Terms of reference for the M25 south-west quadrant study

Terms of reference that outline the scope, aims and objectives of the M25 south-west quadrant strategic study.

This publication was withdrawn on

This information was replaced by the M25 south-west quadrant strategic study: stage 3 report in March 2017.

Documents

M25 south-west quadrant strategic study: terms of reference

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email webmasterdft@dft.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The terms of reference sets out the:

  • scope, aim and objectives of the M25 south-west quadrant strategic study
  • geographical area for the study
  • study outputs and timings
  • governance of the study

Background to the M25 south-west quadrant strategic study

The M25 south-west quadrant strategic study is one of 6 strategic studies that will inform the development of the second phase of the Road investment strategy (RIS 2). The 6 studies address challenges and opportunities on our motorways and major roads which are too large and complex to fix in a single road period.

The study was announced as part of the first phase of the Road investment strategy (RIS 1) published in December 2014. The RIS 1 and RIS 2 set out a long-term approach to improve England’s motorways and major roads (the ‘strategic road network’).

Published 16 March 2017