Decision

Deep Drilling Screening Directions - 2023

Screening Directions

Documents

SCOTT, Scott JD Platform, DRILLING PRODUCER WELL ST35/ST76 - CNOOC PETROLEUM EUROPE LIMITED - DR/2238/3 - Decision Date 27/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GODDARD EXPLORATION WELL - 48/12b - PETROFAC FACILITIES MANAGEMENT LIMITED - DR/2376/0 - Decision Date 27/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCOTT, Scott JD Platform, DRILLING PRODUCER WELL 15/22a- 15/22-ST31 planned well - CNOOC Petroleum Europe Limited - DR/2432/0 - Decision Date 20/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a-A35 AHPB planned well - Equinor UK Limited - DR/2418/1 - Decision Date 20/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BUZZARD, COSLInnovator DRILLING PRODUCER WELL 20/01-N3 at NTM - CNOOC Petroleum Europe Limited - DR/2347/1 - Decision Date 20/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR, Clair Phase 1 Platform, DRILLING PRODUCER WELL 206/08-A22/A27 - BP Exploration Operating Company Limited - DR/2422/1 - Decision Date 20/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a- S4U3P4-P5 planned well - BP Exploration Operating Company Limited - DR/2433/0 - Decision Date 19/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN EAST C-TRIASSIC WELL, 211/13a-17 - Shell U.K. Limited - DR/2375/1 - Decision Date 18/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, COSLPioneer DRILLING PRODUCER WELL 13/22a-B18Y - ITHACA ENERGY (UK) LIMITED - DR/2438/0 - Decision Date 15/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, Glen Lyon FPSO, DRILLING OF PRODUCER WELL 204/20a - BP Exploration Operating Company Limited - DR/2311/3 - Decision date 15/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a-A9 (ANPB Geological Sidetrack of AMPJ) - Equinor UK Limited - DR/2426/0 - Issue Date 08/12/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR, Clair Phase 1 Platform, DRILLING PRODUCER WELL A26 206/08a-AS1U5P2 planned well - BP Exploration Operating Company Limited - DR/2358/3 - Decision Date 30/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALBA, DRILLING PRODUCER WELL 16/26-A72Y sidetrack to B06 - Ithaca Oil and Gas Limited - DR/2387/1 - Decision Date 29/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

K2, Stena Spey DRILLING EXPLORATION WELL 22/14c- K2 planned well - Ithaca Energy UK Limited - DR/2373/5 - Decision Date 29/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALBA, DRILLING PRODUCER WELL 16/26-A72Y sidetrack to B06 - Ithaca Oil and Gas Limited - DR/2387/1 - Decision Date 29/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

K2, Stena Spey DRILLING EXPLORATION WELL 22/14c- K2 planned well - Ithaca Energy (UK) Limited - DR/2373/5 - Decision Date 29/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU3I1 planned well - BP Exploration Operating Company Limited - DR/2336/3 - Decision Date 27/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

TALBOT 30/13e-T3 DEVELOPMENT WELL - Chrysaor Petroleum Company U.K. Limited - DR/2290/2 - Decision Date 27/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

TALBOT 30/13e-T2 DEVELOPMENT WELL - Chrysaor Petroleum Company U.K. Limited - DR/2303/1 - Decision Date 27/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

TALBOT 30/13e-T1 DEVELOPMENT WELL - Chrysaor Petroleum Company U.K. Limited - DR/2304/1 - 27/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Devil’s Hole Horst, Valaris Norway DRILLING APPRAISAL WELL 27/05- 27/5-A planned well - Three60 Energy Wells UK Limited - DR/2397/1 - Decision Date 24/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

WELL 21/03d-9 LEVERETT PLANNED WELL - Petrofac Facilities Management Limited - DR/2321/6 - Decision Date 16/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

WELL 21/03d-9 LEVERETT PLANNED WELL - Petrofac Facilities Management Limited - DR/2321/5 - Decision Date 15/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

FRAM G6 PRODUCER WELL 29/03c- 10 - Shell U.K. Limited - DR/2420/1 - Decision Date 15/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CALLANISH F6 Well, Paul B. Loyd, Jnr, DRILLING PRODUCER WELL 15/29b-FFQ - Chrysaor Production (U.K.) Limited - DR/2360/2 - Decision Date 13/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GOLDEN EAGLE, Shelf Drilling Fortress DRILLING PRODUCER HPF wellWELL 20/01-G2 - CNOOC Petroleum Europe Limited - DR/2400/2 - Decision Date 13/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

WELL 21/03d-9 LEVERETT PLANNED WELL - Petrofac Facilities Management Limited - DR/2321/4 - Decision Date 10/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Ravenspurn South C Platform, DRILLING PRODUCER WELL 42/30a-C42/30-C6 - Perenco UK Limited - DR/2394/2 - Decision date 08/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU3I1 planned well - BP Exploration Operating Company Limited - DR/2336/2 - Decision date 07/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALLIGIN, Siem Stingray, CAN-ductor Installation for INJECTOR WELL 204/20a- IX9302 planned well - BP Exploration Operating Company Limited - DR/2413/1 - Decision date 07/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION, Siem Stingray, CAN-ductor installation at 204/20a- IX215 planned well - BP Exploration Operating Company Limited - DR/2410/1 - Decision date 07/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION, Siem Stingray, Can-Ductor Installation 204/20a- WP02RD planned well - BP Exploration Operating Company Limited - DR/2414/1 - Decision date 07/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

LOYAL FIELD [Part of SCHIEHALLION], Glen Lyon FPSO, CAN-DUCTOR INSTALLATION PRIOR TO DRILLING PLANNED WELL 204/20a- PX104. - BP Exploration Operating Company Limited - DR/2310/3 - Decision date 03/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, Glen Lyon FPSO, DRILLING OF PRODUCER WELL 204/20a - BP Exploration Operating Company Limited - DR/2311/2 - Decision date 01/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

20/01a-G20/01-HPG planned well - CNOOC Petroleum Europe Limited - DR/2425/0 - Decision date 01/11/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

K2, Stena Spey DRILLING EXPLORATION WELL 22/14c- K2 planned well - Ithaca Energy (UK) Limited - DR/2373/4 - Decision Date 18/10/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALWYN EAST, Alwyn North NAA Platform, DRILLING EXPLORATION WELL 3/09a-N59 - TotalEnergies E&P UK Limited - DR/2429/0 - Decision 13/10/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR, Clair Phase 1 Platform, DRILLING PRODUCER WELL 206/08-A22 - BP Exploration Operating Company Limited - DR/2422/0 - Decision Date 13/10/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

FRAM G6 PRODUCER WELL 29/03c- 10 - Shell U.K. Limited - DR/2420/0 - Decision Date 13/10/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION, Siem Stingray, Can-Ductor Installation 204/20a- WP02RD planned well - BP Exploration Operating Company Limited - DR/2414/0 - Decision Date 11/10/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION, Siem Stingray, CAN-ductor installation at 204/20a- IX215 planned well - BP Exploration Operating Company Limited - DR/2410/0 - Decision Date 11/10/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALLIGIN, Siem Stingray, CAN-ductor Installation for INJECTOR WELL 204/20a- IX9302 planned well - BP Exploration Operating Company Limited - DR/2413/0 - Decision Date 11/10/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GOLDEN EAGLE, Shelf Drilling Fortress DRILLING PRODUCER HPF wellWELL 20/01-G2 - CNOOC Petroleum Europe Limited - DR/2400/1 - Decision Date 04/10/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MURLACH [pt of MARNOCK-SKUA], Noble Innovator DRILLING PRODUCER WELL 22/24h- 22/24h-MUR CA planned well - BP Exploration Operating Company Limited - DR/2412/0 - Decision Date 03/10/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Earn, Valaris 121 DRILLING EXPLORATION WELL 42/27- Earn-1 planned well - Dana Petroleum (E&P) Limited - DR/2372/1 - Decision Date 29/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER FIELD, WATER INJECTION WELL: 9/11a-A30 AMID - Equinor UK Limited - DR/2271/4 - Decision Date 29/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MURLACH [pt of MARNOCK-SKUA], Noble Innovator DRILLING PRODUCER WELL 22/24h- 22/24h-MUR SD planned well - BP Exploration Operating Company Limited - DR/2411/0 - Decision Date 26/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

UTGARD, Transocean Enabler DRILLING PRODUCER WELL 16/18a-G1 - Equinor Energy AS - DR/2395/0 - Decision Date 25/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

K2, Stena Spey DRILLING EXPLORATION WELL 22/14c- K2 planned well - Ithaca Energy (UK) Limited - DR/2373/3 - Decision Date 22/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, INSTALLATION OF CAN-DUCTOR FOR DRILLING PRODUCER WELL 204/25a- PX25 - BP Exploration Operating Company Limited - DR/2309/3 - Decision Date 22/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, INSTALLATION OF CAN-DUCTOR AND DRILLING PRODUCER WELL 204/25a- PX423 planned well - BP Exploration Operating Company Limited - DR/2308/4 - Decision Date 22/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Devil's Hole Horst, Valaris Norway DRILLING APPRAISAL WELL 27/05- 27/5-A planned well - Three60 Energy Wells UK Limited - DR/2397/0 - Decision date 22/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JACKDAW, WELL 30/02a-AJD02 planned well - Shell U.K. Limited - DR/2382/0 - Decision date 19/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

K2, Stena Spey DRILLING EXPLORATION WELL 22/14c- K2 planned well - Ithaca Energy (UK) Limited - DR/2373/2 - Decision date 19/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JACKDAW, PRODUCER WELL 30/02a-AJD03 - Shell U.K. Limited - DR/2386/0 - Decision Date 18/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER - WELL 9/11a-AIPE - Equinor UK Limited - DR/2357/1 - Decision date 18/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a- AHPB planned well - Equinor UK Limited - DR/2418/0 - Decision Date 15/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a- AMIF planned well - Equinor UK Limited - DR/2416/0 - Decision Date 14/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JACKDAW, PRODUCER WELL 30/02a-AJD06 - Shell U.K. Limited - DR/2384/0 - Decision Date 12/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Ravenspurn South C Platform, DRILLING PRODUCER WELL 42/30a-C42/30-C6 - Perenco UK Limited - DR/2394/1 - Decision Date 08/09/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

LOYAL FIELD [Part of SCHIEHALLION], Glen Lyon FPSO, CAN-DUCTOR INSTALLATION PRIOR TO DRILLING PLANNED WELL 204/20a- PX104. - BP Exploration Operating Company Limited - DR/2310/2 - Decision Date 29/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GOLDEN EAGLE, Shelf Drilling Fortress DRILLING PRODUCER HPF wellWELL 20/01-G2 - CNOOC Petroleum Europe Limited - DR/2400/0 - Decision Date 29/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Mariner Field. Drilling well 9/11a -ANPA - Equinor UK Limited - DR/2398/0 - Decision Date 29/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CALLANISH F6 Well, Paul B. Loyd, Jnr, DRILLING PRODUCER WELL 15/29b-FFQ - Chrysaor Production (U.K.) Limited - DR/2360/1 - Decision Date 25/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JACKDAW - 30/02a-AJD05 PLANNED WELL - Shell U.K. Limited - DR/2385/0 - Decision Date 25/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN EAST, 211/13a- 18 (PC-04) - Shell U.K. Limited - DR/2305/2 - Decision Date 17/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

K2, Stena Spey DRILLING EXPLORATION WELL 22/14c- K2 planned well - Ithaca Energy (UK) Limited - DR/2373/1 - Decision Date 16/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALBA, DIRLLING PRODUCER WELL 16/26-A72Y sidetrack to B06 - Ithaca Oil And Gas Limited - DR/2387/0 - Decision Date 14/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MAGNUS WELL 211/12a-M43(B07) - EnQuest Heather Limited - DR/2393/0 - Decision Date 11/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

WELL 21/03d-9 LEVERETT PLANNED WELL - Petrofac Facilities Management Limited - DR/2321/3 - Decision Date 07/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Ravenspurn South C Platform, DRILLING PRODUCER WELL 42/30a-C42/30-C6 - Perenco UK Limited - DR/2394/0 - Decision Date 04/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN EAST, 211/13a- 18 (PC-04) - Shell U.K. Limited - DR/2305/1 - Decision Date 02/08/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a- AHID planned well - Equinor UK Limited - DR/2306/5 - Decision Date 31/07/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

TALBOT 30/13e-TA DEVELOPMENT WELL - Chrysaor Petroleum Company UK Limited - DR/2290/1 - Decision date 21/07/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR, Clair Phase 1 Platform, DRILLING PRODUCER WELL A26 206/08a-AS1U5P2 planned well - BP Exploration Operating Company Limited - DR/2358/2 - Decicion Date 10/07/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN EAST C-TRIASSIC WELL, 211/13a-17 - Shell U.K. Limited - DR/2375/0 - Decision Date 10/07/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, INSTALLATION OF CAN-DUCTOR AND DRILLING PRODUCER WELL 204/25a-PX423 planned well - BP Exploration Operating Company Limited - DR/2308/3 - Decision Date 07/07/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BUZZARD , B34Y-D WELL - CNOOC Petroleum Europe Limited - DR/2368/0 - Decision Date 06/07/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BLYTHE - 48/23a-A48/23a-H2 - Producer Well - Petrofac Facilities Management Limited - DR/2349/1 - Decision Date 05/07/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, COSLPioneer DRILLING INJECTOR WELL 13/22a-DUB01I planned well - Ithaca Energy UK Limited - DR/2362/0 - Decision date 29/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, COSLPioneer DRILLING INJECTOR WELL 13/22a-DUB02I planned well - Ithaca Energy UK Limited - DR/2363/0 - Decision date 29/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, COSLPioneer DRILLING INJECTOR WELL 13/22a-DUB03I planned well- Ithaca Energy UK Limited - DR/2364/0 - Decision date 29/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRILLING FINLAGGAN - 21/05c - F3H PRODUCTION WELL - Petrofac Facilities Management Limited - DR/2294/5 - Decision Date 28/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS3U5P3 planned well - BP Exploration Operating Company Limited - DR/2351/1 - Decision Date 20/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Benriach Exploration Well - Transocean Barents - TotalEnergies E&P UK Limited - DR/2353/3 - Desicions Date - 15/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Earn, Valaris 121 DRILLING EXPLORATION WELL 42/27- Earn-1 planned well - Dana Petroleum (E&P) Limited - DR/2372/0 - Decision Date 15/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR, Clair Phase 1 Platform, DRILLING PRODUCER WELL A26 206/08a-AS1U5P2 planned well - BP Exploration Operating Company Limited - DR/2358/1 - Decision Date 13/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SEAGULL, Valaris Gorilla VI DRILLING PRODUCER WELL 22/29c-J22/29c-JB planned well - Neptune E&P UK Limited - DR/2243/0 - Decision Date 07/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CALLANISH F6 Well, Paul B. Loyd, Jnr, DRILLING PRODUCER WELL 15/29b-FFQ - Chrysaor Production (U.K.) Limited - DR/2360/0 - Decision Date 07/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MAGNUS, Magnus Platform, DRILLING PRODUCER WELL 211/12a-M39Z - EnQuest Heather Limited - DR/2338/1 - Date Issued 07/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

K2, Stena Spey DRILLING EXPLORATION WELL 22/14c-K2 planned well - Ithaca Energy (UK) Limited - DR/2373/0 - Decision Date 05/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a- AHID planned well - Equinor UK Limited - DR/2306/4 - Decision Date 05/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

LEVERETT PLANNED WELL - Petrofac Facilities Management Limited - DR/2321/2 - Decision Date 05/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BERYL, WELL 9/13a-B87Y - Apache Beryl I Limited - DR/2361/0 - Decision date 01/06/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Benriach Exploration Well - Transocean Barents - TotalEnergies E&P UK Limited - DR/2353/2 - Decision Date 24/05/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Mariner - Well 9/11a-AIPE - Equinor UK Limited - DR/2357/0 - Decision Date 23/05/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SEAGULL FIELD, VALARIS GORILLA VI DRILLING PRODUCER WELL 22/29c-J22/29c-JD PLANNED WELL - Neptune E&P UK Limited - DR/2242/0 - Decision Date 19/05/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAYMORE FIELD, WELL: 14/19-(C58) CAS - Repsol Sinopec Resources UK Limited - DR/2295/2 - Decision Date 11/05/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Benriach Exploration Well - Transocean Barents - TotalEnergies E&P UK Limited - DR/2353/1 - Decision Date 11/05/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, INSTALLATION OF CAN-DUCTOR AND DRILLING PRODUCER WELL 204/25a- PX423 planned well - BP Exploration operating company limited - DR/2308/2 - Decision Date 09/05/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Kelham Appraisal Well - Well 53/01b-A - Petrofac Facilities Management Limited - DR/2365/0 - Decision Date 05/05/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRILLING of SOUTHWARK DEVELOPMENT WELL 49/21c-A1 - Petrofac Facilities Management Limited - DR/2183/6 - Decision Date 27/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRILLING FINLAGGAN - 21/05c - F3H PRODUCTION WELL - Petrofac Facilities Management Limited - DR/2294/4 - Decision Date 25/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, INSTALLATION OF CAN-DUCTOR FOR DRILLING PRODUCER WELL 204/25a- PX25 - BP Exploration Operating Company Limited - DR/2309/2 - Decision Date 21/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRILLING FINLAGGAN - 21/05c - F3H PRODUCTION WELL - Petrofac Facilities Management Limited - DR/2294/3 - Decision Date 17/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a- AHPA planned well - Equinor UK Limited - DR/2312/3 - Decision Date 13/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a- AHPA planned well - Equinor UK Limited - DR/2312/2 - Decision Date 12/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR, Clair Phase 1 Platform, DRILLING PRODUCER WELL A26 206/08a-AS1U5P2 planned well - BP Exploration Operating Company Limited - DR/2358/0 - Decision Date 06/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN EAST, 211/13a- 18 (PC-04) - Shell U.K. Limited - DR/2305/0 - Decision Date 05/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Crosgan appraisal WELL 42/15a-H- Valaris 123 MODU - One-Dyas UK Limited - DR/2345/1 - Decision Date 04/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a- AHID planned well - Equinor UK Limited - DR/2306/3 - Decision Date 03/04/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a- ANPA planned well - Equinor UK Limited - DR/2354/0 - Decision Date 31/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

STORR, Ocean Patriot DRILLING PRODUCER WELL 9/19b- 9/19b-SPN planned well - Apache Beryl I Limited - DR/2302/1 - Decision date 31/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BERYL DEVELOPMENT WELL 9/13a-B45Z - Apache Beryl I Limited - DR/2335/3 - Decision Date 30/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU3I1 planned well - BP Exploration Operating Company Limited - DR/2336/1 - Decision Date 27/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALWYN EAST EXPLORATION HT WELL 3/09a-N43/N59 - TotalEnergies E&P UK Limited - DR/2229/2 - Decision date 27/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS3U5P3 planned well - BP Exploration Operating Company Limited - DR/2351/0 - Decision date 24/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SHEARWATER WELL 22/30b- SW-IWA PLANNED WELL - Shell U.K. Limited - DR/2318/1 - Decision Date 24/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BREAGH, Breagh Platform, Maersk Resilient DRILLING PRODUCER WELL 42/13- 5Y (42/13a-A2) - Ineos UK SNS Limited - DR/2348/0 - Decision Date 24/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRILLING FINLAGGAN - 21/05c - F3H PRODUCTION WELL - Petrofac Facilities Management Limited - DR/2294/2 - Decision Date 23/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

TALBOT 30/13e-TC DEVELOPMENT WELL - Chrysaor Petroluem Company U.K. Limited - DR/2304/0 - Decision Date 23/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

TALBOT 30/13e-TB DEVELOPMENT WELL - Chrysaor Petroleum Company U.K. Limited - DR/2303/0 - Decision Date 23/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

TALBOT 30/13e-TA DEVELOPMENT WELL - Chrysaor Petroleum Company U.K. Limited - DR/2290/0 - Decision Date 23/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCOTT, Scott JD Platform, DRILLING PRODUCER WELL ST35/ST76 - CNOOC Petroleum Europe Limited - DR/2238/2 - Decision Date 20/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

RAVENSPURN N[pt. of RAVENSPURN], Ravenspurn North ST3 Platform, Valaris 247 DRILLING PRODUCER WELL 42/30-D9 - Perenco UK Limited - DR/2356/0 - Decision Date 17/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

RAVENSPURN N[pt. of RAVENSPURN], Ravenspurn North ST3 Platform, Valaris 247 DRILLING PRODUCER WELL 42/30-D11 - Perenco UK Limited - DR/2355/0 - Decision Date 17/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Benriach Exploration Well - Transocean Barents - TotalEnergies E&P UK Limited - DR/2353/0 - Decision Date 10/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Crosgan appraisal WELL 42/15a-H- Valaris 123 MODU - ONE-DYAS UK Limited - DR/2345/0 - Decision Date 10/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAYMORE FIELD, WELL: 14/19-(C58) CAS - Repsol Sinopec Resources UK Limited - DR/2295/1 - Decision Date 02/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a- AHID planned well - Equinor UK Limited - DR/2306/2 - Decision Date 01/03/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, COSLPioneer DRILLING INJECTOR WELL 13/22a-EUC02I planned well - Ithaca Energy (UK) Limited - DR/2341/0 - Decision Date 27/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, COSLPioneer DRILLING INJECTOR WELL 13/22a-EUC01I planned well - Ithaca Energy (UK) Limited - DR/2340/0 - Decision Date 27/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, COSLPioneer DRILLING INJECTOR WELL 13/22a-EUB04I planned well - Ithaca Energy (UK) Limited - DR/2339/0 - Decision Date 27/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER FIELD, WATER INJECTION WELL: 9/11a-A30 AMID - Equinor UK Limited - DR/2271/3 - Decision Date 23/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a- AHPA planned well - Equinor UK Limited - DR/2312/1 - Decision Date 23/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a- AHID planned well - Equinor UK Limited - DR/2306/1 - Decision Date 22/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BLYTHE - 48/23a-A48/23a-H2 - Producer Well - Petrofac Facilities Management Limited - DR/2349/0 - Decision Date 22/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BUZZARD, COSLInnovator DRILLING PRODUCER WELL 20/01-N3 at NTM - CNOOC Petroleum Europe Limited - DR/2347/0 - Decision Date 20/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Ben Lawers 204/23 - 204/23-31, Ocean GreatWhite DRILLING EXPLORATION WELL 204/23a- 204/23-3 planned well - BP Exploration Operation Company - DR/2344/0 - Decision Date 10/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of Clair], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU3I1 planned well - BP Exploration Operating Company Limited - DR/2336/0 - Decision Date 09/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Pensacola (41/5A) Planned Well - Shell U.K. Limited - DR/2275/1 - Decision Date 06/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GANNET F, Ocean Endeavor DRILLING PRODUCER WELL 21/30d- GF04 planned well - Shell U.K. Limited - DR/2342/0 - Decision Date 01/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRILLING of SOUTHWARK DEVELOPMENT WELL 49/21c-A1 - Petrofac Facilities Management Limited - DR/2183/5 - Decision Date - 01/02/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BERYL DEVELOPMENT WELL 9/13a-B45Z - Apache Beryl I Limited - DR/2335/2 - Decision Date 27/01/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SHEARWATER WELL 22/30b- SW-IWA PLANNED WELL - Shell U.K. Limited - DR/2318/0 - Decision Date 25/01/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GOLDEN EAGLE, COSLInnovator DRILLING PRODUCER WELL 14/26a-NDPF planned well - CNOOC Petroleum Europe Limited - DR/2278/1 - Decision Date 13/01/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MAGNUS,Magnus Platform, DRILLING INJECTOR WELL 211/12a-M59Z - EnQuest Heather Limited - DR/2343/0 - Decision Date 13/01/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRILLING FINLAGGAN - 21/05c - F3H PRODUCTION WELL - Petrofac Facilities Management Limited - DR/2294/1 - Decision date 06/01/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MAGNUS, Magnus Platform, DRILLING PRODUCER WELL 211/12a-M39Z - EnQuest Heather Limited - DR/2338/0 - Decision Date 04/01/2023

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

Deep Drilling Screening Directions - 2023

Published 5 January 2023
Last updated 21 December 2023 + show all updates
  1. DR/2347/1 uploaded

  2. New Screening Direction Added

  3. New Screening Directions Added

  4. DR/2311/3 uploaded

  5. DR/2426/0 - Uploaded

  6. DR/2373 - DR/2387 - DR/2358 - Uploaded

  7. Deep Drilling Screening directions added

  8. New direction added

  9. Deep Drilling Screening Directions added

  10. DR/2397/1 uploaded

  11. New Screening Directions added

  12. New Screening Directions Added

  13. New Screening Direction Added

  14. DR/2394/2 uploaded

  15. DR/2336/2 uploaded

  16. DR/2413/1 permit uploaded

  17. DR/2414/1 and DR/2410/1 permits uploaded

  18. DR/2310/3 - Uploaded

  19. DR/2425/0 - uploaded

  20. Addition of Deep Drilling Screening Directions

  21. New Screening direction added

  22. Drilling screening direction uploaded

  23. Drilling Screening directions added

  24. Drilling Screening directions added

  25. New Direction added

  26. New Directions added

  27. New screening directions added

  28. new screening directions added

  29. Upload of new Drilling Screening Direction

  30. New Drilling Screening direction added

  31. Addition of Deep Drilling Screening Directions

  32. new direction added

  33. new direction added

  34. New Direction Added

  35. New Direction Added

  36. Deep Drilling Screening Directions Added

  37. Addition of Deep Drilling Screening Directions

  38. DR/2290/1 - uploaded

  39. new directions added

  40. New Directions Added

  41. New Direction Added

  42. DR/2362 - DR/2363 and DR/2364 - Uploaded

  43. DR/2294/5 - upload

  44. new direction added

  45. Addition of Deep Drilling Screening Directions

  46. Addition of Deep Drilling Screening Direction

  47. New Direction Added

  48. DR/2361/0 - Uploaded

  49. New Directions added

  50. New screening direction added

  51. New Directions added

  52. Directions added

  53. New direction added

  54. Direction added

  55. Addition of Deep Drilling Screening Direction

  56. Upload - DR/23580 - DR/2312/2 and DR/2312/3

  57. New direction added

  58. DR/2305/0 - Uploaded to website

  59. Crosgan appraisal WELL 42/15a-H- Valaris 123 MODU - One-Dyas UK Limited - DR/2345/1 - uploaded

  60. MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a- AHID planned well - DR/2306/3 - upload

  61. New direction added

  62. New Direction added

  63. Drilling directions added

  64. Addition of 2 Deep Drilling Screening Directions

  65. New directions added

  66. New directions added

  67. New directions added

  68. DR/2295/1 - upload

  69. Addition of Deep Drilling Screening Direction

  70. Addition of Deep Drilling Screening Directions

  71. Addition of Deep Drilling Screening Direction

  72. New Direction Added

  73. New direction added

  74. DR/2334/0 - uploaded

  75. DR/2336/0 - uploaded

  76. New Direction Added

  77. New Direction Added

  78. New direction added

  79. New direction added

  80. DR/2343/0 - Decision Date 13/01/2023 - uploaded

  81. First published.