Treating and using water that contains concrete and silt at construction sites: RPS 235
When you can treat and use water that contains concrete and silt at construction sites without an environmental permit for a waste operation.
Applies to England
Documents
Details
If you comply with the conditions in this regulatory position statement (RPS) you can treat and use water that contains concrete and silt at construction sites without an environmental permit for a waste operation.
Updates to this page
Last updated 20 November 2020 + show all updates
-
We have added a paragraph on how you can treat water in the 'Conditions you must comply with' section. This specifies when you can use chemicals and accommodates some low risk industry-wide practices.
-