Map

Plans and Sections for HS2 Phase 2b (Crewe – Manchester)

The drawings provide details of the proposed works to support the High Speed Rail (Crewe – Manchester) Bill.

Documents

Plans: Volume 1 (Crewe - Agden and Ashley)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email HS2enquiries@hs2.org.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Plans: Volume 2 (Manchester Airport to Piccadilly Station - West Coast Main Line Connection - Off Route Works & Standing Order 29)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email HS2enquiries@hs2.org.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Sections: Volume 3.1 (Crewe - Lostock Gralam)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email HS2enquiries@hs2.org.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Sections: Volume 3.2 (Pickmere - Agden and Ashley)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email HS2enquiries@hs2.org.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Sections: Volume 4 (Manchester Airport to Piccadilly Station - West Coast Main Line Connection - Off Route Works)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email HS2enquiries@hs2.org.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The plans and sections are presented in volumes. At the start of each volume is a key plan which can be used to find specific locations on the plans.

The plans provide details of the following:

  • centre lines and limits of deviation for the proposed works
  • land that will be acquired or used for the purposes of building and operating High Speed Two (HS2)

A description of the land, together with details of ownership, occupiers and those who have a legal interest is included in the Book of Reference. The sections show specific parts of the HS2 Phase 2b (Crewe – Manchester) route and the proposed works. The level of works are illustrated in relation to the existing ground and features. They also show the maximum heights for certain buildings.

Volume 2 includes a map showing the proposed tramway required for Parliamentary Standing Order 29.

Published 24 January 2022