Policy paper

River Thames Scheme: environmental surveys

Extensive data collection has taken place within the River Thames Scheme study area.

Documents

Details

The surveys required in 2017 include continued groundwater monitoring at a number of agreed locations together with a range of ecological, habitat and archaeological surveys.

Published 20 April 2017