Notice

Reading festival bridge 2017: river closure notice

Published 16 August 2017

This notice was withdrawn on

River restriction no longer in force.

When

Thursday 17 August and Monday 4 September 2017 from 7pm to midnight.

Where

Scours Lane, Reading (one mile upstream of Caversham Bridge)

Details

Installation and removal of temporary bridge for Reading Festival.

Subject to the appropriate planning permissions being obtained, Festival Republic will be installing a temporary footbridge across the River Thames at Scours Lane, Reading (one mile upstream of Caversham Bridge) for the duration of Reading Festival.

Expect long delays on both 17 August and 4 September from 7pm to midnight (river conditions permitting) whilst they install and dismantle the bridge.

The temporary closures will be managed by our staff on patrol launches throughout the night. Please follow their instructions. Communications will also be available on marine band VHF Channel 74.

From 17 August to 4 September 2017, all masters of boats should take care whilst navigating in the vicinity of this new structure.

Once in place the bridge’s headway will be 5.35 metres / 17 feet 6 inches at standard headwater at Caversham Lock.

New temporary footbridge 5.35 metres 17’6” Caversham Bridge 4.56 metres 15’0” Reading Bridge 5.38 metres 17’8”

Byelaws

Nothing contained in these directions shall supersede those parts of the Thames Navigation Licensing and General Byelaws 1993 as may be relevant.

And Notice is hereby given, that it is provided by Byelaw 52 of the Thames Navigation Licensing and General Byelaws, 1993 that:

The master of any vessel shall except in an emergency not pass any boat-race regatta public procession or gathering for the launch of a vessel or any other event or function which may cause a crowd to assemble on or by the river nor station his vessel thereon in such a manner as would risk obstructing impeding or interfering with such boat-race regatta procession launching event or function or endangering the safety of persons assembling on the river or preventing or interfering with the maintenance of order thereon.

The maximum penalty for breach of the Byelaws is £1,000.