Notice

Surfleet Seas End - River Glen

Published 3 August 2016

This notice was withdrawn on

This notice is no longer in force.

When

5 September to 28 October 2016

What’s happening

Works will be taking place to repair the timber infill panels of the upstream training walls on either side of the river.

At times the works within the navigation channel will include mobilising and using a floating pontoon to install the piles and for a dive team to work from.

Please take care when navigating in this area, read any safety notices in place and adhere to instructions from the engineers on site if required.

Further information can be obtained by contacting our River Inspector Ian Cook on 07920 087741.