Guidance

All Reservoir Panel engineers: contact details

Appoint a panel engineer for your reservoir.

Documents

All Reservoir Panel: contact details

This file may not be suitable for users of assistive technology. Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email enquiries@environment-agency.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

As a reservoir owner or operator you are required to appoint a panel engineer for large raised reservoirs, including those classed as ‘high-risk’:

  • during the design and construction of any reservoir with an ‘escapable’ volume greater than 25,000 cubic metres (construction engineer)
  • where an abandoned reservoir is to be restored and will be brought back into use as a large raised reservoir again (construction engineer)
  • to supervise the reservoir once built (at all times) and produce a statement once a year (supervising engineer)
  • to carry out an inspection every 10 years, identify safety work and set you deadlines for the work to be completed (inspecting engineer)
  • to supervise and certify any recommended measures to be taken in the interests of safety (inspecting engineer)

Reservoirs that have been determined as ‘not high-risk’ only need to appoint a construction engineer during the design and construction, restoration or alteration of the reservoir. Supervising and inspecting engineers are not required.

Published 8 March 2013
Last updated 18 May 2018 + show all updates
  1. Updated contact details for All Reservoir Panel engineers.
  2. The contact details for All Reservoir Panel engineers has been updated.
  3. All Reservoir Panel engineers list updated.
  4. The contact details for All Reservoir Panel engineers has been updated.
  5. The contact details for All Reservoir Panel engineers has been updated.
  6. The contact details for All Reservoir Panel engineers has been updated.
  7. The contact details for all Reservoir Panel engineers has been updated.
  8. The contact details for all reservoir panel engineers has been updated.
  9. The contact details for all reservoir panel engineers has been updated.
  10. Updated list September 2016
  11. Updated list for June 2016
  12. Updated panel list May 2016.
  13. The contact details for the panel of engineers has been updated.
  14. We have updated the list of panel engineers. We have removed expired engineers.
  15. Engineer contact details updated: new company name and email address.
  16. Updated list, march 2015.
  17. First published.