Bulletin: BDUK Delivery Performance, quarterly: July 2026 to September 2026
Published 19 November 2026
1. About this release
This quarterly official statistics report presents how many premises in the United Kingdom have received a gigabit-capable broadband connection as a result of Building Digital UK (BDUK) subsidy. The latest figures cover premises that received gigabit-capable coverage through BDUK subsidy between 1 July 2026 and 30 September 2026 (Q2 2026/27). This publication includes updates to previously reported delivery figures.
The quarterly Official Statistics series starts from Q1 2024/25, following the increased maturity of BDUK systems, which enabled BDUK to move from annual to quarterly publications.
For readability, each release covers a rolling period of a fixed number of quarters. As new quarters are added, the oldest quarters are removed to maintain a consistent reporting window.
All figures are rounded to the nearest 10 and may not sum to the totals shown.
2. Headline findings
We estimate that BDUK interventions delivered gigabit-capable broadband coverage to 64,760 premises in Q2 2026/27, an increase of 18,770 (41%) premises compared with Q2 2025/26.
Since the launch of BDUK gigabit programmes, an estimated cumulative total of 1,537,400 premises have received gigabit-capable coverage through BDUK subsidy.
Delivery in Q2 2026/27 was primarily driven by Gigabit Infrastructure Subsidy (GIS) contracts, which accounted for 92% (59,900 premises) of all premises passed during the second quarter of the year. Voucher schemes contributed 4% (2,720 premises), while Superfast interventions accounted for the remaining 3% (2,130 premises). The Hubs intervention reached the end of its delivery phase in late 2025/26 and therefore did not contribute to the overall number of premises passed in Q2 2026/27. The figures reported for GIS do not include delivery for contracts in Scotland in which BDUK is not the leading authority.
Delivery in Q2 2026/27 continued to be concentrated in rural areas, which represented 90% (57,990 premises) of all the premises passed during the quarter. This pattern was also reflected at local authority level, with some of the highest delivery volumes recorded in large rural local authorities, Somerset recording the highest number of premises passed (2,230), followed by Wiltshire (2,030), and North Yorkshire (1,810).Most premises passed were residential properties. In Q2 2026/27, 90% (58,180 premises) were classified as residential and 9% (5,960 premises) as commercial.
England accounted for approximately three quarters of the delivery 75% (48,680 premises) followed by Scotland (13%, 8,350 premises), Wales (10%, 6,490 premises), and Northern Ireland (2%, 1,190 premises).
3. Overview
This bulletin presents quarterly official statistics on the delivery performance of Building Digital UK (BDUK) for the period 1 April 2024 to 30 September 2026, with a particular emphasis on Q2 2026/27. It includes breakdowns by:
-
Time period (quarters)
-
Geographies
-
Urban/rural classification
-
Commercial/residential classification
-
Whether the premises are in the Ofcom premises base
-
Broadband speed classification
-
Intervention type
4. Overall delivery trends
By the end of September 2026, the cumulative number of premises to which BDUK has delivered gigabit-capable coverage since the inception of its gigabit programmes in 2012 reached 1,537,400. Of these, 64,760 premises were delivered between 1 July and 30 September 2026.
Figure 1 shows delivery from Q1 2024/25 to Q2 2026/27. Premises passed in the second quarter of 2026/27 present a noticeable increase with respect to those achieved in the equivalent quarter of 2025/26. GIS recorded its highest quarterly delivery since Q1 2024/25, which, combined with legacy Vouchers and Superfast delivery, resulted in the highest overall quarterly delivery across the period shown.
Figure 1: Premises passed by quarters, UK, 1 April 2024 to 30 September 2026
Total delivery in Q2 2026/27 shows an increase of 18,770 premises passed in the number of premises passed compared to Q2 2025/26. Figure 2 shows how these trends differ by intervention. GIS delivery increased in Q2 2026/27 as additional contract areas became operational and delivery progressed on existing contracts. In contrast, delivery through Vouchers and Hubs, and Superfast programme, continued the gradual downward trend that was already apparent at the beginning of 2026/27, reflecting their progression into the final stages of delivery. The figures reported for GIS do not include delivery for contracts in Scotland for which BDUK is not the leading authority.
Figure 2: Quarterly delivery trends by BDUK intervention, UK,1 April 2024 to 30 September 2026
5. Geographic distribution of delivery
Delivery across the UK reflects differing levels of maturity in delivery programmes, with countries at different stages. In particular, the figures reported for GIS do not include delivery for contracts in Scotland for which BDUK is not the leading authority.
5.1 By country
Of the 64,760 premises passed in Q2 2026/27:
-
75% (48,680 premises) were delivered in England
-
13% (8,350 premises) in Scotland
-
10% (6,490 premises) in Wales
-
2% (1,190 premises) in Northern Ireland
Figure 3 shows the distribution of premises passed by country in each quarter from Q1 2024/25 to Q2 2026/27.
Figure 3: Premises passed by country, UK, 1 April 2024 to 30 September 2026
England consistently accounted for the largest share of delivery throughout the period, representing 77% in Q2 2025/26 and 75% in Q2 2026/27. Although its share fluctuated between quarters, it remained higher than at the beginning of the period, when England accounted for 60% of delivery in Q1 2024/25. Delivery was particularly concentrated in large rural Gigabit Infrastructure Subsidy (GIS) contract areas. This should, however, be considered in the context of England accounting for approximately 83% [footnote 1] deliverable premises. Furthermore, these figures exclude delivery under contracts in Scotland where BDUK is not the lead delivery authority.
Scotland accounted for the second-largest share in all quarters. Scotland’s share has remained relatively stable with only a small decline over the period, from 14% in Q2 2025/26 to 13% in Q2 2026/27. As mentioned above, new GIS contracts in Scotland for which BDUK is not the leading authority are not included in these figures. For reference, approximately 9% of UK premises are located in Scotland.
Wales remained a relatively small contributor throughout the period, accounting for 10% share of delivery in Q2 2026/27 and 10% of all BDUK delivery. While its share generally remained stable, it fell below 5% in Q1 2024/25 and reached a peak of 12% in Q3 2024/25. For reference, approximately 5% of UK premises are located in Wales.
Northern Ireland accounted for a very small share in every quarter from Q2 2024/25 (3% or below), representing around 2% of delivery in Q2 2026/27. The decrease largely reflects the completion of major broadband roll-out programmes in earlier years. According to the latest (Spring 2026) Ofcom Connected Nations update, 95% of Northern Ireland premises already have access to gigabit-capable broadband, compared with 88% across the UK. A lower share of ongoing delivery is therefore expected.
5.2 By region
Within England, the South West recorded the highest level of delivery in Q2 2026/27, with 11,520 premises passed, followed by the East of England (6,440 premises) and the North West (6,360 premises).
Higher levels of delivery continued to be observed in predominantly rural regions, where commercial rollout is more challenging and subsidy interventions are more likely to be required. Several regions recorded stronger delivery in the second quarter of 2026/27 compared to the same quarter in 2025/26, likely reflecting additional Gigabit contract areas becoming operational. Conversely, other regions saw a decrease in delivery, as some BDUK-subsidised delivery nears completion.
5.3 By local authority district
The local authority districts with the highest levels of delivery in Q2 2026/27 were in a small number of large, predominantly rural areas. Somerset recorded the highest delivery (2,230 premises), followed by Wiltshire (2,030) and North Yorkshire (1,810). This pattern extended across the top 10, which also included Cheshire East (1,750 premises), Westmorland and Furness (1,630), County Durham (1,200) and Cumberland (1,180) in northern England; Carmarthenshire (1,540) in Wales; Malvern Hills (1,410) in the West Midlands; and West Devon (1,710) in south-west England.
Table 1. Top 10 local authority districts by premises passed, UK, 1 July 2026 to 30 September 2026
| Local Authority District | Premises Passed |
|---|---|
| Somerset | 2,230 |
| Wiltshire | 2,030 |
| North Yorkshire | 1,810 |
| Cheshire East | 1,750 |
| West Devon | 1,710 |
| Westmorland and Furness | 1,630 |
| Carmarthenshire | 1,540 |
| Malvern Hills | 1,410 |
| County Durham | 1,200 |
| Cumberland | 1,180 |
These patterns confirm previous trends, with the highest levels of delivery concentrated in rural areas where subsidy is targeted at harder-to-reach premises and wider commercial deployment is less likely. Delivery in these areas is typically associated with large Gigabit Infrastructure Subsidy (GIS) contract areas, which span extensive geographic regions with lower population density.
5.4 By rural/urban classification
In Q2 2026/27 57,990 premises (90%) delivered by BDUK were in rural areas. This reflects the continued focus of subsidy on harder-to-reach locations where commercial deployment is less viable. Urban areas accounted 10% of delivery[footnote 2] .
Figure 4 shows the distribution of premises passed by rural and urban classification over time. Delivery has been consistently concentrated in rural areas, which accounted for between 85% and 93% of total delivery across the period.
Figure 4. Delivery by grouped rural and urban classification, UK, 1 April 2024 to 30 September 2026
The increase in total delivery in Q2 2026/27 was therefore driven primarily by rural areas, with urban delivery remaining a small and relatively stable proportion of the total. This distribution remained broadly consistent across all the represented quarters.
6. By premises characteristics
6.1 By premises type
Most premises passed were residential properties. In Q2 2026/27, 90% (58,180) of premises passed were classified as residential and 9% (5,960) as commercial.
Figure 5. Delivery by premises type, UK, 1 April 2024 to 30 September 2026
Figure 5 highlights that residential premises continued to account for the majority of subsidised delivery. The composition of delivery by premises type remained stable over time, with residential premises consistently accounting for the large majority of BDUK delivery. This distribution remained broadly consistent across all the represented quarters. For reference, approximately 94% of UK premises are classified as residential[footnote 3].
6.2 By Superfast availability (>30 Mbit/s)
An estimated 14,400 premises (22%) delivered in Q2 2026/27 did not previously have access to superfast broadband speeds of at least 30 Mbit/s. The methodology used to assess whether premises previously had access to superfast broadband has been updated for figures from 1 April 2021 onwards. The updated approach uses broadband speed information in relation to the timing of delivery to provide a more consistent historical classification of premises. Further details are available in the Quality and Methodology Information (QMI).
Figure 6. Delivery by availability of superfast broadband, UK, 1 April 2024 to 30 September 2026
Figure 6 shows how the composition of delivery by broadband availability has changed over time. Before 2021, most delivery was to premises without superfast broadband (86%, 529,890 premises). However, this proportion has declined rapidly over time as overall levels of superfast coverage have increased across the country. This reflects both the expansion of superfast availability in the UK and changes in the focus of BDUK interventions. While the Superfast programme was primarily targeted at premises without access to superfast broadband, more recent contracts (i.e. GIS, Vouchers, Hubs) support delivery to both premises without superfast coverage and those already able to access superfast services. As a result, a decreasing proportion of delivery has been directed towards premises without superfast broadband.
In Q2 2026/27, the proportion of delivery to premises without superfast coverage remained broadly stable compared to Q2 2025/26 and the beginning of the year. More broadly, as gigabit delivery has expanded, an increasing share of delivery has supported upgrades to higher-capacity broadband infrastructure rather than first-time access to superfast speeds.
7. Overall delivery trends by year (revised figures)
Figure 7 shows annual premises passed by intervention type from 2021/22 to 2025/26. Over this period, delivery has shifted away from Superfast in the earlier years, through a period dominated by Vouchers and Hubs, towards Gigabit Infrastructure Subsidy (GIS), which by 2024/25 had become the principal intervention. Annual delivery reached its highest level in the series in 2025/26, at 196,640 premises, driven by GIS, which accounts for roughly three quarters of premises passed in that year.
Figure 7: Premises passed by BDUK intervention, UK, 2021/22 to 2025/26
Annual totals were 149,090 in 2021/22, 164,960 in 2022/23, 151,320 in 2023/24, 150,090 in 2024/25 and 196,640 in 2025/26. These figures have been revised slightly compared to the figures reported in the previous bulletin (BDUK delivery performance, quarterly: April 2026 to June 2026), as additional information becomes available over time and late-reported connections are incorporated. The most notable revision relates to 2025/26, where the total has been revised upwards by around 5,800 premises compared with the previously reported figure of 190,840. This primarily reflects updates to historical GIS delivery records following supplier resubmissions, changes in the availability of valid contract data and the ingestion of updated information into BDUK systems. Figures for 2026/27 are excluded from this comparison, as estimates are currently available for only part of the financial year.
8. Revisions and changes from previous releases
This is BDUK’s quarterly official statistics release and builds on the figures previously published in the annual statistical series.
Historical figures are revised in each release to incorporate improved supplier reporting and updated delivery information. These revisions may alter:
-
delivery dates
-
intervention classification
-
the number of premises passed
Key revisions compared to the previously published figures in BDUK Delivery Performance, Quarterly: April 2026 to June 2026
-
GIS: Around 8,470 premises have been added to the previously reported Gigabit Infrastructure Subsidy (GIS) delivery figures up to 30 June 2026 (249,660 premises passed). This primarily reflects changes in the number of valid supplier submissions. These revisions relate to previously reported delivery and do not necessarily represent additional delivery.
-
Vouchers: Around 570 premises have been added to the previously reported Vouchers delivery figures up to 30 June 2026 (387,890 premises passed), reflecting improvements to the data collection methodology, more accurate supplier returns, and enhancements to data quality within BDUK systems. See Quality and Methodology Information (QMI) for details.
-
Superfast: Around 700 premises have been added to the previously reported Superfast delivery figures up to 30 June 2026 (819,590 premises passed). This primarily reflects the inclusion of additional historical contract data into BDUK systems and improvements in data quality.
-
Hubs: Revisions to the previously reported delivery figures up to 30 June 2026 (5,770 premises passed) were minimal, affecting fewer than five premises.
9. Publication information
9.1 Data sources
We used the following data sources for this quarterly Q2 2026/27 performance report:
-
BDUK management information as of 10 November 2026.
-
Ofcom Connected Nations: May 2026 data from Spring Update 2026
-
Ordnance Survey (OS) AddressBase Premium: Epoch 131- Scottish Postcode Directory: March 2026
9.2 Methodological improvements
BDUK updates its historical time series with each release. This is because BDUK works closely with suppliers to improve the quality of their reporting; when improvements are made, we may receive revised information that alters the original delivery date of a premises or corrects the number of premises passed. This has resulted in changes to historical data, with movement between interventions and delivery periods.
In this release, BDUK has updated the methodology used to identify premises that did not have access to superfast broadband speeds of at least 30 Mbit/s before receiving gigabit-capable connectivity through a BDUK intervention. The updated approach uses broadband speed information available in relation to the timing of delivery, providing a more consistent historical classification of premises.
The updated methodology has been applied to figures from 1 April 2021 onwards and has resulted in some premises being reclassified compared with previous publications. This affects the classification of premises as previously having or not having access to superfast broadband, rather than the underlying number of premises delivered through BDUK-funded interventions. A detailed explanation of the methodology is available in the Quality and Methodology Information (QMI).
9.3 Known issues
-
BDUK is currently developing a methodology to improve the identification of Unique Property Reference Numbers (UPRNs) for addresses that do not currently have an associated UPRN, which will improve the accuracy of our counting methodology.
-
BDUK is reviewing the data quality of its vouchers and updating the associated multiplier methodology.
-
BDUK is also reviewing its overbuild methodology to improve the identification of overbuild in future releases. The definition for overbuild is available in the Quality and Methodology Information (QMI)
9.4 Official Statistics
The BDUK Delivery Performance Statistics are labelled as official statistics and has been produced to the standards set out in the Code of Practice for Statistics.
Our statistical practice is regulated by the Office for Statistical Regulation (OSR). OSR sets the principles of trustworthiness, quality and value in the Code of Practice for Statistics that all producers of official statistics should adhere to.
You are welcome to contact us directly with any comments about how we meet these standards by emailing bduk.statistics@dsit.gov.uk. Alternatively, you can contact OSR by emailing regulation@statistics.gov.uk or via the OSR website.
9.5 Pre-release access
The accompanying pre-release access document lists ministers and officials who have received privileged early access to this release. In line with best practice, the list has been kept to a minimum and those given access for briefing purposes had a maximum of 24 hours.
9.6 Contact
Responsible Statistician: A S Bhopal, Statistics and Data Intelligence Lead, Building Digital UK (BDUK) Directorate.
Author: M Zottoli, Senior Statistical Officer
Email: bduk.statistics@dsit.gov.uk
Please contact us at the above email with any questions or suggestions for improvements.
-
The proportion of UK premises located in each Nation has been calculated using the ‘Premise Base’ figures published by Ofcom in their latest (Spring 2026) Connected Nations update ↩
-
Less than 0.1% of records are classified as Unknown due to lack of appropriate matching ↩
-
The proportion of UK premises classified as residential is consistent with the Premise Base figures published by Ofcom in their latest (Spring 2026) Connected Nations update. ↩