Transparency data
UKEF: spend over £25,000, February 2025
Updated 24 March 2025
Download CSV 34 KB
Department Family | Entity | Date of Payment | Expense Type | Expense Area | Supplier | Transaction Number | Amount in Sterling | Expense Description |
---|---|---|---|---|---|---|---|---|
ECGD | ECGD | 3 Feb 25 | Agency - Interim Managers | FOD | Alexander Mann Solutions | 16 | £6,159.30 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 16 | £2,100.20 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 16 | £3,130.50 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 16 | £3,130.50 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 16 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Specialist Contractors | DDD | Alexander Mann Solutions | 16 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Specialist Contractors | FCD | Alexander Mann Solutions | 16 | £2,688.00 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 16 | £2,969.60 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Specialist Contractors | IA | Alexander Mann Solutions | 16 | £3,584.00 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Specialist Contractors | MC | Alexander Mann Solutions | 16 | £1,443.90 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Temporary Staff | FCD | Alexander Mann Solutions | 16 | £958.30 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 16 | £804.24 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 16 | £804.24 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 16 | £958.30 | Interim Staff Cost |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £1,471.35 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £2,347.90 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £2,560.00 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £2,645.23 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £2,831.35 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £2,869.65 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £2,874.32 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £2,921.80 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,079.65 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,365.30 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,391.40 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,391.40 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,456.00 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,456.00 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,521.80 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,584.00 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,584.00 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,592.90 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,652.25 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,652.25 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £3,937.85 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £4,106.20 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £4,174.00 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £4,174.00 | Project Contractors |
ECGD | ECGD | 3 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 16 | £5,160.95 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Agency - Interim Managers | FOD | Alexander Mann Solutions | 17 | £6,159.30 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 17 | £2,625.25 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 17 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Agency - Specialist Contractors | DDD | Alexander Mann Solutions | 17 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Agency - Specialist Contractors | FCD | Alexander Mann Solutions | 17 | £2,688.00 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Agency - Specialist Contractors | IA | Alexander Mann Solutions | 17 | £3,584.00 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Agency - Specialist Contractors | MC | Alexander Mann Solutions | 17 | £1,443.90 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Agency - Temporary Staff | FCD | Alexander Mann Solutions | 17 | £958.30 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 17 | £804.24 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 17 | £958.30 | Interim Staff Cost |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £1,961.80 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £2,261.25 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £2,347.90 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £2,406.40 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £2,560.00 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £2,831.35 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £2,869.65 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £2,874.32 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £2,921.80 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,225.60 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,365.30 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,391.40 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,391.40 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,521.80 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,584.00 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,592.90 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,652.25 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,652.25 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £3,937.85 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £4,106.20 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £4,174.00 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £4,174.00 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 17 | £5,160.95 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Agency - Interim Managers | FCD | Alexander Mann Solutions | 18 | £3,130.50 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Interim Managers | FOD | Alexander Mann Solutions | 18 | £6,159.30 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 18 | £2,625.25 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 18 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Specialist Contractors | DDD | Alexander Mann Solutions | 18 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Specialist Contractors | FCD | Alexander Mann Solutions | 18 | £2,688.00 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Specialist Contractors | IA | Alexander Mann Solutions | 18 | £3,584.00 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Specialist Contractors | MC | Alexander Mann Solutions | 18 | £1,443.90 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Temporary Staff | FCD | Alexander Mann Solutions | 18 | £958.30 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 18 | £323.93 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 18 | £958.30 | Interim Staff Cost |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £150.00 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £980.90 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £2,347.90 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £2,389.24 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £2,406.40 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £2,560.00 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £2,831.35 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £2,869.65 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £2,921.80 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,339.20 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,365.30 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,391.40 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,391.40 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,521.80 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,584.00 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,584.00 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,592.90 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,592.93 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,652.25 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,652.25 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £3,937.85 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £4,106.20 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £4,174.00 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £4,927.44 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 18 | £5,160.95 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Agency - Interim Managers | FOD | Alexander Mann Solutions | 19 | £6,159.30 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 19 | £2,625.25 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 19 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Agency - Specialist Contractors | DDD | Alexander Mann Solutions | 19 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 19 | £3,712.00 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 19 | £3,712.00 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Agency - Specialist Contractors | IA | Alexander Mann Solutions | 19 | £3,584.00 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Agency - Specialist Contractors | MC | Alexander Mann Solutions | 19 | £1,443.90 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 19 | £485.90 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 19 | £958.30 | Interim Staff Cost |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £1,382.40 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £1,407.95 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £1,669.60 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £2,347.90 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £2,406.40 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £2,452.25 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £2,560.00 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £2,831.35 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £2,869.65 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £2,874.32 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,225.60 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,365.30 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,391.40 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,391.40 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,521.80 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,584.00 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,592.90 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,652.25 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,652.25 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,652.25 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £3,937.85 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £4,106.20 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £4,174.00 | Project Contractors |
ECGD | ECGD | 21 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 19 | £5,160.95 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Agency - Interim Managers | FOD | Alexander Mann Solutions | 20 | £6,159.30 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 20 | £2,625.25 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 20 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Specialist Contractors | DDD | Alexander Mann Solutions | 20 | £3,652.25 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Specialist Contractors | FCD | Alexander Mann Solutions | 20 | £2,688.00 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Specialist Contractors | FCD | Alexander Mann Solutions | 20 | £2,688.00 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 20 | £2,969.60 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Specialist Contractors | MC | Alexander Mann Solutions | 20 | £1,299.51 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Specialist Contractors | Risk Approval Division | Alexander Mann Solutions | 20 | £2,969.60 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 20 | £804.24 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 20 | £958.30 | Interim Staff Cost |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £1,433.60 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £2,265.08 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £2,347.90 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £2,406.40 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £2,452.25 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £2,457.60 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £2,560.00 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £2,692.24 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £2,869.65 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £2,921.80 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,079.65 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,150.28 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,391.40 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,521.80 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,584.00 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,584.00 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,584.00 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,584.00 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,584.00 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,584.00 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,592.90 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,592.90 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £3,652.25 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £4,174.00 | Project Contractors |
ECGD | ECGD | 28 Feb 25 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 20 | £4,174.00 | Project Contractors |
ECGD | ECGD | 20 Feb 25 | Home Travel /Subsistence/Room hire | Various Business Divisions | Clarity Travel Ltd frmly Mawasem Ltd | 254 | £158,372.61 | Business Travels / External Meeting Rooms |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1945 | £5,267.91 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1945 | £7,273.65 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1945 | £7,754.62 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1945 | £20,595.52 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1946 | £35,737.12 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1946 | £40,615.57 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1946 | £51,006.43 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1946 | £77,591.86 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1947 | £18,601.50 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1947 | £20,350.16 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1947 | £29,466.48 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1947 | £51,527.01 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1947 | £89,747.23 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1950 | £11,160.90 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1950 | £13,190.16 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1950 | £18,263.29 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1950 | £26,380.32 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1951 | £40,077.79 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1951 | £40,077.79 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1951 | £81,170.20 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1952 | £29,424.20 | Technical Services (Recoverable) |
ECGD | ECGD | 3 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1952 | £29,424.20 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1958 | £2,495.21 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1958 | £3,728.23 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1958 | £11,762.47 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1958 | £15,149.43 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1958 | £38,461.34 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1959 | £5,611.69 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1959 | £30,702.16 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1959 | £94,197.29 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1959 | £220,143.00 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1959 | £373,690.21 | Technical Services (Recoverable) |
ECGD | ECGD | 26 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1967 | £25,200.25 | Technical Services (Recoverable) |
ECGD | ECGD | 26 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1967 | £25,475.07 | Technical Services (Recoverable) |
ECGD | ECGD | 26 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1967 | £50,829.18 | Technical Services (Recoverable) |
ECGD | ECGD | 26 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1967 | £122,621.16 | Technical Services (Recoverable) |
ECGD | ECGD | 26 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1967 | £156,607.81 | Technical Services (Recoverable) |
ECGD | ECGD | 27 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1968 | £273,213.44 | Technical Services (Recoverable) |
ECGD | ECGD | 27 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1969 | £5,982.10 | Technical Services (Recoverable) |
ECGD | ECGD | 27 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1969 | £5,982.10 | Technical Services (Recoverable) |
ECGD | ECGD | 27 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1969 | £16,682.19 | Technical Services (Recoverable) |
ECGD | ECGD | 27 Feb 25 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1969 | £116,324.19 | Technical Services (Recoverable) |
ECGD | ECGD | 6 Feb 25 | Project Agency - Specialist Cont | Change Board | COMXPS LTD | 87179 | £24,725.00 | Project Contractors |
ECGD | ECGD | 6 Feb 25 | IT Software Licensing & Subscription | ITD | Bytes Software Services Ltd | 87189 | £94,103.00 | Technical Services |
ECGD | ECGD | 6 Feb 25 | IT Cloud and Hosting | ITD | Bytes Software Services Ltd | 87195 | £74,059.92 | IT Systems |
ECGD | ECGD | 10 Feb 25 | Project Agency - Specialist Cont | Change Board | Softwire Technology Limited | 87196 | £49,775.00 | Project Contractors |
ECGD | ECGD | 10 Feb 25 | Assets Under Construction | Change Board | Softwire Technology Limited | 87198 | £59,202.50 | Project Contractors |
ECGD | ECGD | 12 Feb 25 | Overseas Export Managers | Business Group | Foreign & Commonwealth Office | 87214 | £69,601.79 | Overseas Staff |
ECGD | ECGD | 13 Feb 25 | Project Consultancy Costs | Change Board | KPMG | 87218 | £102,223.00 | Project Consultancy |
ECGD | ECGD | 13 Feb 25 | Project Consultancy Costs | Change Board | KPMG | 87219 | £116,409.50 | Project Consultancy |
ECGD | ECGD | 13 Feb 25 | Project Consultancy Costs | Change Board | KPMG | 87220 | £116,994.00 | Project Consultancy |
ECGD | ECGD | 13 Feb 25 | Project Consultancy Costs | Change Board | KPMG | 87221 | £21,030.00 | Project Consultancy |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Ceox Services Ltd | 87229 | £51,286.00 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Agency - Specialist Cont | Change Board | Softwire Technology Limited | 87232 | £43,585.00 | Project Contractors |
ECGD | ECGD | 17 Feb 25 | Project Consultancy Costs | Change Board | KPMG | 87236 | £21,414.00 | Project Consultancy |
ECGD | ECGD | 21 Feb 25 | Overseas Export Managers | Business Group | Foreign & Commonwealth Office | 87249 | £49,119.03 | Overseas Staff |
ECGD | ECGD | 20 Feb 25 | Marketing | MC | UNLIMITED GROUP UNITED LIMITED | 87253 | £21,871.00 | Marketing and Communication |
ECGD | ECGD | 21 Feb 25 | Online costs | Business Group | Beauhurst (Business Funding Research | 87257 | £90,750.00 | Online Costs |
ECGD | ECGD | 21 Feb 25 | Online costs | Analysis Division | Fitch Solutions Ltd | 87260 | £37,851.64 | Online costs |
ECGD | ECGD | 21 Feb 25 | IT Cloud and Hosting | ITD | Bytes Software Services Ltd | 87263 | £79,353.14 | IT Systems |
ECGD | ECGD | 21 Feb 25 | Online costs | Analysis Division | Fitch Solutions Ltd | 87265 | £31,246.68 | Online costs |
ECGD | ECGD | 26 Feb 25 | Project Consultancy Costs | Change Board | KPMG | 87271 | £43,363.00 | Project Consultancy |
ECGD | ECGD | 26 Feb 25 | Overseas Export Managers | Business Group | Foreign & Commonwealth Office | 87280 | £98,276.16 | Overseas Staff |
ECGD | ECGD | 26 Feb 25 | Consultancy | Compliance | Deloitte LLP | 87286 | £96,500.00 | Consultancy |
ECGD | ECGD | 28 Feb 25 | Marketing | MC | Manning Gottlieb OMD | 87297 | £31,582.98 | Marketing and Communication |
ECGD | ECGD | 28 Feb 25 | Marketing | MC | Manning Gottlieb OMD | 87298 | £22,070.61 | Marketing and Communication |
ECGD | ECGD | 28 Feb 25 | Marketing | MC | Manning Gottlieb OMD | 87300 | £67,329.96 | Marketing and Communication |
ECGD | ECGD | 28 Feb 25 | Marketing | MC | Manning Gottlieb OMD | 87301 | £44,335.24 | Marketing and Communication |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |