Category A projects supported: Two Sub-Projects for the Rehabilitation and Upgrading of Roads, Tanzania

Published 11 November 2026

1. Project Description

UK Export Finance has agreed to provide support to the Government of The United Republic of Tanzania, represented by the Ministry of Finance in respect to the rehabilitation, upgrading and operation of two sub-projects.

a. Sub-Project 1: the rehabilitation and upgrading of Mkoani to Chake Chake and Pemba Airport Spur roads in Tanzania; and

b. Sub-Project 2: the rehabilitation and upgrading of Tunguu to Makunduchi and Fumba to Kisauni roads in Tanzania.

The key aim of the projects is to provide safer, more efficient and better-connected road infrastructure, improving community access to markets and social services.

The Project includes:

a. Sub-Project 1: The rehabilitation and upgrading of the 43.5 km Mkoani–Chake Chake Road will improve the existing combination of the two and four-lane road facility.

The improvements to the 3.9 km two-lane Pemba Airport Spur Road will change the existing two-lane road to an improved four-lane dual carriageway.

b. Sub-Project 2: The rehabilitation and upgrading of the 48 km Tunguu–Makunduchi Road, including the upgrading of selected sections of the existing two-lane road to a four-lane dual carriageway.

The 12 km Fumba–Kisauni Road will expand the existing two-lane road to an improved four-lane dual carriageway. The works also include a new road section connecting to the Fumba Town Development Project at Mchamba Wima Village.

Both sub-project a and b design features will incorporate:

  • Improvement to junctions, intersections and roundabouts;

  • Upgrade of stormwater management infrastructure (drains, culverts, pipes);

  • Improved safety features including road signs;

  • Pedestrian facilities;

  • Paving the route with an asphalt concrete road surface; and

  • Usage of temporary site camp installations and facilities for the construction phase only.

The review was carried out in collaboration with Deutsche Bank AG.

2. Project Sector

The Projects are in the transport sector.

3. Project Buyer

The Projects are being developed by Ministry of Infrastructure, Communication and Transport of the Revolutionary Government of Zanzibar (MoICT), Tanzania.

4. Applicant

The Applicants for UKEF support are:

a. Sub-Project 1: Mwananchi Engineering Contracting Company Limited (Mecco)

b. Sub-Project 2: Propav Zanzibar Road Construction Limited (Propav)

5. Export Credit Agent Bank

Deutsche Bank AG (DB)

6. Amount of UK Export Finance Support

The maximum liability of the support is approximately:

a. Sub-Project 1: GBP £168,000,000; and

b. Sub-Project 2: GBP £114,500,000.

7. OECD Common Approaches and Equator Principles

UK Export Finance categorised the Project as Category A having potentially significant environmental, social and human rights (ESHR) impacts in accordance with the definition in the Organisation for Economic Co-Operation and Development (OECD) Recommendation of the Council on Common Approaches for Officially Supported Export Credits and Environmental and Social Due Diligence (“Common Approaches”), OECD/LEGAL/0393 and the Equator Principles (2020).

As required by the OECD Common Approaches, UK Export Finance disclosed its possible involvement in the Projects. A notification was posted on the UK Export Finance website on 19 April 2023, which directed interested parties to the contact from where published ESHR information can be sourced. UK Export Finance did not receive any comments from interested parties.

Environmental Resources Management (ERM) was commissioned by Mecco and Propav, separately, to undertake an independent environmental and social due diligence review for each Project on behalf of UKEF and DB.

8. Environmental, Social and Human Rights Standards

Project related ESHR documentation was reviewed for their alignment against the 2012 International Finance Corporation (IFC) Performance Standards (PS) on Environmental and Social Sustainability and the World Bank Group Environmental, Health and Safety (EHS) Guidelines.

The applicable IFC PS were:

  • PS1: Assessment and Management of Environmental and Social Risks and Impacts;

  • PS2: Labour and Working Conditions;

  • PS3: Resource Efficiency and Pollution Prevention;

  • PS4: Community Health, Safety and Security;

  • PS5: Land Acquisition and Involuntary Resettlement;

  • PS6: Biodiversity Conservation and Sustainable Management of Living Natural Resources; and

  • PS8: Cultural Heritage.

The applicable World Bank Group EHS Guidelines were:

  • General EHS Guidelines (2007);

  • Toll Roads (2007); and

  • EHS Guidelines for Construction Materials Extraction (2007).

9. Nature of ESHR Impacts

The review of potential ESHR risks and impacts took into account the following impacts, receptors and issues during the construction and operational phases of the Projects:

  • Land acquisition and economic displacement;

  • Biodiversity and natural habitat;

  • Emissions to the atmosphere (including land, air and water, and climate change);

  • Traffic management and road safety;

  • Occupational health and safety;

  • Community health, safety and security;

  • Waste management;

  • Emergency planning and response;

  • Worker and community grievance mechanisms;

  • Worker conditions of contract; and

  • Community engagement.

10. Assessment of ESHR Impacts

A review was undertaken in line with the requirements of the OECD Common Approaches and Equator Principles to identify potential ESHR risks and impacts of the Projects and how these would be effectively managed.

ERM, acting as the Independent Environmental and Social Consultant, provided support in undertaking the review for each Project separately.

The review included:

  • Site visit to targeted areas of the alignments;
  • Desk-based review of each sub-project related documentation including (but not limited to): Environmental and Social Impact Assessment, Environmental and Social Management Plans, Resettlement Action Plan, Biodiversity Management Plan and Stakeholder Engagement Plan; and
  • Follow-up meetings and interviews relevant to each Project.

The results of these two reviews formed the basis for an evaluation of each sub-project’s alignment with relevant international standards, and recommendations for future compliance and monitoring.

Taking account of these reviews, both the sub-projects were deemed to have potential to cause a number of adverse environmental and social impacts during construction and operation. However, a proposed suite of controls as part of each sub-project’s environmental and social management systems should facilitate the management of these impacts.

11. Climate Change Considerations

UKEF considered the potential direct and indirect green house gas (GHG) emissions of the Projects and effects of climate change factors on the Projects as part of its ESHR review.

The two Projects assessed separately are not considered to be a carbon intensive undertaking (such as fossil fuels or petrochemical) and so “high” GHG emissions in excess of relevant thresholds for quantification and reporting set by international standards were reasonably not envisaged.

The review revealed that each Project’s design has considered potential physical impacts of climate change such as changes to rainfall and weather patterns.

12. Decision

Various actions have been agreed between both Project developers, operator, and parties involved in the financing, which are necessary to ensure the two sub-projects’ on-going alignment with international standards. Following agreement of these commitments, it was concluded that both the sub-projects should meet the relevant international standards over each project’s cycles. UKEF has therefore decided to provide its support in respect of the supply of goods and services by UK exporters to both the sub-projects.

A condition of support is that both sub-projects will be subject to monitoring and reporting in order to provide satisfaction that the Projects are aligned with the relevant international standards throughout the duration of support.

UK Export Finance

02/11/2026