Guidance

Street works permits for electric vehicle charge point operators

How electric vehicle charge point operators can use street works permits to install chargepoints and related equipment.

Applies to England

Documents

Details

Electric vehicle charge point operators (EVCPOs) can use street works permits to install chargepoints and related equipment on the public highway.

This is as a result of changes introduced in 2025. This guidance explains the changes, including:

  • when CPOs should use a street works permit
  • how to access Street Manager, the digital platform for planning, managing and coordinating street works
  • highway authority responsibilities
  • the legislative background

Updates to this page

Published 19 March 2026

Sign up for emails or print this page