there is no evidence of non – compliance, and the risk is low, OPSS will not take further enforcement action in respect of the specific breaches covered by the Enforcement Undertaking unless new information becomes available.
In line with OPSS Enforcement Policy and the publication provisions in Part 4 (Publication of enforcement action) of Schedule 2 of the Electrical Vehicles (Smart Charge Points) Regulations 2021, OPSS will publish and retain details of these Enforcement Undertakings on Gov.UK for five years to support transparency. During this period, OPSS will keep the matter under review and may take appropriate action if new information becomes available indicating risk or ongoing non-compliance
Manufacturers
| Business and registration number | Start and end dates | Link to summary |
|---|---|---|
| Enel X Way (10949960) | 01/07/2022 to 31/12/2022 | |
| EV Box UK and Ireland Limited (10141758) | 30/06/2022 to 01/07/2024 | |
| EV Box UK and Ireland Limited (10141758) - warranty replacements only | 06/03/2022 to 01/11/2025 | |
| Powerhubb (13143983) | 03/08/2022 to 31/05/2024 |
Distributors
| Business and registration number | Start and end dates |
|---|---|
| Amble Electrical Distributors Limited (03159446) | 23/08/2022 to 14/10/2022 |
| B.E.D. (Corby) Limited (02671639) | 08/07/2022 to 12/10/2022 |
| BeeWired Limited (07435698) | 05/08/2022 to 31/12/2022 |
| Boyle Energy Limited (SC574517) | 01/08/2022 to 31/12/2022 |
| CCL Components Limited (SC180630) | 17/04/2023 to 31/12/2023 |
| CCL Components Limited (SC180630) | 27/04/2023 to 30/06/2024 |
| CDR Electrical Wholesalers Limited (06373619) | 21/02/2023 to 30/12/2023 |
| Electricbase Limited (06389807) | 17/08/2022 to 14/10/2022 |
| The Electrical Network Limited (SC200506) | 06/09/2022 to 06/10/2022 |
| Energise EV Limited (12168500) | 01/08/2022 to 21/12/2022 |
| Engage EV Limited (12329783) | 01/08/2022 to 31/12/2022 |
| EV Chargers Limited (12626410) | 24/11/2023 to 31/03/2024 |
| EV ETC Limited (12975640) | 01/08/2022 to 21/12/2022 |
| Stage Left Productions Limited trading as EV Solutions (06194428) | 01/08/2022 to 31/12/2022 |
| Get charging Limited (10819350) | 30/12/2022 to 30/06/2024 |
| LED Electrical Limited (02865572) | 24/01/2023 to 31/12/2023 |
| (Response) EPR Limited trading as Smart Home Charge (07081588) | 27/01/2023 to 31/05/2023 |
Updates to this page
-
Each section has been updated to reflect changes to Enforcement Undertakings which have been accepted, expired or issued a Completion Certificate. A new section has been added which lists the businesses who have an expired Enforcement Undertaking, but where it has not been possible to issue a Completion Certificate.
-
Content revised to separate current and expired Enforcement Undertakings, publish the Completion Certificates requested by businesses, and include the relevant Enforcement Undertaking summary in all Enforcement Undertakings and Completion Certificates.
-
First published.