Notice

Kings Lock: lock gate beams replacement 2018: river closure notice

Published 21 November 2018

This notice was withdrawn on

This notice is no longer in force.

When

Friday 30 November 2018 from 9am to 5pm.

Where

Kings Lock.

Details

Removal and replacement of lock gate beams.

• Kings Lock will be closed to all boats due to the lock gate beams being replaced.

• No public mooring will be allowed in the lock laybys, up and downstream of Kings lock.

• The main navigation channel will remain open throughout the incident up and downstream of the lock.

• There is no passage through Kings Lock at the time stated above.

Our engineers will be on site and will be replacing the lock gate beams as soon as possible. We apologise for any inconvenience it may cause.

Byelaws

Nothing contained in these directions shall supersede those parts of the Thames Navigation Licensing and General Byelaws 1993 as may be relevant.

And Notice is hereby given, that it is provided by Byelaw 52 of the Thames Navigation Licensing and General Byelaws, 1993 that:

The master of any vessel shall except in an emergency not pass any boat-race regatta public procession or gathering for the launch of a vessel or any other event or function which may cause a crowd to assemble on or by the river nor station his vessel thereon in such a manner as would risk obstructing impeding or interfering with such boat-race regatta procession launching event or function or endangering the safety of persons assembling on the river or preventing or interfering with the maintenance of order thereon.

The maximum penalty for breach of the Byelaws is £1,000.