Notice

Maidenhead Railway Bridge repairs 2021: river restriction notice

Published 19 March 2021

This notice was withdrawn on

River restriction no longer in force.

When

Wednesday 17 March to Friday 2 April 2021.

Where

Bray reach, Maidenhead Railway Bridge closest point to Guards Club Island.

Details

The navigation channel will be on the right hand side of Guards Club Island.

Boards will mark the upstream and downstream extent of the course and will be illuminated at night.

Mooring to buoys placed in the river to mark the course is not allowed.

Masters of all boats to maintain a safe speed and lookout in the vicinity of the Maidenhead Railway Bridge.

All boats must be navigated in accordance with any instructions given from Environment Agency control points or patrol launches.

Those in charge of boats should be aware that they are responsible for avoiding collision and should use all available means appropriate to the circumstances and conditions to decide if there is a risk of immediate danger and avoid it.

Bathing is not allowed in the river in this area.

N.B. All directions as to left bank and right banks are given looking upstream.

Byelaws

Nothing contained in these directions shall supersede those parts of the Thames Navigation Licensing and General Byelaws 1993 and the UK Merchant Shipping (Distress Signals and Prevention of Collisions) Regulations 1996 as may be relevant. Particular attention should be paid to byelaws 24-42 of the Thames Navigation Licensing and General Byelaws 1993, Steering Sailing and Speed.

And Notice is hereby given, that it is provided by Byelaw 52 of the Thames Navigation Licensing and General Byelaws 1993 that:

The master of any vessel shall except in an emergency not pass any boat-race regatta public procession or gathering for the launch of a vessel or any other event or function which may cause a crowd to assemble on or by the river nor station his vessel thereon in such a manner as would risk obstructing impeding or interfering with such boat-race regatta procession launching event or function or endangering the safety of persons assembling on the river or preventing or interfering with the maintenance of order thereon.

The maximum penalty for breach of the Byelaws is £1,000.

Read our Thames Navigation Licensing and General Byelaws 1993