1. Consultation now closed

The rationalising the main river network consultation has now closed. The decision on this change will be published alongside this proposal, you will then be able to appeal this decision if necessary.

The below is a record of the original notice of the proposed change.

2. Details of proposed change

The Environment Agency proposes to reduce the length of the Snow Sewer Warping Drain watercourse in the Isle of Axholme Catchment that is currently designated as ‘main river’. This change represents a ‘determination’ under section 193C(1) of the Water Resources Act 1991. A determination is a formal decision to change the main river map.

The proposed determination is that the Snow Sewer Warping Drain, Isle of Axholme Catchment (MRV_100026), between national grid references (NGRs) SK 73015 98577 and SK 81456 99472, which is currently designated as main river, should be re-designated as ordinary watercourse.

The change would mean that the local Internal Drainage Board, Isle of Axholme and North Nottinghamshire Water Level Management Board, would have powers to carry out work to manage flood risk for this section of the watercourse. The change would mean that the Environment Agency would no longer have any permissive powers to carry out works on this section of the watercourse. The change would also affect how the watercourse is regulated. If you wanted to carry out works in or next to the watercourse, you might have to get consent from Isle of Axholme and North Nottinghamshire Water Level Management Board.

This change is part of rationalising the main river network.

3. How to view the proposed changes

You can see the proposed change on the main river map.

The proposed change is shown as a ‘deletion’ a red line on the map.

You can view the proposals via our online consultation.

Or you can view the main river consultation map at:

Environment Agency office
South Street
Owston Ferry
North Lincolnshire
DN9 1RR

4. Your chance to comment

You can comment on the proposals via our online consultation.

You need to submit your response to the online consultation or send your comments to the Environment Agency by midday on 23 July 2018.