Electric vehicle chargepoint grant for renters or flat owners

Skip to contents of guide

Eligibility

You can apply for this grant if:

  • you own and live in a flat (this includes flats bought through the shared ownership scheme), or you rent a residential property
  • your home has its own private off-street parking space
  • you own an eligible vehicle

You cannot apply if you:

  • have already claimed for the grant (or its predecessors, the Electric Vehicle Homecharge Scheme (EVHS) and the Domestic Recharge Scheme)
  • are moving house or planning on moving
  • want a new chargepoint, even if a new car is not compatible with the current one
  • want to move an existing chargepoint to a new property
  • live in a house that you own (not a flat that’s part of a house)

Your property

Your property must be in the UK. You cannot apply for this grant if you live in the Channel Islands or Isle of Man.

You can only apply for an existing residential property that you live in. You cannot apply for a property that’s unoccupied or is still being built.

You may need to provide supporting evidence when you apply, such as a rental agreement if you rent the property.

Your parking space

You must have a parking space that:

  • is off-street, private and clearly defined - it does not have to be part of the property
  • is accessible to you at all times
  • you own or have the legal right to - you may need to provide Land Registry title deeds as evidence

You must have proof of all legal rights and permissions, such as from the freeholder of a block of flats.

Your installer will assess if your parking space allows an electric vehicle to charge safely.

Your vehicle

This grant is only for vehicles on the list of OZEV-approved electric vehicles.

You must provide evidence that you own or use an eligible vehicle. This can be:

  • as a registered owner
  • if you’ve leased one for at least 6 months
  • if you’ve used one as a work vehicle for at least 6 months
  • if you’ve currently got one on order

If you lease your vehicle

If your vehicle lease is a bundle with a chargepoint, it must:

  • say that you own the chargepoint once payment is complete
  • list the cost of the chargepoint and installation, including VAT

You must also:

  • make sure the chargepoint warranty meets the grant requirements
  • make sure the associated vehicle lease is for at least 6 months

You must show your installer proof that you lease your electric vehicle.