Notice

Kingston Road Bridge overhead repair works 2023: river restriction notice

Published 20 March 2023

This notice was withdrawn on

River restriction no longer in force.

When

Tuesday 21 March to Friday 14 April 2023.

Where

Teddington reach, Kingston Road Bridge.

Details

Contractors will be carrying out repairs to the balustrades of Kingston Road Bridge on behalf of the Royal Borough of Kingston upon Thames until end of March 2023. Whilst scaffolding is removed from these works the navigation may be restricted beneath the bridge and one span closed to navigation to allow overhead works to be completed safely.

A closed span will be marked by a red disc by day and three red lights by night.

Masters of all boats to maintain a safe speed and lookout in the vicinity of Kingston Road Bridge.

All boats should be navigated in accordance with any instructions given from Environment Agency control points or patrol launches.

Those in charge of boats should be aware that they are responsible for avoiding collision and should use all available means appropriate to the circumstances and conditions to decide if there is a risk of immediate danger and avoid it.

Byelaws

Nothing contained in these directions shall supersede those parts of the Thames Navigation Licensing and General Byelaws 1993 and the UK Merchant Shipping (Distress Signals and Prevention of Collisions) Regulations 1996 as may be relevant. Particular attention should be paid to byelaws 24-42 of the Thames Navigation Licensing and General Byelaws 1993, Steering Sailing and Speed.

And Notice is hereby given, that it is provided by Byelaw 52 of the Thames Navigation Licensing and General Byelaws 1993 that:

The master of any vessel shall except in an emergency not pass any boat-race regatta public procession or gathering for the launch of a vessel or any other event or function which may cause a crowd to assemble on or by the river nor station his vessel thereon in such a manner as would risk obstructing impeding or interfering with such boat-race regatta procession launching event or function or endangering the safety of persons assembling on the river or preventing or interfering with the maintenance of order thereon.

The maximum penalty for breach of the Byelaws is £1,000.

Read our Thames Navigation Licensing and General Byelaws 1993