Notice

Category A project under consideration: Greater Changhua 4 (Northwest) Offshore Windfarm

Published 11 March 2024

1. Name of project

Greater Changhua 4 (Northwest) Offshore Windfarm.

2. Description of project

The project is an offshore wind development in the Taiwan Strait. The Project is expected to consist of between 54 to 74 wind turbine generators (WTGs), each with a capacity of 8 to 11 Megawatts (MW). There is a grid capacity of up to 598MW. The WTGs will be connected to one offshore substation (OSS) via 33 or 66 Kilovolt (kV) inter-array cable strings, and subsequently to the Changkong grid connection point through two export cables.

3. Location of project

Approximately 50km from the Western shore of Taiwan.

4. Source of environmental information

An Environmental Impact Assessment was developed for the Project and a range of supplementary assessments (English) have also been developed. These documents can be accessed at the following weblink:

https://orsted.tw/en/renewable-energy-solutions/eia-documents (English)

https://orsted.tw/zh/renewable-energy-solutions/eia-documents (Mandarin)

Please note that these sites contain information for more than one project.

Additional environmental and social impact information for the Project can be requested via the listed contact.

Contact:  infoapac@orsted.com