Part I claim: I54 Development on M54 scheme

Published 19 May 2016

This notice was withdrawn on

Claim date has passed

Highways England Company Limited Land Compensation Act 1973 (as amended)

I54 DEVELOPMENT ON M54

  1. 1. Highways England Company Limited hereby gives notice that the altered highway described in the Schedule below, was first open to public traffic on 14 December 2014. That date is known as the “relevant date”.

  2. 2. Under Part I of the Land Compensation Act 1973 (as amended) (from now on referred to as the Act), compensation can be claimed by anyone having a qualifying interest in land (see paragraphs 8 and 9 to this notice) if the value of that interest has been depreciated by more than £50 by physical factors caused by the use of the altered highway. The physical factors are noise, vibration, smell, fumes, smoke and artificial lighting and the discharge on to the land of any solid or liquid substance.

  3. 3. The first day on which compensation can be claimed is the day after twelve months have expired from the relevant date and is known as the “first claim day”. The first claim day for this altered highway is 15 December 2015. Except for the circumstance described in paragraph 4 to this notice, a claim cannot be made before the first claim day.

  4. 4. A claim can be made during the period between the relevant date and the first claim day only where the claimant has made a contract to sell his/her interest in the property or, in the case of properties that are not dwellings, to grant a tenancy. The claim must be made between the making of the contract and before the sale is completed or the tenancy granted. Highways England cannot accept a claim after the sale or grant of a tenancy has been completed. No compensation in respect of such a claim will be paid before the first claim day.

  5. 5. Anyone who, after the first claim day, intends to sell his/her interest in the property or, in the case of properties that are not dwellings, to grant a tenancy, must make a claim before a contract to sell or grant a lease is made. Highways England cannot accept a claim after a contract to sell or grant a lease has been made.

  6. 6. By virtue of section 19(2A) of the Act and under the Limitations Act 1980, a claim will become time-barred if within six years from and including the first claim day the claimant has not:

    1. a. Agreed in writing an offer of compensation (including any reasonable valuation and legal expenses) made by Highways England in writing; or

    2. b. If agreement is not so reached, made a reference to the Upper Tribunal (Lands Chamber) to have it determine the compensation. Where a claim has become time-barred under the Limitations Act 1980, Highways England can no longer be required to pay compensation.

  7. 7. No compensation can be claimed under Part I of the Act where part of the property was acquired for the alterations to the highway. Instead, compensation for land acquired is paid under different rules.

  8. 8. To claim compensation under Part I of the Act, a qualifying interest in the land must have been acquired before the alterations to the highway were completed and first open to public traffic. The qualifying interest must also be held by the claimant at the date of making a claim. The claimant must be able to produce evidence of his/her interest in the property when required to do so by Highways England. Compensation will not be paid where a claimant’s qualifying interest in the property cannot be verified.

  9. 9. Interests in land qualifying for compensation are specified in section 2 of the Act. They are:

    1. a. For dwellings, the interest must be that of an owner by virtue of owning the freehold or a tenancy with at least three years left to run at the time of making the claim. Where the interest carries the right to occupy the property, the claimant must do so as his residence.

    2. b. For agricultural units, the interest must be that of an owner-occupier, that is, a person who occupies the whole of the unit and owns the freehold or a tenancy with at least three years left to run at the time of making the claim in the whole or any part of the unit.

    3. c. For other property that is not a dwelling or an agricultural unit, the interest must be that of an owner-occupier, that is, a person who occupies the whole or substantial part of the property by virtue of owning the freehold or a tenancy with at least three years left to run at the time of making the claim. The property must have an annual value that does not exceed £34,800 (this figure may be updated by Order from time to time).

  10. 10. Special provisions under the Act apply to claims where the land is subject to a mortgage, where there are persons entitled under trusts or settlements or by inheritance and where there are tenants entitled to enfranchisement or extension under the Leasehold Reform Act 1967.

  11. 11. Compensation is assessed by reference to property prices that are current on the first claim day. Account will be taken of the use of the altered highway, as it exists on the first claim day. Account will also be taken of any intensification that may then reasonably be expected of the use of the altered highway in the state it is on the first claim day.

  12. 12. Anyone having a qualifying interest who considers they have a claim under the Act can obtain further information and a claim form from National Part I Claims Team, Highways England, Woodlands, Manton Lane Industrial Estate, Manton Lane, Bedford MK41 7LW or by telephoning 0845 300 2330.

  13. 13. This notice contains a summary of the law. It is not intended to be a complete and full statement of it. Anyone intending to make a claim should consider obtaining independent professional advice.

The Schedule

The M54 Junction 2 was extended to give direct access from the motorway and A449 into the i54 development site. The existing canal bridge was widened and a replacement accommodation overbridge was provided at Middle Lane.

The west facing slip roads were realigned and 2 new roundabouts and a new overbridge were provided allowing access into the development site and on to the A449.

The new links to the A449 roundabout are non-motorway ‘A’ road designated A4510 with a speed limit of 40mph. The realigned motorway slip roads, roundabouts and A4510 link roads are lit by flat glass lanterns on 10m high columns.

Existing lighting was removed from the centre reserve. A 3 metre high noise fence was constructed on the existing earth mound between the A4510 eastbound link road and the Homelands mobile home park and a 2m high visual screen fence was erected along the new eastbound A4510 link to reduce distant views of traffic from the Homelands Park.

An extensive planting scheme has been carried out to, over time, soften the impact of the scheme.

Nicholas Freeman – Principal Adviser, Property & Compensation

National Part I Claims Team
Highways England
Woodlands
Manton Lane Industrial Estate
Manton Lane
Bedford MK41 7LW.