Deep Drilling Screening Directions - 2022

Screening Directions

Documents

Isabella Appraisal Well 30-12d, Noble Sam Hartley - TOTALENERGIES E&P NORTH SEA UK LIMITED - DR/2272/1 - Decision Date 28/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRILLING FINLAGGAN - 21/05c - F3H PRODUCTION WELL - PETROFAC FACILITIES MANAGEMENT LIMITED - DR/2294/0 - Decision Date 28/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SEAGULL FIELD, VALARIS GORLLA VI DRILLING PRODUCER WELL 22/29c-J2 (JC), HIGH PRESSURE HIGH TEMPERATURE (HPHT) 8.5" WELL SECTION - Neptune E&P UK Limited - DR/2080/4 - Decision Date 28/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SOUTHWARK, Southwark, Noble Hans Deul DRILLING PRODUCER WELL49/21c-A49/21c-E2 planned well - Petrofac Facilities Management Limited - DR/2182/8 - Decision Date 23/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BERYL DEVELOPMENT WELL 9/13a-B45Z - Apache Beryl I Limited - DR/2335/0 - Decision Date 23/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a- AHPA planned well - Equinor UK Limited - DR/2312/0 - Decision date 21/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

North Eigg 3/24c -NE1, Planned Exploration Well - Serica Energy (UK) Limited - DR/2249/6 - Decision Date 21/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SHAW, Stena Don DRILLING PRODUCER WELL 22/22a- SHC planned well - Repsol Sinopec Resources UK Limited - DR/2329/0 - Decision Date 20/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a- AHID planned well - Equinor UK Limited - DR/2306/0 - Decision Date 20/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER FIELD, WATER INJECTION WELL: 9/11a-A30 AMID - EQUINOR UK LIMITED - DR/2271/2 - Decicion Date 15/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, INSTALLATION OF CAN-DUCTOR FOR DRILLING PRODUCER WELL 204/25a- PX423 planned well - BP Exploration Operating Company Limited - DR/2308/1 - Decision Date 12/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

LOYAL FIELD [Part of SCHIEHALLION], Glen Lyon FPSO, CAN-DUCTOR INSTALLATION PRIOR TO DRILLING PLANNED WELL 204/20a- PX104 - BP Exploration Operating Company Limited - DR/2310/1 - Decision Date 12/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, INSTALLATION OF CAN-DUCTOR FOR DRILLING PRODUCER WELL 204/25a- PX25 - BP Exploration Operating Company Limited - DR/2309/1 - Decision Date 12/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, Glen Lyon FPSO, INSTALLATION OF CAN-DUCTOR FOR DRILLING PRODUCER WELL 204/20a- PX204 planned well - BP Exploration Operating Company Limited - DR/2311/1 - Decision Date 12/12/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SOUTHWARK, Southwark, Noble Hans Deul DRILLING PRODUCER WELL 49/21c-A49/21c-E2 planned well - Petrofac Facilities Management Limited - DR/2182/6 - Decision Date 30/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, WATER INJECTOR WELL 9/11a- AHIA (AC44) planned well - Equinor UK Limited - DR/2219/2 - Decision Date 29/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU3P1 planned well - BP Exploration Operating Company Limited - DR/2322/2 - Decision Date 24/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Forties FA Platform - INJECTOR WELL 21/10-A66 - Apache North Sea Limited - DR/2320/1 - Decision Date 23/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

STORR, Ocean Patriot DRILLING PRODUCER WELL 9/19b- 9/19b-SPN planned well - Apache Beryl I Limited - DR/2302/0 - Decision Date 16/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SOUTHWARK, Southwark, Noble Hans Deul DRILLING PRODUCER WELL 49/21c-A49/21c-E2 planned well - PETROFAC FACILITIES MANAGEMENT LIMITED - DR/2182/5 - Decision date 11/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Well 21/03d Leverett Planned Well - PETROFAC FACILITIES MANAGEMENT LIMITED - DR/2321/1 - Decision Date 08/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Orlov 22/08a-E Planned Well - SHELL U.K. LIMITED - DR/2255/3 - Decision Date 08/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, BORR PROSPECTOR 1 DRILLING PRODUCER WELL 44/12a-AAG (AG) PLANNED WELL - Neptune E&P UK Limited - DR/2307/0 - Decision Date 04/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

WELL 21/03d LEVERETT PLANNED WELL - Petrofac Facilities Management Limited - DR/2321/0 - Decision Date 03/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CHISWICK, Maersk Resolve DRILLING PRODUCER WELL 49/04a-C1Y - Spirit Energy North Sea Limited - DR/2240/4 - Decision Date 03/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Mariner Field, Water Injection Well: 9/11a-A30 AMID - Equinor UK Limited - DR/2271/1 - Decision Date 01/11/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, BORR PROSPECTOR 1 DRILLING PRODUCER WELL 44/12a-A1 (AC) - Neptune E&P UK Limited - DR/2252/1 - Decision Date 28/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Forties FA Platform - INJECTOR WELL 21/10-A66 - Apache North Sea Limited - DR/2320/0 - Decision date 28/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU3P1 planned well - BP Exploration Operating Company Limited - DR/2322/1 - Decision Date 28/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Orlov 22/08a-E PLANNED WELL - SHELL U.K. LIMITED - DR/2255/2 - Decision date 27/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENSACOLA (41/5A) PLANNED WELL - Shell U.K. Limited - DR/2275/0 - Decision Date 25/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU5P1 planned well - BP Exploration Operating Company - DR/2265/3 - Decision Date 24/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MAGNUS, Magnus Platform, DRILLING PRODUCER WELL 211/12a-M39Z - EnQuest Heather Limited - DR/2264/1 - Decision Date 14/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, INSTALLATION OF CAN-DUCTOR FOR DRILLING PRODUCER WELL 204/25a- PX25 - BP EXPLORATION OPERATING COMPANY LIMITED - DR/2309/0 - Decision date 13/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, Glen Lyon FPSO, INSTALLATION OF CAN-DUCTOR FOR DRILLING PRODUCER WELL 204/20a- PX204 planned well - BP Exploration Operating Company Limited - DR/2311/0 - Decision Date 13/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

LOYAL FIELD [Part of SCHIEHALLION], Glen Lyon FPSO, CAN-DUCTOR INSTALLATION PRIOR TO DRILLING PLANNED WELL 204/20a- PX104. - BP Exploration Operating Company Limited - DR/2310/0 - Decision Date 13/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, INSTALLATION OF CAN-DUCTOR FOR DRILLING PRODUCER WELL 204/25a- PX423 planned well - BP Exploration Operating Company Limited - DR/2308/0 - Decision Date 13/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GANNET E FIELD, DEVELOPMENT WELL 21/30c- GE04 - PETROFAC FACILITIES MANAGEMENT LIMITED - DR/2282/0 - Decision date 12/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Developement Well 9/18a-BBKSW - BUCKLAND - APACHE BERYL I LIMITED - DR/2251/5 - Decision date 12/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU5P1 planned well - BP EXPLORATION OPERATING COMPANY LIMITED - DR/2265/2 - Decision Date 06/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Serenity, Stena Don DRILLING APPRAISAL WELL SA-02 - Petrofac Facilities Management Limited - DR/2279/1 - Decision Date 05/10/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Development Well 9/18a-BBKSW - BUCKLAND - Apache Beryl I Limited - DR/2251/4 - Decision date 30/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCOTT, Scott JD Platform, DRILLING PRODUCER WELL ST35/ST76 - CNOOC Petroleum Europe Limited - DR/2238/1 - Decision Date 28/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALWYN EAST EXPLORATION HT WELL 3/09a-N43 - Totalenergies E&P UK Limited - DR/2229/1 - Decision Date - 27/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAYMORE FIELD, WELL: 14/19-(C58) CAS - Repsol Sinopec Resources UK Limited - DR/2295/0 - Decision Date 22/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

TOLMOUNT EAST - PRODUCER WELL 42/28d-14 - Premier Oil UK Limited - DR/2299/0 - Decision Date 22/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Serenity, Stena Don DRILLING APPRAISAL WELL 13/23c- 13/23c-SA02.2 planned well - Petrofac Facilities Management Limited - DR/2279/0 - Decision Date 09/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Development Well 9/18a-BBKSW - BUCKLAND - Apache Beryl I Limited - DR/2251/3 - Decision Date 09/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, WELL 9/11a- AIPF - Equinor UK Limited - DR/2270/0 - Decision Date 08/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Forties Alpha Platform, Development Well 21/10-A33 - Apache North Sea Limited - DR/2267/1 - Decision Date 07/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CHISWICK, Maersk Resolve DRILLING PRODUCER WELL 49/04a-C1Y - SPIRIT ENERGY NORTH SEA LIMITED - DR/2240/3 - Decision date 01/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

North Eigg 3/24c -NE1, Planned Exploration Well - SERICA ENERGY (UK) LIMITED - DR/2249/5 - Decision Date 01/09/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Developement Well 9/18a-BBKSW - BUCKLAND - Apache Beryl I Limited - DR/2251/2 - Decision Date 12/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Isabella Appraisal Well 30-12d, Noble Sam Hartley - TotalEnergies E&P North Sea UK Limited - DR/2272/0 - Decision Date 23/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JUDY 30/07a-RD DEVELOPMENT WELL - Chrysaor Petroleum Company U.K. Limited - DR/2208/1 - Decision Date 19/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, WELL 9/11a-AAMID - Equinor UK Limited - DR/2271/0 - Decision Date 18/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Clair-Ridge [Part of Clair], Clair Ridge Platform, Drilling Injector Well 206/08a-BS1U512 planned well - BP Exploration Operating Company Limited - DR/2244/2 - Decision Date 17/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GOLDEN EAGLE, COSLInnovator DRILLING PRODUCER WELL 14/26a-NDPF planned well - CNOOC Petroleum Europe Limited - DR/2278/0 - Decision Date 15/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SOUTHWARK, Southwark, Noble Hans Deul DRILLING PRODUCER WELL 49/21c-A49/21c-E2 planned well - Petrofac Facilities Management Limited - DR/2182/4 - Decision Date 08/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRILLING of SOUTHWARK DEVELOPMENT WELL 49/21c-A1 - Petrofac Facilities Management Limited - DR/2183/4 - Decision Date 08/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

North Eigg 3/24c -NE1, Planned Exploration Well - Serica Energy (UK) Limited - DR/2249/4 - Decision Date 08/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CHISWICK, Maersk Resolve DRILLING PRODUCER WELL 49/04a-C1Y - Spirit Energy North Sea Limited - DR/2240/2 - Decision Date 03/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Development Well 9/18a-BBKSW - BUCKLAND - Apache Beryl I Limited - DR/2251/1 - Decision Date 03/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, Captain WPP'A', DRILLING PRODUCER WELL 13/22a-C51Y - Ithaca Energy (UK) Limited - DR/2269/0 - Decision Date 02/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

North Eigg 3/24c -NE1, Planned Exploration Well - Serica Energy (UK) Limited - DR/2249/3 - Decision Date 01/08/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

North Eigg 3/24c-NE1, Planned Exploration Well - Serica Energy (UK) Limited - DR/2249/2 - Decision Date 28/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE (Part of Clair), Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU5P1 planned well - BP Exploration Operating Company Limited - DR/2265/1 - Decision Date 27/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Burgman BP6 well - Premier Oil UK Limited - DR/2266/0 - Decision Date 26/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Orlov 22/08a-E Planned Well - Shell U.K. Limited - DR/2255/1 - Decision Date 26/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

VALARIS 123, DRILLING EXPLORATION WELL 22/11b-14 & RE-DRILL 22/11b-14a - DIADEM PLANNED WELL - Capricorn Energy UK Limited - DR/2234/1 - Decision Date 18/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

North Eigg 3/24c -NE1, Planned Exploration Well - Serica Energy (UK) Limited - DR/2249/1 - Decision Date 15/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CHISWICK, Maersk Resolve DRILLING PRODUCER WELL 49/04a-C1Y - Spirit Energy North Sea Limited - DR/2240/1 - Decision Date 13/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

211/13a PAN-WEST PLANNED WELL - Shell U.K. Limited - DR/2190/1 - Decision Date 07/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ROCKHOPPER 211/14a- 10 - Shell U.K. Limited - DR/2245/0 - Decision Date 07/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, Captain WPP'A', DRILLING PRODUCER WELL 13/22a-C35Z LM32P - Ithaca Energy (UK) Limited - DR/2256/0 - Decision Date 27/05/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, Borr Prospector 1 DRILLING PRODUCER WELL 44/12a-A1 (AC) - Neptune E&P UK Limited - DR/2252/0 - Decision Date 05/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CATCHER NORTH - PRODUCER WELL 28/09a-NP1 planned well - Premier Oil UK Limited - DR/2212/3 - Decision Date 05/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS2AU5P1 planned well - BP Exploration Operating Company Limited - DR/2265/0 - Decision Date 04/07/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SEAGULL FIELD, VALARIS GORILLA VI DRILLING PRODUCER WELL 22/29c-J2 (JC), HIGH PRESSURE HIGH TEMPERATURE (HPHT) 8.5" WELL SECTION - Neptune E&P UK Limited - DR/2080/3 - Decision Date 30/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MAGNUS, Magnus Platform, DRILLING PRODUCER WELL 211/12a-M39Z - EnQuest Heather Limited - DR/2264/0 - Decision Date 30/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SEAGULL FIELD, VALARIS GORILLA VI DRILLING PRODUCER WELL 22/29c-J1 (JA) - HIGH PRESSURE HIGH TEMPERATURE (HPHT) 8.5" WELL SECTION - Neptune E&P UK Limited - DR/2079/3 - Decision Date 30/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a-AMPP planned well - Equinor UK Limited - DR/2230/1 - Decision Date 30/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

North Eigg 3/24c -NE1, Planned Exploration Well - Serica Energy (UK) Limited - DR/2249/0 - Decision Date 30/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of Clair], Clair Ridge Platform, DRILLING INJECTOR WELL 206/08a-BS1U5I2 planned well - BP Exploration Operating Company Limited - DR/2244/1 - Decision Date 29/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Development Well 9/18a-BBKSW - Buckland, Apache Beryl Limited, DR/2251/0 - Decision Date 24/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BLAKE, Stena Don DRILLING PRODUCER WELL 13/24a-B8Z - Repsol Sinopec Resources UK Limited - DR/2260/1 - Decision Date 22/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCOTT, Scott JD Platform, DRILLING PRODUCER WELL ST35 - CNOOC Petroleum Europe Limited - DR/2238/0 - Decision Date 20/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GARTEN WELL 9/18a- 9/18a-GTN4 - Apache Beryl I Limited - DR/2232/0 - Decision Date 10/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BLAKE, Stena Don DRILLING PRODUCER WELL 13/24a-B8Z - Repsol Sinopec Resources UK Limited - DR/2260/0 - Decision Date 06/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALWYN EAST EXPLORATION HT WELL 3/09a-N34 - TOTALENERGIES E&P UK LIMITED - DR/2229/0 - Decision Date 01/06/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CAPTAIN, COSLPioneer DRILLING PRODUCER WELL 13/22a-AA4 planned well - Ithaca Energy (UK) Limited - DR/2250/0 - Decision Date 31/05/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, WATER INJECTOR WELL 9/11a- AHIA (AC44) planned well - Equinor UK Limited - DR/2219/1 - Decision Date 26/05/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING INJECTOR WELL 206/08a-BS1U5I2 planned well - BP Exploration Operating Company Limited - DR/2244/0 - Decision Date 20/05/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Laverda - Drilling Producer Well 28/09a-LP1 planned well - Premier Oil UK Limited - DR/2213/2 - Decision Date 13/05/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALWYN NORTH, Alwyn North NAA Platform, DRILLING PRODUCER WELL 3/09a-N52Y - TotalEnergies E&P UK Limited - DR/2195/2 - Decision Date 13/05/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Diadem, Valaris 123, DRILLING EXPLORATION WELL 22/11b- Diadem planned well - Capricorn Energy UK Limited - DR/2234/0 - Decision Date 12/05/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CHISWICK, Maersk Resolve DRILLING PRODUCER WELL 49/04a-C1Y - Spirit Energy North Sea Limited - DR/2240/0 - Decision Date 21/04/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Magnus, Magnus Platform, Drilling Producer Well 211/12a-NWM planned well - EnQuest Heather Limited - DR/2241/0 - Decision Date 08/04/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a-AC56 (AMPV) Planned Well - Equinor UK Limited - DR/2131/2 - Decision Date 07/04/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

GARTEN, Ocean Patriot DRILLING PRODUCER WELL 9/18a- GTN3 planned well - Apache Beryl I Limited - DR/2187/3 - Decision Date 30/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SOUTHWARK, Southwark, Noble Hans Deul DRILLING PRODUCER WELL 49/21c-A49/21c-E2 planned well - Petrofac Facilities Management Limited - DR/2182/3 - Decision Date 29/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BARRA FIELD, PLANNED DEVELOPMENT WELL: 210/24a- BP-7 - Dana Petroleum (E&P) Limited - DR/2239/0 - Decision Date 29/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

FORTIES, Forties FC Platform, DRILLING PRODUCER WELL 21/10-C47U - Apache North Sea Limited - DR/2227/0 - Decision Date 28/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

22/19a- Birgitta East well - Petrogas North Sea Limited - DR/2202/1 - Decision Date 28/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

FORTIES, Forties FC Platform, WELL 21/10-C71 - Apache North Sea Limited - DR/2210/1 - Decision Date 24/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Drilling of Southwark Development Well 49/21c-A1 - Petrofac Facilities Management Limited - DR/2183/3 - Decision date 18/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Catcher North - Producer well 28/09a-NP1 planned well - Premier Oil UK Limited - DR/2212/2 - Decision Date 17/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Laverda - Drilling Producer well 28/09a-LP1 planned well - Premier Oil UK Limited - DR/2213/1 - Decision date 17/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Abigail, COSLPioneer Drilling Producer Well 29/10b-8 - Ithaca Energy (UK) Limited - DR/2235/0 - Decision Date 11/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Blake Field:Producer Well 13/24a-B8y (Previous B2z/B8 Dry Hole & B8z Pilot Hole) - Repsol Sinopec Resources UK Limited - DR/2203/2 - Decision Date 07/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Catcher North - Producer Well 28/09a-NP1 planned well - Premier Oil UK Limited - DR/2212/1 - Decision Date 04/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN EAST, Ocean Endeavor DRILLING PRODUCER WELL 211/08- 6 (TYBALT) - Shell U.K. Limited - DR/2142/5 - Decision Date 02/03/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING INJECTOR WELL 206/08aBS2BU512 Planned Well - BP Exploration Operating Company Limited - DR/2223/0 - Decision Date 28/02/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Blake, COSL Pioneer Drilling Producer Well 13/24a-B2Z (B8) and B8z Pilot Well - Repsol Sinopec Resources UK Limited - DR/2203/1 - Decision Date 16/02/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Captain, Captain WPP'A', Drilling Injector Well 13/22a-C63Z LM31I - Ithaca Energy (UK) Limited - DR/2218/0 - Decision Date 16/02/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Well 30/14a-30/14a-E - Planned Well, Edinburgh Exploration Well - Shell U.K. Limited - DR/2216/0 - Decision Date 11/02/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Mariner, Mariner PDQ Platform, Drilling Producer Well 9/11a-AMPP Planned Well - Equinor UK Limited - DR/2230/0 - Decision Date 09/02/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SOUTHWARK, Southwark, Noble Hans Deul Drilling Producer Well 49/21c-A49/21c-E2 planned well - Petrofac Facilities Management Limited - DR/2182/1 - Decision Date 08/02/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Mariner, Mariner PDQ Platform, Water Injector Well 9/11a- AHIA (AC44) planned well - Equinor UK Limited - DR/2219/0 - Decision Date 28/01/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Captain, Captain WPP'A', Drilling Producer Well 13/22a-C67Z W01A - Ithaca Energy (UK) Limited - DR/2166/3 - Decision Date 26/01/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

211/13a Pan-West Planned Well - Shell U.K. Limited - DR/2190/0 - Decision date 24/01/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Clair-Ridge (Part of Clair), Clair Ridge Platform, Drilling Producer well 206/08a-BS2BU5P2 planned well - BP Exploration Operating Company Limited - DR/2167/2 - Decision date 21/01/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Catcher North - Producer Well 28/09a-NP1 planned well - Premier Oil UK Limited - DR/2212/0 - Decision Date 20/01/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Judy 30/07a-RD Development Well - Chrysaor Petroleum Company U.K. Limited - DR/2208/0 - Decision Date - 14/01/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Laverda - Drilling Producer Well 28/09a-LP1 Planned Well - Premier Oil UK Limited - DR/2213/0 - Decision Date 14/01/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Captain, Captain WPP'A', Drilling Producer Well 13/22a-C67Z W01A - Ithaca Energy (UK) Limited - DR/2166/2 - Decision Date 07/01/2022

Request an accessible format
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

Deep Drilling Screening Directions - 2022