FOI release

Appendix A

Updated 1 March 2019
Download CSV 2.36 KB

Download the file to see all the information

This preview shows the first 1,000 rows and 50 columns. Download CSV 2.36 KB

Appendix A
Description
Pothole in lane 2 - M25 J11 B 80/1 please permanently repair
Cracking 3600M25/350 - MP: MP79/6 Carriageway Lane 1 Concrete (Rigid) Chainage Location: 629 (Defect Number: 270166)
Pothole 3600M25/350 - MP: MP79/6 Carriageway Lane 1 Concrete (Rigid) Chainage Location: 662 (Defect Number: 270168)
Pothole in lane 1 - M25 J11 B 80/6 please monitor
Pothole in lane 1 - M25 J11 B 80/6 please permanently repair
4 X Potholes - Lane 1 (2x 400mm x 230mm x 100mm 2 x 130mm x 75mm x 75mm) M25 J11 B 80/5. CAT 2 job for if ViaFix repair does not fail.
4 X Potholes - Lane 1 (2x 400mm x 230mm x 100mm 2 x 130mm x 75mm x 75mm) M25 J11 B 80/5. Please monitor for 28 days and repair permanently if failed.
(Carriageway or Footway - Pothole) CAT 1 POTHOLE LANE 1OP TIGER300 X 300 X 75MM [Please monitor for 28 days and repair permanently if failed] M25_B_80.7
(Carriageway or Footway - Pothole) CAT 1 POTHOLE LANE 1OP TIGER300 X 300 X 75MM [CAT 2 job for if ViaFix repair does not fail] M25_B_80.7
Cracking 3600M25/331 - MP: MP80/3 Carriageway Lane 1 Flexible (Asphalt) Chainage Location: 939 (Defect Number: 270057)
Scaling 3600M25/331 - MP: MP81/1 Carriageway Lane 1 Flexible (Asphalt) Chainage Location: 144 (Defect Number: 270061)
Pothole 3600M25/331 - MP: MP80/9 Carriageway Lane 1 Flexible (Asphalt) Chainage Location: 272 (Defect Number: 270060)
Pothole - Lane 1 (450x300x150mm) M25 J11 B 80/6. Please monitor for 28 days and repair permanently if failed.
Pothole - Lane 1 (450x300x150mm) M25 J11 B 80/6. CAT 2 job for if ViaFix repair does not fail.
Pothole - Lane 1 (300 X 250 X 100mm) M25 J11 B 80/3. Please monitor for 28 days and repair permanently if failed.
Pothole - Lane 1 (300 X 250 X 100mm) M25 J11 B 80/3. CAT 2 job for if ViaFix repair does not fail.