Full details of auction parameters and interconnector de-rating factors
Published 21 July 2026
Table 1: Auction parameters
| T-1 Auction for delivery in 2027/28 | T-4 Auction for delivery in 2030/31 | |
|---|---|---|
| Auction target capacity | 5.0 GW | 40.9 GW |
| Demand curve: minimum capacity at price cap | 4.0 GW | 39.4 GW |
| Demand curve: maximum capacity at £0 | 6.0 GW | 42.4 GW |
| Reliability Standard (Loss of Load Expectation, LOLE) | 3 hours LOLE | 3 hours LOLE |
| Net Cost of New Entry (CONE) | £49/kW/yr | £49/kW/yr |
| Price Cap | £75/kW/yr | £75/kW/yr |
| Price Taker Threshold | £25/kW/yr | £25/kW/yr |
| 15-year agreement threshold | N/A[footnote 1] | £360/kW[footnote 2] |
| 9-year agreement threshold (for eligible Declared Low Carbon Capacity Market Units (CMUs) only) | N/A[footnote 1] | £215/kW[footnote 2] |
| 3-year agreement threshold (for non-Three Year Zero Capex Threshold CMUs) | N/A[footnote 1] | £65/kW[footnote 2] |
| 3-year agreement zero threshold (for eligible Three Year Zero Capex Threshold CMUs only) | N/A[footnote 1] | £0/kW |
| Indexation | N/A | 2025/26 |
Table 2: Interconnector de-rating factors
| T-4 auction for the 2030/31 Delivery Year | T-4 auction for the 2030/31 Delivery Year | T-4 auction for the 2030/31 Delivery Year | T-4 auction for the 2030/31 Delivery Year | ||
|---|---|---|---|---|---|
| Interconnector (interconnected country) | Connection capacity[footnote 3](GW) | NESO’s country de-rating factor range[footnote 4](%) | PTE’s country de-rating factor[footnote 5](%) | Technical adjustment[footnote 6](%) | Interconnector de-rating factor (%)[footnote 7] |
| IFA (France) | 2 | 45 – 90 | 71 | 78 | 55 |
| IFA2 (France) | 1.1 | 45 – 90 | 71 | 81 | 57 |
| ElecLink (France) | 1 | 45 – 90 | 71 | 84 | 60 |
| BritNed (Netherlands) | 1.2 | 22 – 93 | 71 | 81 | 57 |
| Moyle (Northern Ireland) | 0.5 | 5 – 91 | 62 | 78 | 49 |
| EWIC (Republic of Ireland) | 0.5 | 5 – 91 | 62 | 97 | 60 |
| Greenlink (Republic of Ireland) | 0.5 | 5 – 91 | 62 | 99 | 61 |
| NemoLink (Belgium) | 1 | 25 – 90 | 71 | 100 | 71 |
| NSL (Norway) | 1.4 | 71 – 97 | 75 | 91 | 68 |
| VikingLink (Denmark) | 1.5 | 17 – 92 | 71 | 94 | 67 |
| Neuconnect (Germany) | 1.4 | 19 – 93 | 71 | 93 | 66 |
-
Multi-year agreements are not awarded in the T-1 auction. ↩ ↩2 ↩3 ↩4
-
The 3-year (for non-Three Year Zero Capex Threshold CMUs) and 15-year agreement thresholds are adjusted from the previous T-4 value (for the 2029/30 delivery year) for inflation, indexed to the 2025/26 inflation level, and rounded to the nearest £5. The 9-year agreement threshold (for eligible Declared Low Carbon CMUs only) is set as the midpoint between these thresholds, rounded to the nearest £5. ↩ ↩2 ↩3
-
Connection capacity taken from Capacity Market Register data for the 2029-30 T-4 Capacity Market Auction (accessed June 2026). ↩
-
Taken from NESO’s 2026 Electricity Capacity Report. ↩
-
Taken from the Panel of Technical Expert’s Report on the 2026 Electricity Capacity Report. ↩
-
Calculated as per the methodology described in the Updated technical adjustment methodology for de-rating interconnectors in the Capacity Market. Number displayed is rounded to the nearest integer. ↩
-
Calculated by multiplying the PTE’s interconnected country de-rating factor determination with each interconnector’s technical adjustment. ↩