Collection

Cross-topic technical appendices for High Speed Rail (Crewe – Manchester) Environmental Statement

These documents contain supporting information covering multiple technical considerations along the line of route.

These documents contain supporting information covering multiple technical considerations along the line of route.

Environmental Impact Assessment Scope and Methodology Report

Sets out the approach to the environmental impact assessment process for HS2 Phase 2b Crewe – Manchester.

Draft Code of Construction Practice

Contains the draft Code of Construction Practice which sets out a series of measures to be applied during construction of HS2 Phase 2b Crewe – Manchester.

Alternatives report

This report presents the reasonable alternatives considered in the development of HS2 Phase 2b Crewe – Manchester.

Planning data

These reports present the planning data and committed developments relevant to the environmental impact assessment of HS2 Phase 2b Crewe – Manchester.

Wider effects report

Describes the likely significant environmental effects which may result from alignment changes or other details of HS2 Phase 2b Crewe – Manchester within its limits of deviation.

Working Draft Environmental Statement consultation summary report

This appendix presents a response to the main themes raised in the consultation responses received for the HS2 Phase 2b Western Leg (Crewe – Manchester) of the working draft Environmental Statement report for the full Phase 2b scheme.

Borrow pit report

This report describes the need for and the selection of and the plans for restoration of the borrow pits proposed to be excavated as part of HS2 Phase 2b Crewe – Manchester.

Published 24 January 2022