Water Management grant round 3: item specification and grant contribution
Published 19 November 2026
Applies to England
Your final grant payments will be based on the reference cost contribution for the items you need or 40% of the actual invoice costs at claim stage, whichever is the lower amount. This helps ensure the grant fund is distributed fairly.
WMG01 - Earth bank water storage reservoir with clay liner
Grant contribution (40% intervention rate)
£3.60 per cubic metre (m3) for the first 10,000m3, then £0.90 per m3 above 10,000 m3
Specification
Construction of an earth-banked, clay lined irrigation reservoir.
The reservoir must be designed and constructed in accordance with all applicable planning, water-resources, flood-risk, land-drainage, environmental, nature-conservation and health-and-safety legislation. The applicant must obtain all necessary planning permissions, prior approvals, abstraction or impounding licences, environmental permits and watercourse consents before work commences. Further details can be found in the reservoir owner and operator requirements guidance on GOV.UK.
The reservoir’s design and construction must comply with the Reservoirs Act 1975 and have regard for CIRIA R161.
Extension or modification of existing reservoirs are not eligible under this item.
Reference costs include:
- excavation of reservoir base and area of reservoir walls
- excavation of subsoil for below ground element
- construction of reservoir walls and lining from excavated subsoil including compacting of material
- application of site topsoil to landscape external wall of reservoir
- overflow and spillway
Reference costs do not include (this list is not exhaustive):
- synthetic liner
- abstraction point including pump
- electricity installation
- fencing
- filtration equipment
- irrigation pumps and controls
- inlet and outlet pipework
- pumphouse
- design fees
- engineer fees
- statutory and local authority fees
- legal costs
Refer to the Water Management grant round 3 guidance on GOV.UK for further information.
WMG02 - Earth bank water storage reservoir with synthetic liner
Grant contribution (40% intervention rate)
£4.40 per m3 for the first 10,000m3, then £1.10 per m3 above 10,000 m3
Specification
Construction of an earth-banked, synthetically lined irrigation reservoir.
The reservoir must be designed and constructed in accordance with all applicable planning, water-resources, flood-risk, land-drainage, environmental, nature-conservation and health-and-safety legislation. The applicant must obtain all necessary planning permissions, prior approvals, abstraction or impounding licences, environmental permits and watercourse consents before work commences. Further details can be found in the reservoir owner and operator requirements guidance on GOV.UK.
The reservoir’s design and construction must comply with the Reservoirs Act 1975 and have regard for CIRIA R161.
Extension or modification of existing reservoirs are not eligible under this item.
Reference costs include:
- excavation of reservoir base and area of reservoir walls
- excavation of subsoil for below ground element
- construction of reservoir walls from excavated subsoil including compacting of material
- supply and installation of synthetic liner
- application of site topsoil to landscape external wall of reservoir
- overflow and spillway
It is recommended that the liner should have a life expectancy of more than 10 years and be made from material resilient or stabilised to ultra violet (UV).
Reference costs do not include (this list is not exhaustive):
- abstraction point including pump
- electricity installation
- fencing
- filtration equipment
- irrigation pumps and controls
- inlet and outlet pipework
- pumphouse
- design fees
- engineer fees
- statutory and local authority fees
- legal costs
Refer to the Water Management grant round 3 guidance on GOV.UK for further information.
WMG03 - Above-ground water storage tanks
Grant contribution (40% intervention rate)
£28.40 per m3
Specification
Construction of an above-ground circular tank formed from curved galvanised steel panels bolted together with corrosion-resistant fixings with a protected top edge to allow for the fixing of a cover. Installed on a concrete base. Tank must hold a minimum of 100m3 (100,000 litres) of water.
The tank shall be designed and constructed in accordance with the relevant parts of BS EN 1993, fabricated and executed in accordance with BS EN 1090, and the relevant parts of BS5502 or equivalent recognised standards.
Reference costs include:
- supply and construction of tank
- excavation for foundation and base
- supply, laying and consolidating of hardcore for base
- supply, pour and laying of concrete base including any necessary reinforcement
- supply and installation of a liner where required
- supply and installation of an anti-algae tank cover
-
provision of connections for inlet pipe, outlet pipe and overflow where required
- provision of float valve or level-controlled filling arrangement where required
Reference costs do not include (this list is not exhaustive):
- electricity installation
- filtration equipment
- pumps and controls
- design fees
- engineer fees
- statutory and local authority fees
- legal costs
Refer to the Water Management grant round 3 guidance on GOV.UK for further information.
WMG04 - Underground water distribution main for irrigation
Grant contribution (40% intervention rate)
£12 per metre
Specification
Installation of high-density polyethylene (HDPE) or metal underground distribution main that will be physically connected to a water storage reservoir and used with above ground irrigation equipment.
Distribution mains for other materials, for example slurry, digestate, fertiliser or crop nutrients are not eligible under this item.
Distribution mains for transferring mains water or recycled water are not eligible under this item.
Reference costs include:
- excavation of trench
- supply of pipework and connectors
- laying of pipework in the trench
- supply and installation of hydrants along the pipework
- back filling of trench
Reference costs do not include (this list is not exhaustive):
- above ground distribution pipework
- above ground irrigation pipework
- irrigation sensors and control valves
- irrigation equipment including pipework for application of water, for example trickle, capillary, mist and sprinkler systems
- electricity installation
- pumps
- filters
- engineer fees
- design fees
- statutory and local authority fees
- legal costs
Refer to the Water Management grant round 3 guidance on GOV.UK for further information.