Press release

Planned roadworks in Central Southern England: Weekly summary for Monday 27 October – Sunday 2 November 2014

The following summary of planned new and ongoing road improvements over the coming week is correct as of 24 October 2014 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.

This news article was withdrawn on

This content is no longer current.

M27 junction 5 Eastleigh, Hampshire: Junction improvement

Narrow lanes and a reduced speed limit will be in place while junction improvement work takes place. For further details of this scheme visit the Highways Agency’s website.

M27 junction 10 Fareham, Hampshire: Local authority work

The westbound exit slip road will be closed overnight, from 10pm until 6am, on Monday 27 October. A clearly signed diversion will be in place via junction 9.

M3 junction 6 Black Dam improvement Basingstoke, Hampshire

Narrow lanes and a 30mph speed limit will be in place on the approaches and around the roundabout.

The M3 Spur Road will be closed southbound overnight for three nights from Monday 27 October. The closure will take place between 11.59pm and 6am on Sunday and between 10pm and 6am on Monday and Tuesday. A clearly signed diversion will be in place via the A30.

For more information, visit this page

M3 junction 9 Winchester, Hampshire: Slip road surface repair

The southbound entry slip road will be closed overnight, between 10pm and 6am, for four nights from Monday 27 October. A clearly signed diversion will be in place via the A272.

M3 junction 12 Eastleigh, Hampshire: Slip road surface repair

The northbound exit slip road will be closed overnight, between 10pm and 6am, on Monday 27 October. A clearly signed diversion will be in place via junction 11.

M4 junctions 5 Slough, Berkshire to 15 Swindon, Wiltshire: Road marking renewal

Lane closures will be in place along various sections of the M4 in both directions overnight, between 10pm and 6am, for two weeks from Tuesday 28 October (Monday to Friday only).

M4 junctions 8/9 Maidenhead to 11 Reading, Berkshire: Bridge maintenance

Narrow lanes and a 50mph speed limit are in place on the east and westbound carriageways. In addition, the westbound carriageway will be closed overnight, between 10pm and 6am, on Saturday 1 November. A clearly signed diversion will be in place via the A404(M), A4, A2390 and B3270 Lower Earley Way.

For more details please visit this page

M4 junctions 13 Chieveley to 14 Hungerford, West Berkshire: Resurfacing work

Lane closures will be in place on the eastbound carriageway overnight, between 10pm and 6am, until Friday 7 November (Monday to Friday only).

A3 Send Services, Surrey: Slip road surface repair

The northbound exit slip road will be closed overnight, between 10pm and 6am, on Friday 31 October. A clearly signed diversion will be in place via the Ockham Interchange.

A3 Hog’s Back Guildford, Surrey: High friction surface renewal

The northbound entry slip will be closed overnight, between 10pm and 6am, on Tuesday 28 October. A clearly signed diversion route will be in place via the B3000.

A3 University to Stoke Interchanges Guildford, Surrey: Road surface repair

The northbound carriageway will be closed overnight, between 10pm and 6am, on Thursday 30 October. A clearly signed diversion route will be in place via local roads.

A3 Hindhead Tunnel, Surrey: Maintenance

Both bores will be closed overnight, between 9pm and 9am, on Saturday 25 October. A fully signed diversion route will be in place via the A31 and A325.

A3 Berelands to A3(M) Petersfield to Horndean, Hampshire: Road marking renewal

The A3 southbound carriageway will be closed overnight, between 10pm and 6am, on Monday 27 October. A clearly signed diversion will be in place via the A272 and A32.

A303 North Waltham, Hampshire to Parkhouse Cross, Wiltshire: Sign renewal

Lane closures will be in place overnight, between 10pm and 6am, as follows:

  • Monday 27 October: eastbound carriageway between Picket Twenty and Longparish
  • Tuesday 28 October: westbound carriageway between Bullington and Longparish
  • Wednesday 29 October: both carriageways between Parkhouse Cross and Thruxton Race-circuit
  • Thursday 30 October: eastbound carriageway between Picket Twenty and Bullington
  • Friday 31 October: eastbound carriageway between Picket Twenty and Bullington

A34 Hampshire, West Berkshire and Oxfordshire: Road marking renewals Lane closures will be in place along various sections of the A34 north and southbound carriageways overnight, between 10pm and 6am until Wednesday 19 November.

A34/M40 junction 9 Wendlebury, Oxfordshire: Junction improvement

Narrow lanes and a 40mph speed limit will be in place 24 hours a day, until December 2014. There are also overnight lane closures on the A34, A41 and on the roundabout.

For further details of this scheme this page

Safety at Roadworks

The Highways Agency is working with the industry and road users to reduce the risks of working on the roads. For the safety of road workers and all road users, when you are approaching roadworks:

  • Keep within the speed limit – it is there for your safety.
  • Get into the correct lane in good time – don’t keep switching.
  • Concentrate on the road ahead, not the roadworks.
  • Be alert for works’ traffic leaving or entering roadworks.
  • Keep a safe distance – there could be queues in front.
  • Observe all signs – they are there to help you.

General enquiries

Members of the public should contact the Highways Agency Information Line on 0300 123 5000.

Media enquiries

Journalists should contact the Highways Agency press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.

Published 24 October 2014