Notice

Taggs Island contractor works Dec 2019: river restriction notice

Published 6 December 2019

This notice was withdrawn on

River restriction no longer in force.

When

Monday 9 December to Friday 20 December.

Where

Molesey Reach: Taggs Island, Surrey channel.

Details

Between Monday 9 December 2019 and Friday 20 December 2019, contractors will be carrying out works at Taggs Island in the Surrey, left hand channel.

Navigation may be restricted by the presence of a floating platform and/or other necessary equipment.

Masters of all boats should maintain a safe speed and lookout between Molesey Lock and the tail of Taggs Island.

All boats must be navigated in accordance with any instructions given from Environment Agency control points or patrol launches.

Those in charge of boats should be aware that they are responsible for avoiding collision and should use all available means appropriate to the circumstances and conditions to decide if there is a risk of immediate danger and avoid it.

All directions as to the left and right hand side of the river are given looking upstream.

Byelaws

Nothing contained in these directions shall supersede those parts of the Thames Navigation Licensing and General Byelaws 1993 as may be relevant.

And Notice is hereby given, that it is provided by Byelaw 52 of the Thames Navigation Licensing and General Byelaws, 1993 that:

The master of any vessel shall except in an emergency not pass any boat-race regatta public procession or gathering for the launch of a vessel or any other event or function which may cause a crowd to assemble on or by the river nor station his vessel thereon in such a manner as would risk obstructing impeding or interfering with such boat-race regatta procession launching event or function or endangering the safety of persons assembling on the river or preventing or interfering with the maintenance of order thereon.

The maximum penalty for breach of the Byelaws is £1,000.