Offshore Wind Environmental Standards: principles and how to apply them

Published 23 November 2026

Applies to England and Wales

The purpose of this guidance is to set out how to interpret and apply the Offshore Wind Environmental Standards (OWES) throughout the consenting process for Leasing Round 5 offshore wind Nationally Significant Infrastructure Projects (NSIPs).

It provides offshore wind developers, Statutory Nature Conservation Bodies (SNCBs), regulators, and other statutory consultees with a clear framework for using the OWES. This will support consistent application of the mitigation hierarchy throughout project design and delivery. 

This guidance also aims to support greater clarity and consistency across the consenting process by setting the expectations for how the standards should inform project planning and environmental assessments. 

Why the OWES are important

It is becoming increasingly challenging and time-consuming to identify and agree appropriate avoidance, reduction, and mitigation measures for offshore wind projects.

As projects grow in scale and complexity, and as their cumulative environmental effects increase, the key challenge lies in identifying mitigation options that are practically deliverable but do not compromise the overall viability of projects. This can lead to lengthy discussions throughout the planning and consenting process.  

The OWES form part of the Offshore Wind Environmental Improvement Package (OWEIP), which supports the clean energy expansion while protecting the marine environment.

The standards establish consistent environmental expectations for avoiding, reducing and mitigating the impacts of offshore wind. This will help protect vulnerable wildlife and habitats across English and Welsh waters and help reduce delays in the consenting process.

The government’s Clean Power Action Plan and Nature Recovery targets 

The OWES form part of the government’s Clean Power Action Plan, which seeks to deliver a secure, affordable, zero carbon electricity system by 2030. Alongside energy commitments, the government has set statutory and non-statutory targets to recover nature, including Environment Act targets and the commitment to protect 30% of UK land and sea for nature by 2030 (‘30by30’). These commitments mean that offshore wind deployment should be delivered in a way that minimises and mitigates environmental impacts. 

The commitments include the UK Marine Strategy (UKMS) and the Marine Protected Areas (MPA) target, created under the Environment Act 2021. The MPA target, set out by the Environmental Targets (MPAs) Regulations 2023, requires that at least 70% of protected features in relevant MPAs in England are in a favourable condition by 31 December 2042, with the remaining features in a recovering condition. The Environment Act target delivery plan indicates that just 44% of protected features within the MPA network are in favourable condition. Achieving nature recovery will depend on the effective management of activities that significantly impact MPA habitats and species, alongside broader positive actions across the marine environment.

National Policy Statement for Renewable Energy (NPS EN-3) 

The OWES are issued in line with the National Policy Statement for Renewable Energy (NPS EN-3), which is the primary policy document used in decision-making for nationally significant renewable energy infrastructure in the UK, including offshore wind. In line with the Planning Act 2008, the Secretary of State must have regard to the NPS EN-3 when deciding whether to grant development consent for renewable energy infrastructure Nationally Significant Infrastructure Projects (NSIPs) and must decide the application in accordance with it unless an exception applies.

The NPS EN-3 details the government’s objectives for the delivery of NSIP related to renewable energy, including frameworks and policies that project developers are expected to take into consideration when applying for a Development Consent Order (DCO), including the OWES.

The standards may also complement or reinforce mitigation measures identified by The Crown Estate in any plan-level Habitats Regulations Assessment (HRA) produced as part of its leasing rounds.  

The NPS EN-3 explains the effect of this OWES guidance.  The DESNZ Secretary of State will expect developers to have applied the relevant standards to their application.  The Secretary of State will consider DCO applications in accordance with this guidance. Whether an application conforms to the OWES guidance (or the validity of any justification for departing from them) is likely to be material to the decision on the DCO application and, where relevant, will inform the HRA and Marine Conservation Zone (MCZ) assessments.

Developers will therefore be expected to outline how their proposals align with the OWES guidance or, alternatively, set the grounds on which a deviation from them is justified. 

Project scope 

The standards apply to offshore wind farms and related offshore wind electricity infrastructure. For offshore wind electricity transmission infrastructure, the standards will only apply to ‘electricity transmission connections between offshore electricity generation projects and the onshore transmission system’ covered within the definition of ‘offshore transmission’ within the NPS EN-3, glossary (as of December 2025).

All other forms of offshore transmission infrastructure (set out within the glossary definition of the NPS EN-3) are out of scope, such as interconnectors and bootstraps.  

Geographic scope 

The OWES apply to offshore wind developments and associated infrastructure that are defined as NSIPs from Leasing Round 5 onwards in waters where the Department for Energy Security and Net Zero (DESNZ) Secretary of State is responsible for approving DCO applications for England and Wales. The standards do not apply to projects in Scotland or Northern Ireland.  

NSIPs include the following offshore wind developments:  

  • in the English inshore (up to 12 nautical miles) and offshore (beyond 12 nautical miles) waters – this includes all offshore wind farms with a generating capacity of more than 100 megawatts (MW) 

  • in Welsh inshore and offshore waters – this includes all offshore wind projects greater than 350MW 

Developers of non-NSIPs – offshore wind developments less than 100MW in English waters and less than 350MW in Welsh waters – may also choose to apply the standards to their projects. While not required, their use is encouraged. 

Application of the OWES within the consenting process 

Statutory consultees, regulators, examiners, and other stakeholders reviewing a DCO application will expect to find the OWES embedded throughout the application with clear signposting within the Environmental Statement (ES). 

Environmental Impact Assessment (EIA) 

Developers are expected to reference the OWES within the ES, which supports their Environmental Impact Assessment (EIA). These standards help shape how environmental effects are assessed, support MPA assessments, and form avoidance and mitigation standards. 

Where an EIA-scoping opinion has been requested, developers should include a section within their scoping reports to provide early indication on their expected compliance with the OWES. At the application stage, this information should be included within the ES under the planning policy context chapter, where the National Policy Statements (NPS) are usually discussed.   

Developers will be expected to show how avoidance and mitigation will be incorporated into the project to reduce any likely significant effects. Developers should present each OWES they are using in a table format in the relevant receptor-based chapter in their ES, including any of the best practice measures they are adopting.  Developers should state clearly which OWES have been incorporated into the project, and signpost where the information is included in the application documents (including other relevant ES chapters and monitoring plans), and where they have been secured within the DCO or appropriate marine licence, such as the Deemed Marine Licence (DML).  

Where OWES have not been incorporated, a justification should clearly explain why each standard has not been applied and be supported by relevant evidence to provide a level of detail proportionate to the significance of the deviation and its potential environmental consequences. 

A Mitigation and Monitoring Schedule (MMS) should clearly set out the mitigation and monitoring measures that will be delivered by a project, ensuring that potential adverse effects that could arise from the project are avoided, reduced and mitigated in accordance with the mitigation hierarchy.  If using an MMS, developers should list any relevant OWES and ensure they are embedded within any receptor-specific monitoring or mitigation plans for the project. 

If the developer does not know the elements of the project design at the application stage, they should make a commitment in their application to use all efforts to apply the OWES at the appropriate stages of the process.  

Other assessments and tracking documents 

Mitigation measures are often outlined in other parts of the DCO application process. Those reviewing a DCO application will expect developers to clearly identify any mitigation measures that derive from the OWES. Documents where this might be required include the following. 

Habitats Regulations Assessment (HRA) 

If a ‘likely significant effect’ is identified, project impacts and any proposed mitigation measures must be evaluated for their effectiveness during the Appropriate Assessment. This should also include any OWES relevant to the protected feature[s] of the site designated under the Habitats Regulations. 

Marine Conservation Zone (MCZ) Assessment 

The MCZ assessment evaluates the potential impacts of the project on MCZ features and any proposed mitigation measures should be detailed to demonstrate how significant impacts will be avoided or reduced. This should include reference to any relevant OWES connected with MCZ features.  

Statements of Common Ground (SoCG) and Principal Areas of Disagreement Summary Statements (PADSS) 

These are written statements prepared by the applicant, consultee and other parties, setting out any matters on which they agree or disagree. A SoCG or PADSS helps to ensure that the evidence at the examination focuses on the material differences between the main parties and therefore makes best use of the lines of questioning pursued by the Examining Authority. Any agreements or disagreements in reference to applying OWES should be referenced in the SoCG or PADSS, where used. 

Commitments Register 

Where used, the Commitments Register should provide a clear and structured summary of all embedded and additional mitigation, monitoring, and compensation measures proposed across all project phases (pre-construction, construction, operation, and decommissioning). The Register should be used alongside the ES and its supporting documents and should clearly reference the applied OWES. 

How to secure OWES in marine licences 

As part of the consenting process, offshore wind projects require a marine licence under the Marine and Coastal Access Act 2009 for English and Welsh waters. 

For some projects, the Secretary of State may, on the recommendation of The Planning Inspectorate (PINS), include a DML within the DCO. This option is not available for Welsh inshore waters, where a DML cannot be granted.  

Where a DML is not included in the DCO, a marine licence must instead be obtained directly from either: 

  • Natural Resources Wales (NRW) for Welsh waters 

  • Marine Management Organisation (MMO) for English waters

Once OWES are embedded in a DCO application, they should be secured through the marine licence in the same way as any other mitigation measures. This must align with the standard licensing processes set out by the MMO or NRW, as described in the Marine licensing: nationally significant infrastructure projects and Nationally Significant Infrastructure Project - Advice on working with public bodies in the infrastructure planning process Annexes.  

In Welsh inshore waters, where a DML is not available, developers are expected to secure OWES exclusively through a standalone marine licence determined by NRW. Those reviewing a DCO application will expect OWES commitments presented within the DCO to be sufficiently detailed, transferable, and enforceable within the marine licensing regime. If developers fail to align DCO commitments with licensable conditions, this may result in delays or additional information requirements during the licence determination. 

If any applicable OWES are not appropriate for inclusion within a DCO or Marine Licence, such as standards relating to pre-application activities, developers need to demonstrate them through the relevant application and supporting documentation. 

Deviation process 

When deviation may be justified 

As outlined in the NPS EN-3, offshore wind developers may offer justification for departure from the OWES. As standards are tailored to each leasing round, there will be limited circumstances in which a project cannot fully implement a particular standard. Such instances are expected to be in exceptional circumstances and should not occur as standard practice. If there are expected circumstances where this may be likely, they are outlined in the guidance document for the relevant OWES. 

Potential factors affecting the feasibility or suitability of some OWES for an individual project may include situations where:  

  • any specific species, habitat, supporting habitat or protected sites or features referenced in the OWES are not present in the project development area 

  • implementing the OWES would cause significant health and safety concerns regarding the specific project 

  • the financial implications of implementing OWES are too great or disproportionate, supported by evidence of the additional costs  

  • applying an avoidance related OWES would result in a greater, unintended environmental impact elsewhere than the original predicted impact 

This is not an exhaustive list. 

Where it may not be possible to fully conform to an OWES, developers should still make attempts to partially conform before a justification for departure is provided. 

Evidence requirements 

Developers should evidence any deviations from the OWES within the relevant application documentation. Those reviewing a DCO application will expect developers to show why the deviation is the most appropriate option and to minimise the potential for later debate between developers, SNCBs and regulators during the consenting process. This could include survey data, modelling of environmental impacts or cost projections. Developers do not need to provide a separate standalone document.  

There may be instances where data or evidence needed to support one of the OWES will not be available prior to DCO submission. In this case, developers should make a commitment as part of a DCO condition to submit the evidence to DESNZ when available. A commitment should be clearly made against each relevant OWES and be translated into any DML or marine licence, alongside outline plans where applicable. Once the data is available, developers should review it to confirm if conformity with OWES is still achievable or if deviation is required.   

Dispute resolution during examination 

Any significant disagreement concerning a departure from the OWES should be resolved through the standard application and examination process. A summary of this process is: 

  1. An interested party (for example, a statutory consultee) may raise concerns through its relevant Representation if it does not agree with the applicant’s justification for deviating from the OWES (for example if the evidence is not sufficient).  

  2. Both the applicant and interested parties have opportunities during the examination to submit further evidence and justification in support of their positions.  

  3. PINS may request additional information from either party through examination questions or at an Issue Specific Hearing. 

  4. If a significant disagreement remains unresolved at the close of examination, PINS will consider the evidence presented and make a recommendation to the Secretary of State, who would be responsible for the final determination. This should only occur if the issues associated with deviating from the OWES are causing significant impact to the environment or project design outcomes. Any disagreement in examination should be considered on individual merit.   

How the OWES align with current statutory consultee advisory practices 

The OWES will not change existing statutory consultee roles in the offshore wind planning and consenting process. Statutory consultees such as SNCBs will continue their existing advisory role in the consenting process, which includes reviewing environmental assessments and advising on potential impacts to protected sites and species, and advising on mitigation and monitoring measures.  

Statutory consultees will check whether the relevant OWES have been clearly referenced and applied within DCO applications including any deviations. Developers should continue to consult with statutory consultees early and throughout project development to ensure that the OWES and any deviations from them have been fully evidenced within their application. 

Statutory consultees are supportive of the OWES policy to secure mitigation and design choices earlier in the application process and to ensure consistency and standardisation across developers.

Standards and best practice measures for Leasing Round 5 projects

OWES are applicable to Leasing Round 5 developers and should be adhered to unless a deviation is justified in accordance with this guidance:

  • OWES 1: Export cable burial to reduce electromagnetic field (EMF) effects on sensitive species. 

  • OWES 2: Adoption of Vessel Traffic Management Plans (VTMPs) to avoid disturbance to seabirds and marine mammals in sensitive or higher-density areas. 

  • OWES 3: Avoidance of excess lighting to protect seabirds, while ensuring compliance with aviation and navigation regulatory requirements. 

  • OWES 4: Adherence to the published SNCB, the Planning Inspectorate (PINS) and regulator best practice advice, referencing alternative advice if deviated from. 

  • OWES 5: Use of Natural England’s Offshore Wind Seabird Assessment Tool (OWSAT) throughout project development to support the DCO application.  

  • OWES 6: Agreement of an Archaeological Written Scheme of Investigation (WSI) with the MMO (in consultation with Historic England) in English waters and NRW (in consultation with RCAHMW and Cadw) in Welsh waters, and a commitment to submitting all heritage information to the Marine Data Exchange (MDE). 

  • OWES 7: Following a benthic impact framework for cable routing, avoiding sensitive areas or reducing and mitigating impacts to benthic habitats where avoidance is not possible.

Best practice recommendations are to:

  • monitor mooring lines and cables

  • reduce seabird collisions

  • protect harbour porpoise from underwater noise

See more details on how to apply the standards and best practice measures for Leasing Round 5 projects.