Knightswick Dyke, Canvey Island: proposal for factual change

Published 13 July 2015

This notice was withdrawn on

Your feedback is being analysed.

The Environment Agency consulted on this proposal for change between 13 July 2015 and 16 August 2015.

The Environment Agency proposes to change the existing main river map at Knightswick Dyke, Croppenburg Lake & Pitsea Tidal Reaches, Canvey Island.

It proposes these changes as a ‘determination’ under section 193C(1) of the Water Resources Act 1991. A determination is a formal decision to change the main river map.

The proposed determination is that we shall correct the main river map:

  • between national grid reference (NGR) TQ8050684363 and NGR TQ8050784400 (the Knightswick Dyke).
  • between NGR TQ8158283287 and NGR TQ8171183507 (Croppenburg Lake).
  • between NGR TQ8153483696 and NGR TQ8162883582 (the Pitsea Tidal Reaches).

For each correction, the main river is to be the watercourse shown as an ‘addition’ on the main river consultation map rather than the watercourse shown as a ‘deletion’.

These changes mean that the map would show the correct location of the watercourse. They do not change who has power to carry out flood risk management work on the watercourse.

The need for these changes has been identified as a result of previous flood risk management schemes on Canvey Island:

  • Knightswick Dyke – change of main river alignment to reflect the revised passage of water through the pumping station immediately landward of the tidal defences which replaced the previous tidal sluice
  • Croppenburg Lake – change of main river alignment to reflect the creation of a new pumping main to connect to the new pumping station immediately landward of the tidal defences which replaced the previous gravity sluice.
  • Pitsea Tidal Reaches – change of main river alignment to reflect the revised passage of water towards the new Croppenburg pumping station rather than through the now-abandoned & sealed Smallgains Dam sluice.

1. How to view the proposed changes

You can see the proposals on the main river consultation maps:

Knightswick Dyke: proposal for factual change:

  • ESNFSF_00023 map
  • ESNFSF_00024 map

Pitsea Tidal Reaches: proposal for factual change:

  • ESNFSF_00019 map

Or you can see the main river consultation maps at:

Iceni House
Cobham Road
Ipswich
Suffolk
IP3 9JD

2. Your chance to comment

If you have any comments or queries about this proposal you can email PSOENS@environment-agency.gov.uk or write to:

The PSO Team
Environment Agency
Iceni House
Cobham Road
Ipswich
Suffolk
IP3 9JD

Please quote reference number ESNFSF_00023, ESNFSF_00024 & ESNFSF_00019 when you contact the Environment Agency.

Send your comments to the Environment Agency by 15 August 2015.