HS2 Phase 2a: topic documents for the House of Commons Select Committee
HS2 exhibits for a series of standard topics that the promoter may refer to when hearing petitions in the House of Commons Select Committee.
Updates to this page
- From:
- High Speed Two (HS2) Limited
- Published:
- 18 April 2018
- Last updated:
-
17 April 2019
Show all updates
-
Sections R and P (part 3) added
-
Section P split into 2 parts and updated to incorporate amendments, including AP1 arrangements.
-
Section Q added
-
Section P added
-
Sections K to O added
-
First published.
-
Documents
Section A: Promoters Opening Statement
Ref: Presentation given to the House of Commons Select Committee on 19th March 2018 as part of the Promoter’s opening statement.
PDF, 3.62 MB, 39 pages
Section B: Overview of Phase 2a route
Ref: Presentation given to the House of Commons Select Committee on 19th March 2018 giving an overview of the High Speed Rail Phase 2a route.
PDF, 7.42 MB, 29 pages
Section C: Control of Environmental Impacts
Ref: Presentation given to the House of Commons Select Committee on 26th March 2018 on environmental controls.
PDF, 2.26 MB, 33 pages
Section D: Sound, Noise and Vibration
Ref: An explanation on sound, noise and vibration presented to the House of Commons Select Committee on 26th and 27th March 2018.
PDF, 2.76 MB, 64 pages
Section E: Traffic and Transport
Ref: Presentation given to the House of Commons Select Committee on 27th March 2018 on the HS2 traffic assessments and methodology.
PDF, 1.25 MB, 19 pages
Section F: Tunnels
Ref: Presentation on operational aspects of tunnels, construction and cost implications given to the House of Commons Select Committee on 27th March 2018.
PDF, 4.31 MB, 24 pages
Section G: Introduction to Land Compensation
Ref: Presentation given to the House of Commons Select Committee on 27th March 2018 introducing land compensation.
PDF, 1.31 MB, 46 pages
Section H: Whitmore Heath to Madeley: Proposed Scheme & Single Tunnel alternative
Ref: Information on the proposed scheme for the Whitmore Heath Tunnel and the single tunnel alternative.
PDF, 35.8 MB, 46 pages
Section I: River Trent and Kings Bromley Viaduct
Ref: Information on the River Trent and Kings Bromley Viaduct lowering alternative.
PDF, 4.59 MB, 16 pages
Section J: Stone Infrastructure Maintenance Base - Rail
Ref: Information on the Stone Railhead and Infrastructure Maintenance Base - Rail
PDF, 46.7 MB, 37 pages
Section K: Ecology and Biodiversity
Ref: Ecology and biodiversity arrangements, including Ancient Woodland.
PDF, 1.42 MB, 15 pages
Section L: Landscape and Visual
Ref: Approach to landscape and visual assessment, landscape and visual mitigation and maintenance and the HS2 landscape design.
PDF, 10.2 MB, 21 pages
Section M: Water Resource and Drainage
Ref: Water resources and drainage assessments, balancing ponds, surface water, land drainage, groundwater, prevention of water pollution and hydrological monitoring.
PDF, 995 KB, 15 pages
Section N: Scheme Components
Ref: Bridges and viaducts, tunnels, cuttings and embankments, track, power supply, train control and telecommunications, IMB-R, diversions (for road, public right of way, utility and watercourses), noise barriers; and green bridges.
PDF, 1.36 MB, 13 pages
Section O: Borrow Pits
Ref: Outlines the need for borrow pits, planning and locations, environmental controls, restoration process and principles and further information.
PDF, 7.47 MB, 40 pages
Section P: Traffic Arrangements (Part 1)
Ref: Strategic construction traffic routes (for peak and busy months) for Community Areas 1-5, average daily weekday traffic flows in peak month (known as alphabet maps) and histograms showing construction traffic flows.
PDF, 24.1 MB, 42 pages
Section P: Traffic Arrangements (Part 2)
Ref: Strategic construction traffic routes (for peak and busy months) for Community Areas 1-5, average daily weekday traffic flows in peak month (known as alphabet maps) and histograms showing construction traffic flows.
PDF, 20.4 MB, 36 pages
Section P: Traffic Arrangements (Part 3)
Ref: Plans showing construction traffic routes for Community Areas 1-5, average daily weekday traffic flows and histograms showing the construction traffic flows. Updated for Additional Provision 2 (part 3).
PDF, 13.9 MB, 46 pages
Section Q: Agriculture and Farm Impacts
Ref: The approach to reducing impacts on agricultural holdings and working with farmers to resolve concerns. Includes assurances given to National Farmers’ Union for the benefit of farmers, landowners and tenants.
PDF, 542 KB, 46 pages
Section R: Utilities
Ref: An overview of the proposed utility works and diversions for Additional Provision 2.
PDF, 1.14 MB, 11 pages
Details
These presentations give a general overview on the main topics likely to be raised.