{"analytics_identifier":null,"base_path":"/government/publications/flood-and-coastal-risk-management-national-report/flood-and-coastal-erosion-risk-management-report-1-april-2023-to-31-march-2024","content_id":"d8b0d145-d97f-46b7-a5ff-b7a6e746beb4","description":null,"details":{"body":"<div class=\"govspeak\"><p>The Environment Agency use this report to summarise activities carried out by risk management authorities (<abbr title=\"Risk Management Authorities\">RMAs</abbr>) in England. Producing this report is a requirement of <a rel=\"external\" href=\"https://www.legislation.gov.uk/ukpga/2010/29/section/18\">Section 18 of the Flood and Water Management Act</a> 2010 (<abbr title=\"Flood and Water Management Act\">FWMA</abbr>). This report is for the period 1 April 2023 to 31 March 2024.</p>\n\n<p><abbr title=\"Risk Management Authorities\">RMAs</abbr> are:</p>\n\n<ul>\n  <li>Environment Agency</li>\n  <li>lead local flood authorities (<abbr title=\"Lead Local Flood Authorities\">LLFAs</abbr>)</li>\n  <li>district councils (where there is no unitary authority)</li>\n  <li>internal drainage boards (<abbr title=\"Internal Drainage Boards\">IDBs</abbr>)</li>\n  <li>water and sewerage companies</li>\n  <li>highways authorities</li>\n</ul>\n\n<p><abbr title=\"Risk Management Authorities\">RMAs</abbr> work together to reduce the risk of flooding and coastal erosion. We also work with the <a href=\"https://www.gov.uk/government/publications/regional-flood-and-coastal-committees-map\">regional flood and coastal committees</a> (<abbr title=\"Regional Flood and Coastal Committees\">RFCCs</abbr>).</p>\n\n<p>The <abbr title=\"Regional Flood and Coastal Committees\">RFCCs</abbr>:</p>\n\n<ul>\n  <li>bring together <abbr title=\"Risk Management Authorities\">RMAs</abbr> and other local organisations to better understand flood and coastal erosion risks in their region</li>\n  <li>make sure there are coherent plans to manage flood and coastal erosion risks across catchments and shorelines</li>\n  <li>encourage efficient, targeted and risk-based investment that meets the needs of local communities</li>\n  <li>assign funding through a local levy as set out in <a rel=\"external\" href=\"https://www.legislation.gov.uk/ukpga/2010/29/section/23\">section 23 of the <abbr title=\"Flood and Water Management Act\">FWMA</abbr></a>\n</li>\n</ul>\n\n<h2 id=\"executive-summary\">1. Executive summary</h2>\n\n<p>This year (April 2023 to March 2024) has seen wet, windy and stormy weather across the country. The country has experienced 13 named storms, compared to just 1 in 2022 to 2023 and 7 in 2021 to 2022.</p>\n\n<p>Overall, England has experienced in wettest 18-month period since records began in 1836. Met office figures show that just under 1,700 mm of rain fell from October 2022 to March 2024.</p>\n\n<p>While flood defences across the country have protected nearly 250,000 properties, this weather has unfortunately resulted in more than 5,000 properties flooding. This flooding was mainly due to storms Babet, Ciaran, Henk and Gerrit.</p>\n\n<p>Throughout the year, we have continued working with partners to better protect a further 29,000 properties from flooding and coastal erosion. This means that since April 2021 over 88,000 properties have benefited from better protection.</p>\n\n<p>We have also continued to carry out the practical actions set out in the <a href=\"https://www.gov.uk/government/publications/flood-and-coastal-erosion-risk-management-strategy-roadmap-to-2026\">flood and coastal erosion risk management (<abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr>) strategy roadmap</a>. These actions will help us achieve the ambitions in the <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> strategy</a>. They recognise the importance of resilience, adaptation to flooding and working with natural processes to reduce risk.</p>\n\n<p>Natural flood management (<abbr title=\"Natural Flood Management\">NFM</abbr>) reduces local flood risk while at the same time improving habitats and biodiversity. The £25 million <abbr title=\"Natural Flood Management\">NFM</abbr> programme that we launched in September is our single biggest investment in <abbr title=\"Natural Flood Management\">NFM</abbr>. What we learn from this programme will help us mainstream <abbr title=\"Natural Flood Management\">NFM</abbr>.</p>\n\n<p>We have refreshed all the <a href=\"https://www.gov.uk/guidance/shoreline-management-plans\">Shoreline Management Plans (<abbr title=\"Shoreline Management Plans\">SMPs</abbr>)</a> around England, in collaboration with coastal groups. These set out a range of management approaches for our coastline looking out to the end of century and beyond.</p>\n\n<p>We have also developed the <a rel=\"external\" href=\"https://environment.data.gov.uk/shoreline-planning\"><abbr title=\"Shoreline Management Plan\">SMP</abbr> Explorer</a>, a new map-based digital tool. This makes <abbr title=\"Shoreline Management Plans\">SMPs</abbr> easier to access, understand and use for policy makers and practitioners.</p>\n\n<p>We are also taking a more active strategic leadership role to help support and enable others to plan for and adapt to surface water flood risks. We recognise that we are uniquely placed to bring together those working surface water flood risk management to share good practice and promote innovation.</p>\n\n<p>This year’s storms have also had significant impacts on farmers and agricultural land around the country. We have worked with government to provide expert advice to help inform several initiatives this year, including:</p>\n\n<ul>\n  <li>sustainable farming incentive</li>\n  <li>countryside stewardship</li>\n  <li>landscape recovery</li>\n  <li>catchment sensitive farming programme</li>\n</ul>\n\n<p>Many of these initiatives work with natural processes to benefit farmers and land managers. They also help to enhance the flood resilience of rural communities.</p>\n\n<h2 id=\"the-year-in-context\">2. The year in context</h2>\n\n<p>This section describes:</p>\n\n<ul>\n  <li>significant flooding and coastal events</li>\n  <li>progress against strategic plans</li>\n  <li>government policy announcements</li>\n</ul>\n\n<h3 id=\"flooding-between-april-2023-and-march-2024\">2.1 Flooding between April 2023 and March 2024</h3>\n\n<h4 id=\"storm-babet--18-to-21-october-2023\">2.1.1 Storm Babet – 18 to 21 October 2023</h4>\n\n<p>Storm Babet caused severe and widespread disruption across much of the country. Heavy, persistent and widespread rain affected much of the country, with 100mm falling fairly widely. Overall, this was the third-wettest independent 3-day period for England and Wales since 1891.</p>\n\n<p>The extensive flooding resulted in more than 750 flood warnings and alerts being issued. This included 5 severe warnings in the areas at highest risk.</p>\n\n<p>We also deployed:</p>\n\n<ul>\n  <li>more than a kilometre of demountable barriers</li>\n  <li>700m of temporary barriers</li>\n  <li>high volume pumps and smaller pumps to remove water from flooded areas</li>\n</ul>\n\n<p>Over 5,000 properties flooded from Storm Babet while flood defences protected around 97,000. Sadly, 7 people were reported to have died because of the storm.</p>\n\n<p>Our flood digital services recorded some of their busiest periods ever:</p>\n\n<ul>\n  <li>the Flood Warning System (FWS) recorded its busiest day ever - more than 5,500 new users registered for warnings and almost 400,000 messages were sent in a single day</li>\n  <li>overall the FWS sent almost 800,000 messages over the course of the storm</li>\n  <li>Floodline received over 1800 calls on one day – the highest daily number since December 2015</li>\n  <li>check for flooding logged over 2 million visitors</li>\n</ul>\n\n<h4 id=\"storm-ciarn--1-to-3-november-2023\">2.1.2 Storm Ciarán – 1 to 3 November 2023</h4>\n\n<p>Storm Ciarán was an exceptionally severe storm for the time of year, with very high winds and significant rainfall. This rainfall made existing flooding problems worse and caused many rivers to overtop their banks. Plymouth recorded the lowest atmospheric pressure for November on record, at 953.3 hPa.</p>\n\n<p>Storm Ciarán caused major disruption across the south of England:</p>\n\n<ul>\n  <li>the port of Dover was temporarily closed</li>\n  <li>ferry services were cancelled</li>\n  <li>flights and rail services were cancelled</li>\n  <li>hundreds of schools were shut</li>\n  <li>almost 150,000 homes were left without power</li>\n</ul>\n\n<p>Large waves affected the South Coast and a major incident was declared in Hampshire and on the Isle of Wight.</p>\n\n<p>Around 300 properties flooded because of Storm Ciarán. Nearly 43,000 properties were protected by existing flood defences.</p>\n\n<p>We carried out a range of activities to reduce the impact of the storm, including:</p>\n\n<ul>\n  <li>installing temporary flood barriers in Exeter as part of the Exeter flood defence scheme</li>\n  <li>operating flood gates</li>\n  <li>replacing demountable barrier beams at Bewdley, Worcestershire</li>\n  <li>using specialist equipment to check flow rates of the River Wey in Surrey</li>\n</ul>\n\n<h4 id=\"storm-gerrit-27-to-28-december-2023-and-storm-henk-2-january-2024\">2.1.3 Storm Gerrit (27 to 28 December 2023) and Storm Henk (2 January 2024)</h4>\n\n<p>Storms Gerrit and Henk were the 7th and 8th named storms of the 2023 to 2024 season. Together, they brought heavy rainfall and high winds to most parts of England. Parts of the country had a month’s worth of rain in the first 4 days of January. Several river systems saw record levels or close to record levels, including:</p>\n\n<ul>\n  <li>Trent</li>\n  <li>Thames</li>\n  <li>Severn</li>\n  <li>Avon</li>\n</ul>\n\n<p>This rainfall fell on already saturated catchments causing flooding which affected around 2,500 properties. Flood defences protected around 102,000 properties across the country.</p>\n\n<p>Several major incidents were declared including in Nottingham due to flooding on the River Trent. The River Trent recorded some of its highest levels in over 20 years.</p>\n\n<p>We carried out a range of activities to manage the impacts of the flooding including:</p>\n\n<ul>\n  <li>pumping water away from affected areas in Nottinghamshire and Berkshire</li>\n  <li>deploying demountable defences along the River Severn in Bewdley</li>\n</ul>\n\n<p>These winter storms caused significant impacts to farmland and farming business across the country. As a result, the farming recovery fund was activated for eligible areas.</p>\n\n<p>The number of properties flooded reflects the latest information as of April 2024. The numbers may change as we gather more data.</p>\n\n<h4 id=\"recovery-activities\">2.1.3 Recovery activities</h4>\n\n<p>Following flooding incidents, we carry out a range of recovery activities. These include:</p>\n\n<ul>\n  <li>reviews of flood forecasting and warning</li>\n  <li>inspecting assets</li>\n  <li>gathering learning from events</li>\n  <li>reviewing health, safety and wellbeing</li>\n</ul>\n\n<p>The information we collect helps us improve how we respond to flood events in the future. </p>\n\n<p>As of May 2024, we have completed over 68,000 inspections of assets affected by this year’s storms. These inspections have identified around 1,800 damaged assets. Of these 1,400 are in Environment Agency high consequence systems. There were at least 13 breaches to flood embankments directly impacting farmland and nearby infrastructure.</p>\n\n<p>We closely monitor any damaged defences and put in place mitigation measures. We also carry out any necessary urgent or emergency repairs.</p>\n\n<h4 id=\"record-of-past-flood-events\">2.1.4 Record of past flood events</h4>\n\n<p>Table 1: previous flood events, properties flooded and properties protected since 2020.</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Date</th>\n      <th scope=\"col\">Flood event</th>\n      <th scope=\"col\">Properties flooded</th>\n      <th scope=\"col\">Properties protected</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <td>February 2020</td>\n      <td>Storm Ciara</td>\n      <td>1,350</td>\n      <td>23,000</td>\n    </tr>\n    <tr>\n      <td>February 2020</td>\n      <td>Storm Dennis</td>\n      <td>1,570</td>\n      <td>25,000</td>\n    </tr>\n    <tr>\n      <td>February 2020</td>\n      <td>Late February</td>\n      <td>520</td>\n      <td>36,000</td>\n    </tr>\n    <tr>\n      <td>December 2020</td>\n      <td>Storm Bella and heavy rain in Buckingham, Newport Pagnell, Northampton, Rugby</td>\n      <td>400</td>\n      <td>9,000</td>\n    </tr>\n    <tr>\n      <td>January 2021</td>\n      <td>Storm Christoph</td>\n      <td>680</td>\n      <td>49,000</td>\n    </tr>\n    <tr>\n      <td>February 2022</td>\n      <td>Storm Dudley, Eunice, Franklin</td>\n      <td>370</td>\n      <td>35,000</td>\n    </tr>\n    <tr>\n      <td>January 2023</td>\n      <td>Midlands and South West</td>\n      <td>170</td>\n      <td>5,500</td>\n    </tr>\n    <tr>\n      <td>October and November  2023</td>\n      <td>Storm Babet &amp; Ciaran</td>\n      <td>5,600</td>\n      <td>140,000</td>\n    </tr>\n    <tr>\n      <td>January 2024</td>\n      <td>Storms Henk and Gerrick</td>\n      <td>2,500</td>\n      <td>102,000</td>\n    </tr>\n  </tbody>\n</table>\n\n<h3 id=\"national-flood-and-coastal-erosion-risk-management-strategy-for-england\">2.2 National Flood and Coastal Erosion Risk Management Strategy for England</h3>\n\n<p>The <a rel=\"external\" href=\"https://www.legislation.gov.uk/ukpga/2010/29/contents\"><abbr title=\"Flood and Water Management Act\">FWMA</abbr></a> states that we must develop, apply, maintain, and monitor a strategy for <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> in England. The current <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy</a> was adopted by Parliament and published on 25 September 2020.</p>\n\n<p>The <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy</a>:</p>\n\n<ul>\n  <li>contributes to our strategic overview role of all <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> activities</li>\n  <li>is a statutory framework to guide those involved in <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> to achieve its ambitions on the ground</li>\n</ul>\n\n<p>All <abbr title=\"Risk Management Authorities\">RMAs</abbr> have a duty to act consistently with the <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy</a> when carrying out their <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> roles.</p>\n\n<p>The <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy’s</a> long-term vision is for a nation ready for, and resilient to, flooding and coastal change – today, tomorrow and to the year 2100.</p>\n\n<p>It has 3 ambitions:</p>\n\n<ul>\n  <li>climate resilient places</li>\n  <li>today’s growth and infrastructure resilient in tomorrow’s climate</li>\n  <li>a nation ready to respond and adapt to flooding and coastal change</li>\n</ul>\n\n<p>The 3 ambitions consist of 21 strategic objectives covering the next 10 to 30 years. The <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy</a> also contains 56 shorter term measures. These explain the immediate activities <abbr title=\"Risk Management Authorities\">RMAs</abbr> will take to achieve each objective.</p>\n\n<h4 id=\"flood-and-coastal-erosion-risk-management-strategy-roadmap-to-2026\">2.2.1 Flood and Coastal Erosion Risk Management Strategy Roadmap to 2026</h4>\n\n<p>On 7 June 2022, we published the <a href=\"https://www.gov.uk/government/publications/flood-and-coastal-erosion-risk-management-strategy-roadmap-to-2026\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> strategy roadmap to 2026</a>. This sets out the practical actions we will take to achieve the ambitions in the <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy</a>.</p>\n\n<p>These actions will:</p>\n\n<ul>\n  <li>help us tackle the growing threat of flooding from rivers, the sea, and surface water as well as coastal erosion</li>\n  <li>provide a range of benefits, including local nature recovery, carbon reduction, improved water quality and more integrated water management – this will help with both flood and drought resilience</li>\n</ul>\n\n<p>We developed the <a href=\"https://www.gov.uk/government/publications/flood-and-coastal-erosion-risk-management-strategy-roadmap-to-2026\">Roadmap</a> in collaboration with 31 partners across multiple sectors.</p>\n\n<p>This year we have completed several important actions that contribute towards achieving the <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy ambitions. These achievements are described in more detail later in this report.</p>\n\n<p>Climate resilient places</p>\n\n<p>This year, we have:</p>\n\n<ul>\n  <li>worked with coastal groups to refresh the <abbr title=\"Shoreline Management Plans\">SMPs</abbr>, as well as reviewing the associated action plans and priorities</li>\n  <li>published the <a rel=\"external\" href=\"https://environment.data.gov.uk/shoreline-planning\"><abbr title=\"Shoreline Management Plan\">SMP</abbr> Explorer</a>, which is an online map-based tool for <abbr title=\"Shoreline Management Plan\">SMP</abbr> information</li>\n  <li>invested £25 million in 40 natural flood management projects which use nature to increase the nation’s flood resilience</li>\n  <li>expanded the Coastal Transition Accelerator Programme to include projects in Bude, Charmouth and Swanage – these help vulnerable communities explore innovative approaches to adapt to the effects of coastal erosion</li>\n  <li>reviewed and updated the Thames Estuary 2100 Plan – this ensures that the Thames estuary remains resilient to a changing climate</li>\n</ul>\n\n<p>Today’s growth and infrastructure resilient in tomorrow’s climate</p>\n\n<p>This year, we have:</p>\n\n<ul>\n  <li>supported the development of skills and capabilities of local planners – this will make sure new developments are resilient to flooding and coastal change and encourages environmental net gain</li>\n  <li>published a streamlined approach to developing and funding business cases for Property Flood Resilience (<abbr title=\"Property Flood Resilience\">PFR</abbr>) projects which will enable more <abbr title=\"Property Flood Resilience\">PFR</abbr> projects to be completed</li>\n  <li>launched a new framework of suppliers for <abbr title=\"Property Flood Resilience\">PFR</abbr> which will result in a higher standard of <abbr title=\"Property Flood Resilience\">PFR</abbr> product and installation</li>\n  <li>launched new biodiversity net gain guidance for capital projects which will help projects achieve biodiversity net gain and encourage other environmental benefits</li>\n</ul>\n\n<p>A nation ready to respond and adapt to flooding and coastal change.</p>\n\n<p>This year we:</p>\n\n<ul>\n  <li>worked with partners and the insurance industry to review the recovery phase from a broad selection of historic major flood events and learn from other major civil emergencies</li>\n  <li>led conversations with local resilience forums (<abbr title=\"Local resilience forums\">LRFs</abbr>) on the role of the third sector in responding to significant flood incidents across the country</li>\n</ul>\n\n<p><abbr title=\"Local resilience forums\">LRFs</abbr> are multi-agency partnerships made up of representatives from the emergency services, local authorities, NHS, Environment Agency and others.</p>\n\n<h3 id=\"changes-to-government-policy-and-announcements\">2.3 Changes to government policy and announcements</h3>\n\n<p>The <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy</a> calls for the nation to embrace a broad range of resilience actions to better protect and prepare against flooding and coastal change.</p>\n\n<p>Several important actions were achieved this year.</p>\n\n<h4 id=\"property-flood-resilience-repair-grant-scheme\">Property flood resilience repair grant scheme</h4>\n\n<p>The <abbr title=\"Property Flood Resilience\">PFR</abbr> repair grant scheme was activated twice this year for both Storm Babet and Storm Henk. The scheme lets eligible flood-hit property owners apply for up to £5,000 to help make their homes and businesses more resilient to future flooding.</p>\n\n<h4 id=\"farming-recovery-fund\">Farming recovery fund</h4>\n\n<p>The <a href=\"https://www.gov.uk/government/news/government-opens-fund-to-support-farmers-affected-by-flooding\">farming recovery fund</a> allows farmers who have suffered uninsurable damage to their land to apply for grants of up to £25,000. This money helps farmers with repair and reinstatement costs to return their land to the condition it was in before exceptional flooding. The fund was activated this year for eligible areas affected by Storm Henk.</p>\n\n<p>These areas included:</p>\n\n<ul>\n  <li>Gloucestershire</li>\n  <li>Leicestershire</li>\n  <li>Lincolnshire</li>\n  <li>Nottinghamshire</li>\n  <li>Somerset</li>\n  <li>Warwickshire</li>\n  <li>West Northamptonshire</li>\n  <li>Wiltshire</li>\n  <li>Worcestershire</li>\n</ul>\n\n<h4 id=\"frequently-flooded-allowance\">Frequently flooded allowance</h4>\n\n<p>In April 2023, the first 53 communities in England to benefit from the £100 million <a href=\"https://www.gov.uk/government/news/frequently-flooded-allowance-funding-for-repeatedly-flooded-communities\">frequently flooded allowance</a> were announced. These communities have been allocated a total of £48 million, better protecting more than 2,300 households and businesses.</p>\n\n<h4 id=\"coastal-transition-accelerator-programme\">Coastal transition accelerator programme</h4>\n\n<p>In September 2023, <a href=\"https://www.gov.uk/government/news/coastal-adaptation-projects-in-south-west-england-to-receive-6m-in-funding\">3 further communities</a> joined the <a href=\"https://www.gov.uk/government/news/communities-to-trial-innovative-ways-of-adapting-to-coastal-erosion\">Coastal Transition Accelerator Programme</a>. These are:</p>\n\n<ul>\n  <li>Bude</li>\n  <li>Charmouth</li>\n  <li>Swanage</li>\n</ul>\n\n<p>Together, they will share £6 million to support adaptation to coastal erosion. This is in addition to North Norfolk and East Riding of Yorkshire previously announced.</p>\n\n<p>The programme is exploring how best to support communities most affected by coastal erosion to plan for the long term. This includes through interventions such as improving and replacing damaged community infrastructure like beach access or coastal transport links.</p>\n\n<p>We will share lessons from this programme to help other coastal communities and risk management authorities to prepare for a changing coastline.</p>\n\n<h4 id=\"national-audit-office-and-public-accounts-committee-reports\">National Audit Office and Public Accounts Committee reports</h4>\n\n<p>The National Audit Office (<abbr title=\"National Audit Office\">NAO</abbr>) <a rel=\"external\" href=\"https://www.nao.org.uk/wp-content/uploads/2023/11/Resilience-to-flooding-.pdf\">report on value for money in FCRM</a> was published on 15 November 2023.</p>\n\n<p>The Public Accounts Committee (<abbr title=\"Public accounts committee\">PAC</abbr>) met on 27 November 2023 to discuss the findings from the <abbr title=\"National Audit Office\">NAO</abbr> report and other issues related to flood risk.</p>\n\n<p>On 17 January 2024 the <abbr title=\"Public accounts committee\">PAC</abbr> published <a rel=\"external\" href=\"https://committees.parliament.uk/publications/42888/documents/213370/default/\">their report on the inquiry into resilience to flooding</a>.</p>\n\n<p>The <a rel=\"external\" href=\"https://assets.publishing.service.gov.uk/media/6603f57813397a0011e419bb/E03102170_-_Treasury_Minutes_-_Government_Response_to_the_Committee_of_Public_Accounts_on_the_Seventh_to_the_Eleventh_reports_from_Session_2023-24_Accessible.pdf\">previous government’s response to the Committee’s report</a> was published  on 31 March 2024.</p>\n\n<p>Defra are working with the Environment Agency to develop a methodology for measuring and reporting ‘net’ change in flood risk at a national level. The new National Flood Risk Assessment (<abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr>) will introduce this capability. It will establish a new risk baseline against which change can be measured. The Environment Agency expects to be able to report “net” change in risk from 2025 onwards. This is in line with the timescales agreed with the National Audit Office following their 2020 report Managing Flood Risk.</p>\n\n<h4 id=\"natural-flood-management-programme\">Natural flood management programme</h4>\n\n<p>In February 2024 the Environment Agency announced the 40 projects that will benefit from the £25 million Natural Flood Management Programme. These projects will use natural processes such as planting trees and creating wetlands to slow and store water and dissipate wave energy. This helps reduce the risk of flooding.</p>\n\n<h4 id=\"flood-risk-indicators\">Flood risk indicators</h4>\n\n<p>The Environment Agency will report on a national set of indicators to monitor long term trends over time in tackling flood and coastal erosion in England.</p>\n\n<p>These indicators cover all sources of flood risk and will provide an improved understanding of progress to create a more resilient nation.</p>\n\n<p>The indicators are:</p>\n\n<ul>\n  <li>properties better protected from flooding through defences</li>\n  <li>asset condition</li>\n  <li>planning applications granted against flood risk advice</li>\n  <li>availability and take up of flood warnings</li>\n</ul>\n\n<p>The Environment Agency will report against these indicators annually through this report.</p>\n\n<h2 id=\"current-risk-and-investment\">3. Current risk and investment</h2>\n\n<p>This section provides information on flood risk, investment and partnership working.</p>\n\n<h3 id=\"properties-in-areas-at-risk-of-flooding\">3.1 Properties in areas at risk of flooding</h3>\n\n<p>Overall, around 5.5 million homes and businesses in England are at risk from flooding. That risk can be from one or a combination of sources including:</p>\n\n<ul>\n  <li>rivers</li>\n  <li>the sea</li>\n  <li>rising groundwater</li>\n  <li>surface water</li>\n  <li>overwhelmed drains and sewers</li>\n</ul>\n\n<p>Some properties are at risk from more than one source of flooding.</p>\n\n<p>Table 2: properties in areas at risk of flooding from rivers and the sea (as of December 2023), and from surface water as of (as of January 2024).</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Level of risk</th>\n      <th scope=\"col\">Annual likelihood of flooding (percentage)</th>\n      <th scope=\"col\">Total number of properties in areas at risk of flooding from rivers and the sea</th>\n      <th scope=\"col\">Number of residential properties in areas at risk of flooding from rivers and the sea</th>\n      <th scope=\"col\">Total number of properties in areas at risk of flooding from surface water</th>\n      <th scope=\"col\">Number of residential properties in areas at risk of flooding from surface water</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">High</th>\n      <td>Greater than 3.3%</td>\n      <td>196,100</td>\n      <td>122,700</td>\n      <td>344,100</td>\n      <td>272,300</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Medium</th>\n      <td>3.3% – 1%</td>\n      <td>623,800</td>\n      <td>454,900</td>\n      <td>504000</td>\n      <td>416,900</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Low</th>\n      <td>1% – 0.1%</td>\n      <td>1,069,500</td>\n      <td>851,700</td>\n      <td>2,370,700</td>\n      <td>1,985,500</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Very low</th>\n      <td>Less than 0.1%</td>\n      <td>717,300</td>\n      <td>612,800</td>\n      <td>Not assessed</td>\n      <td>Not assessed</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Total</th>\n      <td> </td>\n      <td>2,606,600</td>\n      <td>2,042,000</td>\n      <td>3,218,900</td>\n      <td>2,674,600</td>\n    </tr>\n  </tbody>\n</table>\n\n<p>We have paused the updating of our national modelled flood risk products at present. This is because we are developing a new National Flood Risk Assessment (<abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr>), which is a significant update to our approach to mapping and modelling of flood risk.</p>\n\n<p>Due to the complexity and nature of groundwater flooding, we are not able to assign a likelihood to it.</p>\n\n<h4 id=\"changes-in-properties-in-areas-at-risk-from-flooding-and-coastal-erosion\">3.1.1 Changes in properties in areas at risk from flooding and coastal erosion</h4>\n\n<p>The numbers of properties in areas at risk from flooding and coastal erosion change over time. This is shown in table 3.</p>\n\n<p>This is due to factors including:</p>\n\n<ul>\n  <li>changes in land use</li>\n  <li>changes to the natural environment</li>\n  <li>the increasing impacts of climate change</li>\n  <li>investment in building and maintaining flood and sea defences</li>\n  <li>ageing defences that require maintenance or replacement</li>\n</ul>\n\n<p>All these factors will influence the total number of properties at risk of flooding in any given year and in any given location.</p>\n\n<p>Table 3: properties in areas at risk of flooding by source each year from 1 April to 31 March from 2019 to 2024</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Source of flooding</th>\n      <th scope=\"col\">Number of properties in areas at risk 2019 to 2020</th>\n      <th scope=\"col\">Number of properties in areas at risk 2020 to 2021</th>\n      <th scope=\"col\">Number of properties in areas at risk 2021 to 2022</th>\n      <th scope=\"col\">Number of properties in areas at risk 2022 to 2023</th>\n      <th scope=\"col\">Number of properties in areas at risk 2023 to 2024</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">Rivers and the sea</th>\n      <td>2.5 million</td>\n      <td>2.5 million</td>\n      <td>2.5 million</td>\n      <td>2.8 million</td>\n      <td>2.6 million</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Rivers and the sea at high or medium risk</th>\n      <td>852,000</td>\n      <td>846,000</td>\n      <td>822,000</td>\n      <td>900,000</td>\n      <td>819,900</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Surface water</th>\n      <td>3.2 million</td>\n      <td>3.2 million</td>\n      <td>3.2 million</td>\n      <td>3.4 million</td>\n      <td>3.2 million</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Groundwater</th>\n      <td>122,000 – 290,000</td>\n      <td>122,000 – 290,000</td>\n      <td>122,000 – 290,000</td>\n      <td>122,000 – 290,000</td>\n      <td>122,000 – 290,000</td>\n    </tr>\n  </tbody>\n</table>\n\n<p>We continue to update our underlying property information. We updated and improved our national receptor dataset (<abbr title=\"National receptor dataset\">NRD</abbr>) in August 2023.</p>\n\n<p>These improvements include:</p>\n\n<ul>\n  <li>better identification of ancillary buildings, for example outbuildings - these were previously counted as separate properties but are now included with main buildings where appropriate</li>\n  <li>better identification of properties in shared buildings, for example residential flats</li>\n  <li>a large reduction in properties which we previously couldn’t classify and which when classified are not relevant to flood risk, for example covered walkways</li>\n</ul>\n\n<p>This improved information means that overall, the number of properties identified as being at risk has decreased since last year.</p>\n\n<p>This does not reflect a decrease in risk, but rather a better understanding of the level of risk. This change can be seen in the 2023 to 2024 risk values in table 3.</p>\n\n<p>Table 3 shows that:</p>\n\n<ul>\n  <li>2.6m properties are at risk of flooding from rivers and the sea </li>\n  <li>3.2m properties are in areas at risk of surface water flooding</li>\n</ul>\n\n<p>Some properties are at risk from flooding from multiple sources. For example, around 642,000 properties are at risk from flooding from rivers, the sea, and surface water.</p>\n\n<p>In addition, between 122,000 and 290,000 properties are estimated to be in areas at risk of groundwater flooding. This may include properties also in areas at risk of surface water flooding.</p>\n\n<p>Overall, this means around 5.5 million homes and businesses in England are at risk from flooding.</p>\n\n<p>We assess risk using flood modelling and mapping to understand the likelihood of flooding at national and local levels. We developed our current National Flood Risk Assessment (<abbr title=\"National Flood Risk Assessment\">NaFRA</abbr>) in the early 2000s. It provides risk information on flooding from rivers and the sea.</p>\n\n<p>We are developing a new National Flood Risk Assessment (<abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr>).</p>\n\n<p>We will publish a ‘National assessment of flood and coastal erosion risk in England 2024’ report in December 2024. This will use our new <abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr> data and our updated National Coastal Erosion Risk Map (<abbr title=\"National Coastal Erosion Risk Mapping\">NCERM</abbr>).</p>\n\n<p>Following this we expect to publish the new <abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr> data in early 2025.</p>\n\n<h3 id=\"investment-in-fcerm\">3.2 Investment in <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr>\n</h3>\n\n<div class=\"call-to-action\">\n  <p>The finance figures included in this report may change subject to the completion of the <abbr title=\"National Audit Office\">NAO</abbr> audit of the Environment Agency’s Annual Report and Accounts. This is due in October 2024. We will update the report once the audit has finished.</p>\n</div>\n\n<p>The current 6-year programme of <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects runs from 1 April 2021 to 31 March 2027. April 2023 to March 2024 is the third year of this programme.</p>\n\n<p>This year 28,920 properties have benefited from better protection from flooding and coastal erosion. Within this total, other <abbr title=\"Risk Management Authorities\">RMAs</abbr> have carried out works that better protect 10,650 properties.</p>\n\n<p>Over 88,000 properties have benefited from better protection since April 2021.</p>\n\n<p>Between April 2023 and March 2024, government invested £864 million of capital funding in <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr>.</p>\n\n<p>This includes spend on:</p>\n\n<ul>\n  <li>projects in 2023 to 2024 that better protect properties</li>\n  <li>the development of future projects</li>\n  <li>the <a href=\"https://www.gov.uk/guidance/flood-and-coastal-resilience-innovation-programme\">flood and coastal resilience innovation programme</a>\n</li>\n</ul>\n\n<p>This means you should not directly compare overall spend with the number of properties protected in the same year.</p>\n\n<p>Of this £864 million, £119 million was spent by other <abbr title=\"Risk Management Authorities\">RMAs</abbr> on <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects. Other <abbr title=\"Risk Management Authorities\">RMAs</abbr> have also spent £11 million of local levy funding. Local levy funding is spent on local priority flood and coastal erosion projects. It is managed by <abbr title=\"Regional Flood and Coastal Committees\">RFCCs</abbr>.</p>\n\n<p>Funding for <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects is allocated through the application of government’s partnership funding policy.</p>\n\n<p>We review the programme of <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects each year to make sure that we:</p>\n\n<ul>\n  <li>get the best value for money</li>\n  <li>better protect as many properties as possible</li>\n  <li>invest in priority areas where the risk is highest</li>\n</ul>\n\n<p>Table 4: <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> capital investment from 1 April 2023 to 31 March 2024</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Type of funding</th>\n      <th scope=\"col\">Investment (£ millions)</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">Central government</th>\n      <td>864</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Local levy (EA &amp; other <abbr title=\"Risk Management Authority\">RMA</abbr>)</th>\n      <td>31</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Funding from other sources</th>\n      <td>23</td>\n    </tr>\n  </tbody>\n</table>\n\n<p>Government funding is used to reduce flood and coastal erosion risk across all regions of the country. We do not have any regional investment targets. All schemes are carefully assessed to make sure they benefit the most people and property.</p>\n\n<p>Table 5: government investment and properties protected in <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> by Environment Agency area from 1 April 2023 to 31 March 2024 in £ millions</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">EA Area</th>\n      <th scope=\"col\">2023 to 2024 (£ millions)</th>\n      <th scope=\"col\">Properties better protected</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">East Midlands</th>\n      <td>26</td>\n      <td>140</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">West Midlands</th>\n      <td>37</td>\n      <td>3,220</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Lincolnshire and Northamptonshire</th>\n      <td>73</td>\n      <td>3,290</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">East Anglia</th>\n      <td>93</td>\n      <td>830</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Northeast</th>\n      <td>25</td>\n      <td>400</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Yorkshire</th>\n      <td>70</td>\n      <td>1,880</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Greater Manchester, Merseyside, and Cheshire</th>\n      <td>26</td>\n      <td>1,190</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Cumbria and Lancashire</th>\n      <td>71</td>\n      <td>2,080</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Devon, Cornwall, and the Isles of Scilly</th>\n      <td>46</td>\n      <td>380</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Wessex</th>\n      <td>86</td>\n      <td>2,400</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Solent and South Downs</th>\n      <td>73</td>\n      <td>5,370</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Kent, South London and East Sussex</th>\n      <td>85</td>\n      <td>7,450</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Thames</th>\n      <td>37</td>\n      <td>110</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Hertfordshire and North London</th>\n      <td>17</td>\n      <td>180</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Nationally led capital</th>\n      <td>99</td>\n      <td>-</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">TOTAL</th>\n      <td>864</td>\n      <td>28,920</td>\n    </tr>\n  </tbody>\n</table>\n\n<p>Government funding has helped benefit areas of higher socio-economic deprivation across the country. Areas of deprivation are measured using the indices of multiple deprivation.</p>\n\n<p>Between April 2023 and March 2024 <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> work better protected:</p>\n\n<ul>\n  <li>6,940 (24% of the 2023 to 2024 total) properties in the highest socio-economically deprived areas in England (0 to 20% index of multiple deprivation)</li>\n  <li>9,830 (34% of the 2023 to 2024 total) properties in the next highest socio-economically deprived areas (20 to 40% index of multiple deprivation)</li>\n</ul>\n\n<h4 id=\"other-benefits-of-fcerm-investment\">3.2.1 Other benefits of <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> investment</h4>\n\n<p>The focus of our current investment programme is to better protect properties from flooding and coastal change.</p>\n\n<p>However, our investment programme will also provide other benefits to support local businesses, communities and economic growth.</p>\n\n<p>Table 6 shows the flood risk reduction benefits our work provides to:</p>\n\n<ul>\n  <li>agricultural land</li>\n  <li>roads</li>\n  <li>rail</li>\n</ul>\n\n<p>Table 6: other benefits of <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> investment from 1 April 2021 to 31 March 2024</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Type of benefit</th>\n      <th scope=\"col\">2021 to 2022</th>\n      <th scope=\"col\">2022 to 2023</th>\n      <th scope=\"col\">2023 to 2024</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">Agricultural land (ha)</th>\n      <td>28,000</td>\n      <td>127,000</td>\n      <td>7,000</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Roads (km)</th>\n      <td>1,500</td>\n      <td>700</td>\n      <td>500</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Rail (km)</th>\n      <td>90</td>\n      <td>130</td>\n      <td>75</td>\n    </tr>\n  </tbody>\n</table>\n\n<h4 id=\"significant-projects-completed\">3.2.2 Significant projects completed</h4>\n\n<p>Between April 2023 and March 2024, we worked with other <abbr title=\"Risk Management Authorities\">RMAs</abbr> to better protect 28,921 properties from flooding and coastal erosion through around 135 <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> capital projects.</p>\n\n<p>These projects better protected people and properties from:</p>\n\n<ul>\n  <li>sea and tidal flooding (15,719 properties from 29 projects)</li>\n  <li>river flooding (7,575 properties from 60 projects)</li>\n  <li>surface water flooding (927 properties from 39 projects)</li>\n  <li>coastal erosion (4,700 properties from 7 projects)</li>\n</ul>\n\n<p>A project can provide improved protection from more than one source of flooding. The number of properties protected by a project depends on the size of the project and the type of flooding it is providing protection from. For example, surface water projects are often lower cost and provide protection to fewer properties. </p>\n\n<div class=\"call-to-action\">\n  <h4 id=\"case-study-1---perry-barr-and-witton-and-bromford-and-castle-vale-schemes\">Case Study 1 - Perry Barr and Witton and Bromford and Castle Vale schemes</h4>\n\n  <p>The Perry Barr and Witton and the Bromford and Castle Vale areas are in north and north-east parts of central Birmingham. Both areas have a history of flooding from the River Tame. Both were badly affected by flooding in 2007.</p>\n\n  <p>The 2 projects together better protect nearly 2,500 properties:</p>\n\n  <ul>\n    <li>Perry Barr and Witton – 1,790 properties</li>\n    <li>Bromford and Castle Vale – 703 properties</li>\n  </ul>\n\n  <p>Perry Barr and Witton is a £50 million scheme that was completed in the summer of 2023. The work included the construction of a new flood storage reservoir at Forge Mill in the Sandwell Valley Country Park. This site is upstream of Perry Barr and Witton communities. It works by capturing excess water from the River Tame during times of heavy rainfall. </p>\n\n  <p>The new reservoir can store 1.7 million cubic metres of water, the equivalent of 680 Olympic swimming pools. </p>\n\n  <p>The scheme also includes: </p>\n\n  <ul>\n    <li>new flood walls</li>\n    <li>flood gates  </li>\n    <li>flow conveyance improvements from Brookvale Road in Witton, down to Gravelly Park Industrial Estate in Aston</li>\n  </ul>\n\n  <p>The project is supported by Birmingham City Council and Sandwell Council. </p>\n\n  <p>The Bromford and Castle Vale project cost around £17 million and was also completed in 2023. It reduces the risk of flooding to residential and commercial properties and infrastructure.</p>\n\n  <p>The scheme includes: </p>\n\n  <ul>\n    <li>a series of earth embankments </li>\n    <li>a low-level flood wall along the left bank of the River Tame </li>\n  </ul>\n\n  <p>Each section of flood wall was made using a type of lower carbon concrete which reduced the carbon footprint of each wall section by 35%. </p>\n</div>\n\n<h4 id=\"partnership-funding\">3.2.3 Partnership funding</h4>\n\n<p>Funding for <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects is allocated in line with government <a href=\"https://www.gov.uk/government/publications/calculate-gia-funding-for-fcerm-projects-2020\">partnership funding policy</a>. The amount of funding a project is allocated depends on the damages avoided because of the project plus the benefits it will provide.</p>\n\n<p>This is based on 4 measures:</p>\n\n<ul>\n  <li>the overall benefits provided by a project less those valued under the other measures listed below – this could include damages avoided to hospitals, farms or transport infrastructure</li>\n  <li>households moved from one category of flood risk to a lower category</li>\n  <li>households better protected against coastal erosion</li>\n  <li>environmental benefits provided through <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> activities</li>\n</ul>\n\n<p>Some projects will be fully funded by <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> GIA, while others will need partnership funding contributions to go ahead. These contributions usually come from those benefiting from the project, including:</p>\n\n<ul>\n  <li>local partners</li>\n  <li>the local community</li>\n  <li>other organisations or businesses</li>\n</ul>\n\n<p>Partnership funding contributions allow more communities to benefit from local <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> measures than could be funded directly by central government alone.</p>\n\n<p>Table 7: Partnership funding spent between April 2021 and March 2024 on projects better protecting properties in 2021 to 2027 programme</p>\n\n<table>\n  <thead>\n    <tr>\n      <td></td>\n      <th scope=\"col\">2021 to 2022</th>\n      <th scope=\"col\">2022 to 2023</th>\n      <th scope=\"col\">2023 to 2024</th>\n      <th scope=\"col\">Total</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">Partnership funding spent</th>\n      <td>£52 million</td>\n      <td>£53 million</td>\n      <td>£85 million</td>\n      <td>£190 million</td>\n    </tr>\n  </tbody>\n</table>\n\n<h4 id=\"asset-management\">3.2.4 Asset management</h4>\n\n<p>There are around 245,000 assets that have a <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> purpose in England. Just over 240,000 manage risk from flooding. The remainder manage coastal erosion risk.</p>\n\n<p>Of the flood risk management assets:</p>\n\n<ul>\n  <li>around 160,000 are third party assets maintained by riparian owners who own the land next to the river – 96,000 of these are in high consequence systems</li>\n  <li>around 80,000 are managed by the Environment Agency – 38,000 of these are in high consequence systems</li>\n</ul>\n\n<p>High consequence systems are those where the assets protect a high concentration of properties. A system is where several different types of flood defences work together to reduce risk and better protect an area.</p>\n\n<p>We allocated £197.4 million towards maintaining <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> assets between April 2023 and March 2024.</p>\n\n<p>This investment includes:</p>\n\n<ul>\n  <li>inspecting assets and checking that they are operational</li>\n  <li>clearing weeds and debris from assets to help ensure the free flow of water</li>\n  <li>protecting embankments from erosion</li>\n  <li>maintaining assets that support the free movement of eels and fish along watercourses</li>\n  <li>clearing assets of invasive non-native species (<abbr title=\"invasive non-native species\">INNS</abbr>) which can harm other species, damage habitats and increase flood risk</li>\n</ul>\n\n<p>The Environment Agency inspects and reports on 195,000 flood risk management assets. This includes our own and third-party assets. We inspect all flood risk assets that work together to protect people and property.</p>\n\n<p>We do not maintain third party assets. However many are part of our schemes and connected to assets we do maintain. It is important we inspect and monitor these to understand their condition. This makes sure of the performance of the overall flood risk management system. We work with the third parties to make sure they are maintained and operated when required.</p>\n\n<p>Inspection frequency is based on risk and varies from 6 months to 5 years. This means not all assets are inspected each year. At the start of 2023 we planned to carry out 107,000 inspections. Since the October 2023 storms we have carried out an extra 68,000 inspections to check the condition of our assets.</p>\n\n<p>On 31st March 2024, 92.6% of our flood risk assets in high consequence systems were in the required condition.</p>\n\n<p>Our long-term aim, with the appropriate level of investment, is for 98% of our high consequence assets to be at their required condition.</p>\n\n<p>We publish details of planned maintenance activities in the <a href=\"https://www.gov.uk/government/publications/river-and-coastal-maintenance-programme\">river and coastal maintenance programme</a>.</p>\n\n<h3 id=\"public-sector-cooperation-agreements\">3.3 Public sector cooperation agreements</h3>\n\n<p>The <a rel=\"external\" href=\"https://www.legislation.gov.uk/ukpga/2010/29/contents\"><abbr title=\"Flood and Water Management Act\">FWMA</abbr></a> requires <abbr title=\"Risk Management Authorities\">RMAs</abbr> to cooperate with each other when carrying out <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> activities. <abbr title=\"Risk Management Authorities\">RMAs</abbr> should work together to provide flood risk maintenance and other activities.</p>\n\n<p>One example of partnership working is through public sector cooperation agreements (<abbr title=\"Public Sector Cooperation Agreements\">PSCAs</abbr>). These allow 2 public sector bodies to set out how they will work together to achieve public tasks of mutual benefit. The benefits of partnership working are well established.</p>\n\n<p>We use <abbr title=\"Public Sector Cooperation Agreements\">PSCAs</abbr> for a wide variety of work including:</p>\n\n<ul>\n  <li>routine maintenance</li>\n  <li>small improvement works</li>\n  <li>incident response</li>\n</ul>\n\n<p>Table 8: summary of Environment Agency <abbr title=\"Public Sector Cooperation Agreements\">PSCAs</abbr> on 31 March 2024</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Risk Management Authority</th>\n      <th scope=\"col\">Number of <abbr title=\"Public Sector Cooperation Agreements\">PSCAs</abbr> in place</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">Internal drainage boards</th>\n      <td>36</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Lead local flood authorities</th>\n      <td>3</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Navigation authorities</th>\n      <td>3</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Total</th>\n      <td>42</td>\n    </tr>\n  </tbody>\n</table>\n\n<h3 id=\"efficiency-savings\">3.4 Efficiency savings</h3>\n\n<p>We report to government about the efficiencies achieved through our <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> investment programme. This is so that we achieve the best possible value for the investment of government funds.</p>\n\n<p>We can achieve efficiencies through:</p>\n\n<ul>\n  <li>national initiatives that allow operational improvements</li>\n  <li>project specific activities</li>\n</ul>\n\n<p>Savings are achieved through:</p>\n\n<ul>\n  <li>innovation</li>\n  <li>value engineering</li>\n  <li>longer-term planning and packaging of work</li>\n</ul>\n\n<p>We aim to achieve 10% efficiencies in the current investment programme. These efficiencies are then reinvested in our investment programme.</p>\n\n<p>Between April 2023 and March 2024, we achieved £46 million in efficiency savings. We have done this mainly by using different contract methods to gain greater value and risk sharing from our supply chain.</p>\n\n<p>Efficiencies vary from year to year.</p>\n\n<p>They depend on:</p>\n\n<ul>\n  <li>the <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> funding allocation for that year</li>\n  <li>individual project completion dates</li>\n</ul>\n\n<div class=\"call-to-action\">\n  <h4 id=\"case-study-2southsea-coastal-scheme\">Case Study 2: Southsea Coastal Scheme </h4>\n\n  <p>The Southsea Coastal Scheme is a flood defence project across 4.5 km of Southsea seafront in Portsmouth. The aim of the scheme is to:</p>\n\n  <ul>\n    <li>better protect households, business and other buildings from flooding for the next 100 years</li>\n    <li>take into account climate change</li>\n    <li>improve urban public spaces</li>\n  </ul>\n\n  <p>Southsea Castle is approximately 700m of coastal frontage located in the centre of the scheme. This is one of the most exposed peninsulas.</p>\n\n  <p>The original design included a steep rock revetment laid directly over the existing sea defences. However, a project review identified the opportunity to refine the design which significantly reduced the overall rock volume needed.</p>\n\n  <p>This resulted in an efficiency saving of £4.2 million. </p>\n</div>\n\n<h2 id=\"fcerm-strategy-ambition-1---climate-resilient-places\">4. <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> strategy ambition 1 - climate resilient places</h2>\n\n<p>This section explains how <abbr title=\"Risk Management Authorities\">RMAs</abbr> are working together to increase resilience to flooding and coastal change, both now and in the future.</p>\n\n<h3 id=\"climate-change\">4.1 Climate change</h3>\n\n<p>Our climate is changing, sea levels are rising, and we are experiencing more extreme weather. We are already seeing these changes.</p>\n\n<p>Long term records show that in the UK:</p>\n\n<ul>\n  <li>temperatures are rising</li>\n  <li>more rainfall in winter is falling in intense rainfall events</li>\n  <li>sea levels are rising more rapidly than in the past</li>\n</ul>\n\n<p>The scale of potential future flooding and coastal change is significant. 1 in 6 people are already at risk of flooding from rivers and the sea. The risks will only increase with rising sea levels, more frequent and severe floods and storm surges.</p>\n\n<p>There are 2 main ways we can tackle climate change:</p>\n\n<ul>\n  <li>mitigation – reducing or limiting the effects of greenhouse gases to reduce the impacts of a changing climate</li>\n  <li>adaptation – changing lifestyles, economy, and infrastructure to adapt to the unavoidable impacts of climate change</li>\n</ul>\n\n<p>We need to prepare for the changes that are already happening. We need to take greater action to both mitigate and adapt to minimise risks from climate change.</p>\n\n<p>The climate of the future depends on the actions we take now.</p>\n\n<h4 id=\"mitigation\">4.1.1 Mitigation</h4>\n\n<p>In May 2021 the Environment Agency set out our plan to achieve net zero by reducing emissions by 45% and offsetting the remaining 55%.</p>\n\n<p>Since then, net zero science has continued to mature. This has led to a revised net zero definition by the Science Based Targets initiative (<abbr title=\"science based targets initiative\">SBTi</abbr>).</p>\n\n<p>Therefore, in January 2024, we published an <a href=\"https://www.gov.uk/government/publications/environment-agency-reaching-net-zero/environment-agency-reaching-net-zero-update-january-2024\">update to our net zero goal</a>. In this, we have committed to increase our emissions reduction target to 90% between 2045 and 2050.</p>\n\n<p>In <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr>, we remain committed to our pledge to reduce emissions by 45% by 2030. We have continued our work to achieve this, including:</p>\n\n<ul>\n  <li>cross-sector collaboration to reduce carbon in our infrastructure - for example, we have made low carbon concrete a minimum requirement and business cases for any new flood schemes must contain a carbon assessment</li>\n  <li>working on new innovations – for example low carbon steel reinforcement bar alternatives and using modelling to minimise the embedded carbon of our infrastructure schemes by design</li>\n</ul>\n\n<p>We have also reduced our direct operational emissions by more than a third since 2019 by:</p>\n\n<ul>\n  <li>switching a significant portion of our fleet to electric</li>\n  <li>reducing the amount we travel</li>\n  <li>investing in more efficient infrastructure</li>\n</ul>\n\n<p>We have an action plan to support our net zero road map. This contains 92 actions which we track and report progress on every quarter.</p>\n\n<p>In 2019 our work on <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects accounted for around 54% of our corporate carbon emissions. This was the equivalent of around 148,000t <abbr title=\"Carbon Dioxide Equivalent\">CO2e</abbr>.</p>\n\n<p>Investment in <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects has doubled since the last programme (2015 to 2021). This increase comes with an increased potential for more emissions. Currently we estimate that our emissions from our construction are greater than 70% of our overall carbon footprint.</p>\n\n<p>However, our flood risk management projects also avoid using carbon. We estimate that 268,000t <abbr title=\"Carbon Dioxide Equivalent\">CO2e</abbr> of carbon will be avoided through the operational life of <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects completed between April 2021 and March 2023. This is through properties not flooding and livelihoods being protected.</p>\n\n<p>We continue to prioritise reducing carbon during the construction of our flood risk management projects. The choices we make about the construction materials we use are very important.</p>\n\n<p>For example, over 80% of our carbon emissions from construction are contained in materials we use such as concrete and steel. To reduce this, we have changed our technical requirements for suppliers. We now specify low carbon concrete by default where suitable.</p>\n\n<div class=\"call-to-action\">\n  <h4 id=\"case-study-3-bridgewater-tidal-barrier-scheme\">Case study 3: Bridgewater Tidal Barrier Scheme</h4>\n\n  <p>The Bridgwater Tidal Barrier (<abbr title=\"Bridgwater Tidal Barrier\">BTB</abbr>) Scheme is a £100 million Environment Agency project to protect 13,000 homes and businesses from tidal flooding. The scheme design company was awarded funding from our net zero carbon innovation pathway fund 2022 to 2023.</p>\n\n  <p>This allowed them to trial their ‘Building Information Modelling (<abbr title=\"building information modelling\">BIM</abbr>) Analytics – Carbon’ workflow on the tidal barrier design.</p>\n\n  <p>This technology:</p>\n\n  <ul>\n    <li>integrates sustainability into <abbr title=\"building information modelling\">BIM</abbr>\n</li>\n    <li>connects people, data and technology to support decision-making</li>\n    <li>minimises the embodied carbon</li>\n  </ul>\n\n  <p>We’re on track to achieve a 50% reduction in embodied carbon for the tidal barrier structure on the <abbr title=\"Bridgwater Tidal Barrier\">BTB</abbr> Scheme. This is around 8,000 tCO2e.</p>\n\n  <p>Integrating sustainability with <abbr title=\"building information modelling\">BIM</abbr> provides a range of additional benefits including:</p>\n\n  <ul>\n    <li>encouraging carbon management behaviours through its regular use in carbon workshops</li>\n    <li>analysing and accurately reporting embodied carbon with real-time carbon visualisations through data</li>\n    <li>providing an audit trail of carbon changes through comments log</li>\n    <li>providing learning and testing for the integration of carbon data within our Data Requirements Library and Carbon Calculator tool</li>\n  </ul>\n\n  <p>Following this trial, we have provided more innovation funding to expand the use of the tool to the whole <abbr title=\"Bridgwater Tidal Barrier\">BTB</abbr> project to the end of detailed design.</p>\n</div>\n\n<h4 id=\"adaptation-and-resilience\">4.1.2 Adaptation and resilience</h4>\n\n<p>We are planning for a 2˚C global temperature increase by 2100 in our <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy</a>. However, it is also important that we prepare for more extreme scenarios of climate change and assess a range of climate impacts. This will make sure our approach to <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> can adapt to a range of climate futures.</p>\n\n<p>We’re doing this in both our <a href=\"https://www.gov.uk/guidance/flood-risk-assessments-climate-change-allowances\">planning advice for new developments</a> and for the <a href=\"https://www.gov.uk/guidance/flood-and-coastal-risk-projects-schemes-and-strategies-climate-change-allowances\">design of new <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects, schemes and strategies</a>. Our guidance reflects the latest climate science.</p>\n\n<p>Guidance for <abbr title=\"Risk Management Authorities\">RMAs</abbr> on how to account for climate change in <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> projects, schemes and strategies fits with our <a href=\"https://www.gov.uk/guidance/partnership-funding-for-fcerm-projects\">partnership funding</a> and <a href=\"https://www.gov.uk/guidance/fcerm-appraisal-guidance\">appraisal guidance</a>.</p>\n\n<h4 id=\"flood-and-coastal-innovation-programmes-fcip\">Flood and coastal innovation programmes (FCIP)</h4>\n\n<p>We manage the <a href=\"https://www.gov.uk/guidance/flood-and-coastal-resilience-innovation-programme\">Flood and coastal innovation programmes</a> funded by Defra. This encourages innovation in flood and coastal resilience and adaptation to a changing climate. We’re investing £200 million to test and develop new ways to create a nation resilient to flooding and coastal change.</p>\n\n<p>We’re doing this across three programmes:</p>\n\n<ul>\n  <li>Flood and coastal resilience innovation programme</li>\n  <li>Adaptive pathways programme</li>\n  <li>Coastal transition accelerator programme</li>\n</ul>\n\n<h4 id=\"flood-and-coastal-resilience-innovation-programme-fcrip\">Flood and Coastal Resilience Innovation Programme (FCRIP)</h4>\n\n<p>£150 million of the <a href=\"https://www.gov.uk/guidance/flood-and-coastal-resilience-innovation-programme\">FCIP</a> funding is being used to develop 25 projects. In March 2021, government <a href=\"https://www.gov.uk/government/news/innovative-projects-to-protect-against-flooding-selected\">announced the 25 projects selected</a>. These projects are led by local authorities with support from us.</p>\n\n<p>Each project will show how practical innovative actions can help to improve resilience to flooding and coastal erosion. They will do this by developing, testing, and implementing resilience actions that are outside the scope of what central government usually funds.</p>\n\n<p>The 25 projects include:</p>\n\n<ul>\n  <li>projects piloting property flood resilience (<abbr title=\"Property Flood Resilience\">PFR</abbr>) to reduce the impacts of groundwater flooding</li>\n  <li>developing nature-based solutions with rural land managers to improve resilience to floods and drought</li>\n  <li>developing surface water flood warnings for remote communities</li>\n  <li>creating new habitat to increase shoreline resilience and better protect local coastal economies</li>\n  <li>trialling new and innovative financing to improve flood and coastal resilience and adaptation to coastal change</li>\n</ul>\n\n<p>The programme will share evidence and learning to inform future approaches to, and investments in <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr>.</p>\n\n<p>We are working with Defra on an evaluation of the 25 projects.</p>\n\n<div class=\"call-to-action\">\n  <h4 id=\"case-study-4-reclaim-the-rain\">Case study 4: Reclaim the Rain</h4>\n\n  <p>The Reclaim the Rain project is led by Suffolk and Norfolk County Councils. It is investigating creative solutions for capturing floodwater which can then be reused for agriculture when there is too little water. The project will reduce flood risk and also benefit agriculture by improving water security for food production.</p>\n\n  <p>The project team are working with large scale food producers to identify where flood water can be stored upstream to reduce flood risk to downstream communities.</p>\n\n  <p>The learning from this innovation project will be used to identify:</p>\n\n  <ul>\n    <li>what works</li>\n    <li>what doesn’t work</li>\n    <li>how the approach could be replicated in future</li>\n  </ul>\n</div>\n\n<h4 id=\"adaptive-pathways-programme-app\">Adaptive Pathways Programme (APP)</h4>\n\n<p>£8 million of the <a href=\"https://www.gov.uk/guidance/flood-and-coastal-resilience-innovation-programme\">FCIP</a> funding is being used to develop adaptation pathway plans for managing flooding and coastal change to 2100 and beyond.</p>\n\n<p>The plans cover strategic locations including the:</p>\n\n<ul>\n  <li>Thames Estuary</li>\n  <li>Humber Estuary</li>\n  <li>River Severn</li>\n</ul>\n\n<p>They also include 2 locations in Yorkshire:</p>\n\n<ul>\n  <li>a catchment scale project in South Yorkshire</li>\n  <li>a community scale surface water project in West Yorkshire</li>\n</ul>\n\n<p>We will work with partners to develop and explore:</p>\n\n<ul>\n  <li>different resilience actions – these could help to better plan for, protect, respond to, and recover from flooding and coastal change over pathways to 2100 and beyond</li>\n  <li>local land use and development choices – these could allow for more flood and climate resilient places</li>\n  <li>better coordination of planning and investment cycles with infrastructure and utilities – these could unlock investment in flood resilient infrastructure and services</li>\n  <li>integrated water level management – which could improve flood and coastal resilience whilst also enhancing water quality and the natural environment</li>\n</ul>\n\n<p>These will help us achieve:</p>\n\n<ul>\n  <li>the maximum benefit for people and places at the right time</li>\n  <li>strategic objectives and measures in the <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy</a>\n</li>\n</ul>\n\n<p>We have developed an <a rel=\"external\" href=\"https://engageenvironmentagency.uk.engagementhq.com/adaptation-pathway-programme\">adaptation pathway knowledge hub</a> which contains information and tools to help <abbr title=\"Risk Management Authorities\">RMAs</abbr> develop adaptation pathways.</p>\n\n<h4 id=\"coastal-transition-accelerator-programme-1\">4.1.2.3 Coastal Transition Accelerator Programme</h4>\n\n<p>£36 million of the FCIP funding is being used for the <a href=\"https://www.gov.uk/government/news/communities-to-trial-innovative-ways-of-adapting-to-coastal-erosion\">Coastal Transition Accelerator Programme</a>. This will:</p>\n\n<ul>\n  <li>trial opportunities to transition and adapt to the impacts of coastal erosion</li>\n  <li>cover 5 coastal areas at significant risk of coastal erosion</li>\n  <li>cover the coastal areas with property most at risk of significant coastal erosion in the next 20 years</li>\n  <li>produce an adaptation plan</li>\n  <li>created practical actions that will support the long-term resilience of coastal communities and transition away from areas of coastal change</li>\n</ul>\n\n<p>North Norfolk District Council and East Riding of Yorkshire Council were selected to receive £30 million of the funding to progress phase 1 of the project. This is because data shows up to 80% of the homes at risk in the next 20 years are within those 2 areas.</p>\n\n<p>The <a href=\"https://www.gov.uk/government/news/coastal-adaptation-projects-in-south-west-england-to-receive-6m-in-funding\">£6 million of additional funding</a> for phase 2 of the project will help support communities at risk of coastal erosion in the South West to transition and adapt to climate change. This is for projects in Bude in Cornwall and Charmouth and Swanage in Dorset.</p>\n\n<p>The councils will work with residents, businesses and asset owners to prepare for the long term through:</p>\n\n<ul>\n  <li>rolling back property and facilities at short term risk of coastal erosion</li>\n  <li>improving and replacing damaged community infrastructure such as steps and ramps to the beach</li>\n  <li>repurposing land where property has been removed for community and nature benefit</li>\n  <li>trialling innovative moveable buildings</li>\n  <li>working with planners and the financial sector to develop mechanisms and tools to support future adaptation and prevent inappropriate development in places at risk</li>\n</ul>\n\n<p>The programme will run from 2022 to 2027 in East Riding of Yorkshire and North Norfolk and from 2024 to 2027 in Bude, Charmouth and Swanage.</p>\n\n<p>We will share lessons from the programme with other coastal <abbr title=\"Risk Management Authorities\">RMAs</abbr> through existing groups, networks and workshops as required.</p>\n\n<h3 id=\"coastal-change\">4.2 Coastal change</h3>\n\n<p>The <a rel=\"external\" href=\"https://environment.maps.arcgis.com/apps/webappviewer/index.html?id=9cef4a084bbb4954b970cd35b099d94c\"><abbr title=\"National Coastal Erosion Risk Mapping\">NCERM</abbr></a> shows that about 2,000 properties are at risk of being lost to coastal erosion by 2060. This assumes all current <abbr title=\"Shoreline Management Plan\">SMP</abbr> approaches and actions are carried out.</p>\n\n<p>We are currently updating our national coastal erosion predictions.</p>\n\n<p>During 2023 to 2024 we have:</p>\n\n<ul>\n  <li>used new climate change research to model the impacts of climate change on erosion</li>\n  <li>completed extensive data checks and draft output reviews with over 80 local authorities along the English coast</li>\n</ul>\n\n<p>Coast protection authorities (<abbr title=\"Coast Protection Authorities\">CPAs</abbr>) lead on coastal erosion management. They have permissive powers, which allow them to carry out <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> works.</p>\n\n<p>Some <abbr title=\"Coast Protection Authorities\">CPAs</abbr> in England use <abbr title=\"National Coastal Erosion Risk Mapping\">NCERM</abbr> to develop local planning mechanisms. These include coastal change management area (<abbr title=\"coastal change management areas\">CCMAs</abbr>).</p>\n\n<p>These mechanisms:</p>\n\n<ul>\n  <li>ensure new development takes account of the changing coast</li>\n  <li>support the transition of communities and infrastructure away from areas at risk of coastal erosion</li>\n</ul>\n\n<p>We will be publishing the updated <abbr title=\"National Coastal Erosion Risk Mapping\">NCERM</abbr> in December 2024. This will be included in the ‘National assessment of flood and coastal erosion risk in England 2024’ report alongside the new national flood risk assessment (<abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr>).</p>\n\n<h4 id=\"shoreline-management-plans\">4.2.1 Shoreline management plans</h4>\n\n<p><abbr title=\"Shoreline Management Plans\">SMPs</abbr> set out the local approach to managing coastal flood and erosion risk into the next century. They identify the most sustainable management approach for each stretch of coastline in England.</p>\n\n<p>The management approaches cover the:</p>\n\n<ul>\n  <li>short-term (0 to 20 years)</li>\n  <li>medium term (20 to 50 years)</li>\n  <li>long-term (50 to 100 years)</li>\n</ul>\n\n<p><abbr title=\"Coast Protection Authorities\">CPAs</abbr> and other important stakeholders have led the development of <abbr title=\"Shoreline Management Plans\">SMPs</abbr>. This was done in 7 regional coastal groups across England, producing 20 <abbr title=\"Shoreline Management Plans\">SMPs</abbr>.</p>\n\n<p>We have worked with coastal authorities to refresh and update <abbr title=\"Shoreline Management Plans\">SMPs</abbr>. This work has made sure <abbr title=\"Shoreline Management Plans\">SMPs</abbr> are fit for purpose and continue to steer planning and investment decisions at the coast.</p>\n\n<p>Through 2024 and beyond, coastal groups and <abbr title=\"Shoreline Management Plan\">SMP</abbr> groups will be focusing on implementing the updated action plans.</p>\n\n<h4 id=\"shoreline-management-plan-explorer\"> 4.2.1.1 Shoreline Management Plan Explorer</h4>\n\n<p>On 30 January 2024, we launched the <abbr title=\"Shoreline Management Plan\">SMP</abbr> Explorer. This new <a href=\"https://www.gov.uk/guidance/shoreline-management-plans\">map-based digital tool</a> makes plans for coastal management:</p>\n\n<ul>\n  <li>easier to find, access and understand</li>\n  <li>more useful for coastal practitioners and the public</li>\n</ul>\n\n<p><a rel=\"external\" href=\"https://environment.data.gov.uk/shoreline-planning\"><abbr title=\"Shoreline Management Plan\">SMP</abbr> Explorer</a> will also improve our ability to monitor and assure <abbr title=\"Shoreline Management Plans\">SMPs</abbr> and the actions being taken to manage our changing coast.  </p>\n\n<p>We will add new content regularly so the tool is up-to-date. This will include an improved <abbr title=\"National Coastal Erosion Risk Mapping\">NCERM</abbr> in December 2024.  </p>\n\n<p>We also commissioned an independent peer review to assess the state of <abbr title=\"Shoreline Management Plans\">SMPs</abbr> and identify where further improvements can be made. The peer review panel was made up of 6 coastal experts including representatives from local government and academia.</p>\n\n<p>The <a href=\"https://www.gov.uk/government/publications/shoreline-management-plans-independent-peer-review\">peer review report</a> provides an objective view of how the updated <abbr title=\"Shoreline Management Plans\">SMPs</abbr> contribute to the <a href=\"https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\">National Flood and Coastal Erosion Risk Management Strategy</a>.</p>\n\n<h4 id=\"coastal-habitats\">4.2.2 Coastal habitats</h4>\n\n<p>We work with other <abbr title=\"Risk Management Authorities\">RMAs</abbr> to find opportunities to reduce flood and coastal erosion risk through nature-based solutions. These are solutions that also create or enhance coastal habitats.</p>\n\n<p>This can include:</p>\n\n<ul>\n  <li>working with natural processes</li>\n  <li>natural flood management, for example saltmarshes</li>\n  <li>making space for wildlife by incorporating appropriate features into the design of FCRM projects</li>\n</ul>\n\n<p><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> activities can also contribute to the loss of or reduction in the quality of protected coastal habitat. Most losses happen due to <a href=\"https://www.gov.uk/flood-and-coastal-erosion-risk-management-research-reports/what-is-coastal-squeeze#:~:text=Coastal%20squeeze%20is%20now%20defined,conjunction%20with%20other%20coastal%20processes.\">coastal squeeze</a>. This is where flood and coastal erosion defences prevent the natural landward migration of intertidal habitats in response to sea level rise.</p>\n\n<p>To meet our legal obligations, we create new habitat to replace what is lost due to coastal squeeze. We do this through the Habitat Compensation and Restoration Programme (<abbr title=\"Habitat Compensation and Restoration Programme\">HCRP</abbr>). This carries out large-scale habitat creation projects, for example Steart Marshes in Somerset.</p>\n\n<p>Overall, compensatory habitat created by the <abbr title=\"Habitat Compensation and Restoration Programme\">HCRP</abbr> since the early 2000’s has successfully kept pace with losses. The <abbr title=\"Habitat Compensation and Restoration Programme\">HCRP</abbr> creates:</p>\n\n<ul>\n  <li>intertidal saltmarsh and mudflats</li>\n  <li>freshwater and other coastal habitats</li>\n</ul>\n\n<h4 id=\"intertidal-saltmarsh-and-mudflats\">4.2.3 Intertidal saltmarsh and mudflats</h4>\n\n<p>Intertidal habitat includes saltmarsh and mudflats. Our knowledge of saltmarsh restoration and the benefits that this brings has improved significantly over time.</p>\n\n<p>Saltmarshes can:</p>\n\n<ul>\n  <li>reduce coastal flood and erosion risk</li>\n  <li>store carbon</li>\n  <li>filter out excess nutrients</li>\n  <li>support fisheries</li>\n  <li>provide health and well-being benefits</li>\n</ul>\n\n<p>In total, the <abbr title=\"Habitat Compensation and Restoration Programme\">HCRP</abbr> has created 1,601 hectares of intertidal habitat.</p>\n\n<h4 id=\"freshwater-and-other-coastal-habitats\">4.2.4 Freshwater and other coastal habitats</h4>\n\n<p>Other protected habitats may be lost due to coastal change and <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> activities. These habitats include:</p>\n\n<ul>\n  <li>reed beds</li>\n  <li>coastal grazing marsh</li>\n  <li>saline lagoons</li>\n  <li>vegetated shingle</li>\n</ul>\n\n<p>The loss of these habitats can also be caused by coastal squeeze. Where this happens, we replace the habitat that is lost.</p>\n\n<p>Since the early 2000’s, the <abbr title=\"Habitat Compensation and Restoration Programme\">HCRP</abbr> has created:</p>\n\n<ul>\n  <li>468 hectares of freshwater habitats</li>\n  <li>292 hectares of other coastal habitats</li>\n</ul>\n\n<p>Most of these coastal habitats have been created on the east and south-east coasts.</p>\n\n<h3 id=\"natural-flood-management\">4.3 Natural flood management</h3>\n\n<p>Nature-based solutions have an important contribution to play in achieving climate resilient places.</p>\n\n<p><abbr title=\"Natural Flood Management\">NFM</abbr> describes interventions that reduce flood risk by using natural techniques. <abbr title=\"Natural Flood Management\">NFM</abbr> can manage flood and coastal erosion risk by protecting, restoring and emulating the natural processes of:</p>\n\n<ul>\n  <li>catchments</li>\n  <li>rivers</li>\n  <li>floodplains</li>\n  <li>coasts </li>\n</ul>\n\n<p><abbr title=\"Natural Flood Management\">NFM</abbr> also provides a range of wider benefits, including:</p>\n\n<ul>\n  <li>carbon capture</li>\n  <li>increasing and improving habitats and biodiversity</li>\n  <li>increasing water quality</li>\n  <li>improving water resources</li>\n  <li>improving health and wellbeing</li>\n</ul>\n\n<p>There are 14 different <abbr title=\"Natural Flood Management\">NFM</abbr> measures described in the <a href=\"https://www.gov.uk/flood-and-coastal-erosion-risk-management-research-reports/working-with-natural-processes-to-reduce-flood-risk\">working with natural processes evidence directory</a> that was published in 2017.</p>\n\n<p>These measures include:</p>\n\n<ul>\n  <li>river and floodplain restoration</li>\n  <li>leaky barriers</li>\n  <li>offline storage areas</li>\n  <li>targeted woodland planting</li>\n  <li>soil and land management</li>\n</ul>\n\n<p>We can better manage flood risk for communities by using a combination of nature-based solutions and engineered flood and coastal defences.</p>\n\n<h4 id=\"nfm-programme\">\n<abbr title=\"Natural Flood Management\">NFM</abbr> Programme</h4>\n\n<p>The new £25 million <abbr title=\"Natural Flood Management\">NFM</abbr> Programme launched in September 2023.</p>\n\n<p>It aims to:</p>\n\n<ul>\n  <li>reduce local flood risk using <abbr title=\"Natural Flood Management\">NFM</abbr>\n</li>\n  <li>provide wider benefits to the environment, nature, and society</li>\n  <li>accelerate new and existing opportunities for <abbr title=\"Natural Flood Management\">NFM</abbr> delivery and financing</li>\n  <li>further improve evidence of <abbr title=\"Natural Flood Management\">NFM</abbr> by filling knowledge gaps</li>\n</ul>\n\n<p>The 40 successful packages of work were announced by ministers in February 2024. They will be carried out by a range of stakeholders including:</p>\n\n<ul>\n  <li>landowners</li>\n  <li>farmers</li>\n  <li>risk management authorities</li>\n  <li>non-governmental organisations (NGOs)</li>\n  <li>other community organisations</li>\n</ul>\n\n<p>The projects will carry out a mixture of <abbr title=\"Natural Flood Management\">NFM</abbr> measures at a range of scales and across a variety of communities and landscapes.</p>\n\n<p>These projects have now started the project development stage to write full business cases by September 2024.</p>\n\n<p>During this time, they will:</p>\n\n<ul>\n  <li>refine their designs</li>\n  <li>strengthen partnerships</li>\n  <li>progress landowner agreements</li>\n  <li>define their cost estimates</li>\n</ul>\n\n<p>They will also install monitoring equipment. This will help collect baseline data to meet the <abbr title=\"Natural Flood Management\">NFM</abbr> monitoring requirements. We will analyse this data centrally.</p>\n\n<p>We are also responsible for managing aspects of the <abbr title=\"Natural Flood Management\">NFM</abbr> Programme and supporting projects through the development phase. What we learn from the <abbr title=\"Natural Flood Management\">NFM</abbr> Programme will help us to mainstream <abbr title=\"Natural Flood Management\">NFM</abbr>.</p>\n\n<p>The programme will build on and embed learning from the £15 million <abbr title=\"Natural Flood Management\">NFM</abbr> Pilot Programme. This programme, managed by the Environment Agency, supported 60 projects between 2017 and 2021.</p>\n\n<h4 id=\"mainstream-the-use-of-natural-flood-management\">Mainstream the use of natural flood management</h4>\n\n<p>We want people and places to make greater use of nature-based solutions to enhance flood and coast resilience and nature recovery.</p>\n\n<p>This ambition is reflected in the aims of the:</p>\n\n<ul>\n  <li>National <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy for England</li>\n  <li>\n<abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy Roadmap to 2026</li>\n</ul>\n\n<p>At present there are:</p>\n\n<ul>\n  <li>94 projects in the 40 <abbr title=\"Natural Flood Management\">NFM</abbr> programme packages of work</li>\n  <li>15 FCIP projects that include <abbr title=\"Natural Flood Management\">NFM</abbr> measures</li>\n  <li>around 70 <abbr title=\"Natural Flood Management\">NFM</abbr> projects in the £5.6 billion flood and coastal defence programme, which use <abbr title=\"Natural Flood Management\">NFM</abbr> in combination with traditional civil engineering approaches to reduce flood risk</li>\n</ul>\n\n<p>We are also carrying out a range of work to develop support <abbr title=\"Natural Flood Management\">NFM</abbr> projects including:</p>\n\n<ul>\n  <li>streamlining business cases</li>\n  <li>a new grant mechanism for non-<abbr title=\"Risk Management Authorities\">RMAs</abbr>\n</li>\n  <li>work on a nationally consistent <abbr title=\"Natural Flood Management\">NFM</abbr> benefits tool</li>\n  <li>the development of a heat map to help target future investment</li>\n  <li>an update to the Working with Natural Processes Evidence Directory</li>\n  <li>improvements to the <abbr title=\"Natural Flood Management\">NFM</abbr> hub in collaboration with the Rivers Trust</li>\n</ul>\n\n<h3 id=\"improving-the-environment\">4.4 Improving the environment</h3>\n\n<p>We work with other <abbr title=\"Risk Management Authorities\">RMAs</abbr> to look for opportunities to create and improve habitat as part of our <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> work. We also form partnerships with groups such as wildlife and rivers trusts.</p>\n\n<p>Between April 2021 and March 2024 we have:</p>\n\n<ul>\n  <li>created or enhanced 2,530 hectares of habitat</li>\n  <li>enhanced 189 kilometres of rivers</li>\n</ul>\n\n<p>Examples of these improvements include:</p>\n\n<ul>\n  <li>removing or modifying weirs to make it easier for fish to migrate upstream</li>\n  <li>implementing nature-based flood solutions that create and/or restore habitat and reduce flood risk downstream</li>\n</ul>\n\n<div class=\"call-to-action\">\n  <h4 id=\"case-study-5-tamar-estuary-habitat-creation-program-south-hooe\">Case Study 5: Tamar estuary habitat creation program (South Hooe)</h4>\n\n  <p>The Tamar Valley is an area of outstanding natural beauty. It is a rare valley and water landscape that provides a unique wildlife resource.</p>\n\n  <p>South Hooe is a small peninsula in Devon, within a bend of the River Tamar. It is next to and includes part of the Tamar Tavy Estuaries Site of Special Scientific Interest (SSSI) and other environmental designations.</p>\n\n  <p>The Tamar estuary habitat creation programme (South Hooe) aims to restore the natural landscape of the area. We have worked closely with stakeholders including:</p>\n\n  <ul>\n    <li>the landowner</li>\n    <li>Tamar Valley Area of Outstanding Natural Beauty (AONB)</li>\n    <li>Natural England </li>\n  </ul>\n\n  <p>The project cost £1.7 million and was completed in October 2023. The work has created 14 hectares of intertidal habitat and 4 hectares of wetlands. These will provide habitat for many notable bird species including:</p>\n\n  <ul>\n    <li>little egret</li>\n    <li>kingfisher</li>\n    <li>snipe</li>\n    <li>teal</li>\n    <li>green sandpiper</li>\n    <li>reed bunting</li>\n    <li>avocet</li>\n    <li>water rail</li>\n  </ul>\n\n  <p>It will also provide suitable habitat for invertebrates and notable plant species.</p>\n</div>\n\n<h3 id=\"strategic-planning-flood-risk-management-plans\">4.5  Strategic planning: flood risk management plans</h3>\n\n<p>Flood risk management plans (<abbr title=\"Flood Risk Management Plans\">FRMPs</abbr>) set out how organisations, stakeholders and communities will work together to manage flood risk in England. They cover flooding from rivers, sea and surface water.</p>\n\n<p>They also help achieve the ambitions of the National <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy.</p>\n\n<p>Future requirements to develop Flood Risk Management Plans no longer apply because of the Retained EU Law (Reform and Revocation) Act 2023.</p>\n\n<p>It has been just over a year since we published <abbr title=\"Flood Risk Management Plan\">FRMP</abbr> plans. We have made good progress carrying out the action in the <abbr title=\"Flood Risk Management Plans\">FRMPs</abbr> this year. Around half of all our measures have started and are ongoing. There are over 1,100 projects currently in progress. This number will continue to increase in 2024.</p>\n\n<p>Over the last year we have completed over 20 projects.</p>\n\n<p>Some of our successes include:</p>\n\n<ul>\n  <li>working with partners to install property resilience measures to reduce flood risk to over 400 homes that lie in the Thames Flood Risk Area</li>\n  <li>working with the community in Rewe to install a new flood warning gauge to raise awareness of flood risk and increase community flood resilience in the East Devon Management Catchment</li>\n  <li>improving the waterbody and its amenity value between Northampton and Peterborough in the Nene Catchment through The Nene Backwater Restoration project – this work also provided flood risk benefit</li>\n  <li>working with Mid Devon District Council to establish a Critical Drainage Area in Cullompton – this will make sure development proposals increase community flood resilience and allow sustainable growth in the area</li>\n  <li>carrying out a flood action campaign in Smallfield, Surrey to raise awareness of flooding and encourage residents to take action in the Thames Flood Risk Area</li>\n</ul>\n\n<h3 id=\"agriculture-and-land-management\">4.6 Agriculture and land management</h3>\n\n<p>Farming businesses in England were impacted by the prolonged wet weather over winter 2023 to 2024. There was exceptionally high rainfall across most parts of England with a particular concentration in mid and southern regions.</p>\n\n<p>These exceptionally high rainfall totals have been associated with 11 named storms including Storms Babet (October 2023) and Henk (January 2024). Catchments in eastern parts of England were particularly impacted. </p>\n\n<p>We are working with Defra on the design and launch of 3 Environmental Land Management (<abbr title=\"Environmental Land Management\">ELM</abbr>) schemes. This work will help to maximise the benefits for <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr>.</p>\n\n<p>The <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Strategy recognises the importance of agriculture and land management. It makes it clear farmers have a role in mitigating flood risk whilst increasing the resilience of their own farms.</p>\n\n<p>Between April 2023 and March 2024 we better protected around 7,000 hectares of Grade 1, 2 and 3 agricultural land from flooding. This work was carried out through the <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> investment programme.</p>\n\n<h4 id=\"catchment-sensitive-farming-csf\">4.6.1 Catchment Sensitive Farming (<abbr title=\"Catchment Sensitive Farming\">CSF</abbr>)</h4>\n\n<p>Catchment Sensitive Farming (<abbr title=\"Catchment Sensitive Farming\">CSF</abbr>) is a partnership programme. It was expanded in April 2022 to include providing advice on <abbr title=\"Natural Flood Management\">NFM</abbr> practices.</p>\n\n<p>In 2023, the Forestry Commission joined the partnership along with the existing organisations;</p>\n\n<ul>\n  <li>Natural England</li>\n  <li>Environment Agency</li>\n  <li>Defra</li>\n</ul>\n\n<p>This advice provided by Catchment Sensitive Farming Advisers (CSFAs) includes both established and expanded <abbr title=\"Catchment Sensitive Farming\">CSF</abbr> practices. These include:</p>\n\n<ul>\n  <li>soil management to improve infiltration</li>\n  <li>buffer strips to slow flow</li>\n  <li>run-off attenuation features to store and slowly release water</li>\n</ul>\n\n<p>CSFAs provide broad <abbr title=\"Natural Flood Management\">NFM</abbr> advice as well as focused support in partnership to projects which are likely to have the greatest impact. These projects are prioritised using a catchment-based, nationally guided and locally determined approach.</p>\n\n<p>We have worked with Natural England and the Forestry Commission to provide CSFAs with guidance and training courses. We have also carried out webinars to raise awareness of this work and encourage collaboration.</p>\n\n<p>We have developed an evaluation strategy to assess the uptake and impact of <abbr title=\"Natural Flood Management\">NFM</abbr> advice. The strategy builds on the established approach used in <a rel=\"external\" href=\"https://publications.naturalengland.org.uk/publication/4538826523672576\"><abbr title=\"Catchment Sensitive Farming\">CSF</abbr> Water Quality evaluation report</a>. It will collect information on:</p>\n\n<ul>\n  <li>outreach</li>\n  <li>implementation</li>\n  <li>barriers to uptake</li>\n  <li>farmer attitudes toward <abbr title=\"Natural Flood Management\">NFM</abbr> and flood risk</li>\n</ul>\n\n<p>In total, CSFAs have contributed to more than 50 <abbr title=\"Natural Flood Management\">NFM</abbr> projects across England. They have worked with more than 50 partner organisations, including:</p>\n\n<ul>\n  <li>the Environment Agency</li>\n  <li>local flood authorities</li>\n  <li>environmental non-governmental organisations (<abbr title=\"environmental non-governmental organisations\">eNGOs</abbr>)</li>\n  <li>universities</li>\n</ul>\n\n<p>Contributions vary across the projects but include:</p>\n\n<ul>\n  <li>providing targeted farm advice</li>\n  <li>joint farm visits</li>\n  <li>support for catchment sensitive specific options to benefit flood risk management</li>\n  <li>engagement events</li>\n  <li>contributing to project steering groups</li>\n</ul>\n\n<p>This includes <abbr title=\"Catchment Sensitive Farming\">CSF</abbr> <abbr title=\"Natural Flood Management\">NFM</abbr> advice to 3 FCIP projects:</p>\n\n<ul>\n  <li><a rel=\"external\" href=\"https://engageenvironmentagency.uk.engagementhq.com/cub005-cifr\">Cumbria innovative flood resilience (CiFR)</a></li>\n  <li><a rel=\"external\" href=\"https://www.devon.gov.uk/drip/\">Devon resilience innovation programme (DRIP)</a></li>\n  <li><a rel=\"external\" href=\"https://www.ousewem.co.uk/\">Ousewem</a></li>\n</ul>\n\n<p>Between April 2023 and March 2024, CSFAs have provided one-to-one <abbr title=\"Natural Flood Management\">NFM</abbr> advice more than 1,500 times to over 800 holdings.</p>\n\n<p>Since <abbr title=\"Catchment Sensitive Farming\">CSF</abbr> expanded its scope to include <abbr title=\"Natural Flood Management\">NFM</abbr> advice in April 2022, it has provided this advice one-to-one more than 3,000 times to more than 1,500 holdings.</p>\n\n<h2 id=\"ambition-2--todays-growth-and-infrastructure-resilient-in-tomorrows-climate\">5. Ambition 2 – today’s growth and infrastructure resilient in tomorrow’s climate</h2>\n\n<p>This ambition is about making the right investment and planning decisions to secure sustainable growth and environmental improvements. It also supports infrastructure resilient to flooding and coastal change.</p>\n\n<h3 id=\"promoting-safe-development-resilient-to-flooding-and-coastal-change\">5.1 Promoting safe development resilient to flooding and coastal change</h3>\n\n<p>Our <a href=\"https://www.gov.uk/government/publications/flood-and-coastal-risk-management-in-england-long-term-investment/long-term-investment-scenarios-ltis-2019#development-on-the-flood-plain\">long term investment scenarios</a> predict that the number of homes in the floodplain will almost double over the next 50 years.</p>\n\n<p>Climate change will also increase the:</p>\n\n<ul>\n  <li>size of flood risk areas</li>\n  <li>frequency and severity of flooding</li>\n  <li>complexity of the flood risk issues needing to be tackled</li>\n</ul>\n\n<p>Spatial planning helps us minimise the flood damages that these trends could cause. The <a href=\"https://www.gov.uk/government/publications/national-planning-policy-framework--2\"><abbr title=\"National Planning Policy Framework\">NPPF</abbr></a> makes it clear that we should avoid inappropriate development in areas at risk of flooding.</p>\n\n<p>Development that takes place in flood risk areas should:</p>\n\n<ul>\n  <li>be designed to be safe throughout its lifetime</li>\n  <li>not increase flood risk elsewhere</li>\n</ul>\n\n<p>Development design should be flood resistant and resilient. This will minimise flood damage and speed up recovery in the event of flooding.</p>\n\n<p>We have an important role as a statutory planning advisor to local planning authorities (<abbr title=\"Local Planning Authorities\">LPAs</abbr>). We support sustainable development by engaging with, and advising, developers and planners. By doing this, we help to support sustainable growth in the right places.</p>\n\n<p>Investing in flood risk planning advice makes good economic sense. For every £1 we spend providing advice, around £12 of future flood damages are avoided.</p>\n\n<p>We comment on development proposals:</p>\n\n<ul>\n  <li>in areas that are currently at medium or high risk of flooding from rivers and the sea</li>\n  <li>in areas with critical drainage problems</li>\n  <li>within 20 metres of a main river</li>\n</ul>\n\n<p>We are not a statutory consultee:</p>\n\n<ul>\n  <li>on development in flood zone 1 which we expect to be at risk of flooding from rivers or the sea in the future</li>\n  <li>when proposed development could be at risk from other sources of flooding such as groundwater or surface water</li>\n</ul>\n\n<p><abbr title=\"Lead Local Flood Authorities\">LLFAs</abbr> are a statutory consultee on major development with surface water drainage.</p>\n\n<p>We respond to approximately 9,000 planning applications each year. We provide detailed flood risk advice for around 6,000 planning applications. We know our flood risk planning advice this year has helped to avoid at least 60,000 homes from being permitted in potentially unsafe ways or locations.</p>\n\n<p>Between April 2023 and March 2024:</p>\n\n<ul>\n  <li>over 96% of all planning decisions were in line with our advice on flood risk</li>\n  <li>over 99% of new homes proposed in planning applications complied with our advice on flood risk</li>\n  <li>we are aware of planning permissions for 89 homes that were granted against our advice on flood risk</li>\n</ul>\n\n<p>We record a sample of planning application outcomes. This:</p>\n\n<ul>\n  <li>gives us an overview of how effective our advice is</li>\n  <li>helps us focus our efforts on positively influencing development proposals</li>\n</ul>\n\n<p>We recorded decisions for 2,391 planning applications where we lodged flood risk objections. These cases totalled 67,553 homes overall. Between 1 April 2016 and 31 March 2024, we recorded the <abbr title=\"Local Planning Authority\">LPA</abbr>’s final decision for around 64% of the applications we objected to on flood risk grounds.</p>\n\n<p>We publish a <a href=\"https://www.gov.uk/government/publications/environment-agency-objections-to-planning-on-the-basis-of-flood-risk\">list of all applications where we’ve lodged initial objections on flood risk grounds</a>. Often, the issues are resolved before a final decision is made.</p>\n\n<p>Table 9: planning applications reviewed by the Environment Agency between 1 April 2023 to 31 March 2024</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Type of Action</th>\n      <th scope=\"col\">Total</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">Planning applications responded to</th>\n      <td>9,436</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Planning applications which required detailed flood risk advice</th>\n      <td>5,741</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Number of planning decisions recorded that related to flood risk objections</th>\n      <td>2,391</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Number of homes granted planning permission contrary to our flood risk advice</th>\n      <td>89</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Number of planning decisions recorded in line with our advice</th>\n      <td>2,312</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">Number of planning decisions made contrary to our flood risk advice</th>\n      <td>79</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">% of planning applications determined in line with our advice</th>\n      <td>Over 96%</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">% of residential properties in planning applications in line with our advice</th>\n      <td>Over 99%</td>\n    </tr>\n  </tbody>\n</table>\n\n<h4 id=\"planning-policy-guidance-and-research\">5.1.1 Planning policy, guidance and research</h4>\n\n<p>This year, we have continued our work with the <a rel=\"external\" href=\"https://tcpa.org.uk/\">Town and Country Planning Association</a> (TCPA) to provide training for local authority planners.</p>\n\n<p>This includes:</p>\n\n<ul>\n  <li>piloting face-to-face training for planning policy officers in the Winchester area in July 2023</li>\n  <li>providing two training webinars to an audience of over 1,100 local planning authority officers in October 2023 - these sessions explained <a rel=\"external\" href=\"https://www.tcpa.org.uk/event/planning-for-flood-risk-webinar-applying-the-sequential-and-exception-tests-to-planning-applications/\">application of the sequential and exception tests to individual planning applications</a> and set out best practice for undertaking <a rel=\"external\" href=\"https://www.tcpa.org.uk/resources/webinar-recording-flood-risk-assessments-for-planning-applications/\">site-specific flood risk assessment</a>\n</li>\n</ul>\n\n<p>We have also contributed to several <abbr title=\"Construction Industry Research and Information Association\">CIRIA</abbr> projects to support practitioners to provide sustainable drainage systems.</p>\n\n<p>These projects include:</p>\n\n<ul>\n  <li>\n<a rel=\"external\" href=\"https://www.ciria.org/CIRIA/Research/Project_proposals2/P3255%20-%20Getting%20SuDS%20right%20from%20the%20start.aspx\">getting sustainable urban drainage systems (SuDS) right from the start</a> – this aims to encourage consideration of SuDS at the earliest stage of land acquisition or assessment for inclusion in the local plan</li>\n  <li>producing a SuDS strategy template – this aims to help developers know what SuDS information should be included with planning applications</li>\n  <li>updates to the SuDS Manual – this will update the guidance to reflect the latest evidence and best practice and make it more accessible</li>\n</ul>\n\n<p>We remain a member of <abbr title=\"Construction Industry Research and Information Association\">CIRIA</abbr> Susdrain - a community that provides a range of resources for those involved in SuDS.</p>\n\n<p>These resources include:</p>\n\n<ul>\n  <li>tools such as the <a rel=\"external\" href=\"https://www.susdrain.org/resources/best.html\">Benefits Estimation Tool</a> (B£ST)</li>\n  <li>guidance such as the <a rel=\"external\" href=\"https://www.ciria.org/ItemDetail?iProductCode=C753F&amp;Category=FREEPUBS\">SuDS Manual</a>\n</li>\n  <li><a rel=\"external\" href=\"https://www.ciria.org/CIRIA/Training/forthcoming_training.aspx?hkey=b79d62a9-022f-410a-9e5c-911842c606d8\">training</a></li>\n  <li><a rel=\"external\" href=\"https://www.susdrain.org/case-studies/\">case studies</a></li>\n</ul>\n\n<p>We published new guidance on <a href=\"https://www.gov.uk/guidance/using-modelling-for-flood-risk-assessments\">using modelling for flood risk assessments</a> in December 2023. This guidance helps developers understand when to use hydrological and hydraulic modelling as part of a flood risk assessment. It also explains the expected standards.</p>\n\n<p>We supported the response to the Reinforced autoclaved aerated concrete (<abbr title=\"reinforced autoclave aerated concrete\">RAAC</abbr>) crisis. We provided flood risk advice on its <a href=\"https://www.gov.uk/government/publications/installing-temporary-buildings-on-school-sites-with-raac/installing-temporary-buildings-on-raac-affected-school-sites\">guidance</a> for the installation of temporary buildings on affected school sites.</p>\n\n<p>We responded to several public consultations related to flood risk and coastal change. These included:</p>\n\n<ul>\n  <li><a href=\"https://www.gov.uk/government/consultations/levelling-up-and-regeneration-bill-reforms-to-national-planning-policy/levelling-up-and-regeneration-bill-reforms-to-national-planning-policy\">Levelling-up and Regeneration Bill: reforms to national planning policy</a></li>\n  <li><a href=\"https://www.gov.uk/government/consultations/changes-to-various-permitted-development-rights-consultation\">Strengthening planning policy for brownfield development</a></li>\n  <li><a href=\"https://www.gov.uk/government/consultations/planning-for-new-energy-infrastructure-revisions-to-national-policy-statements\">Planning for new energy infrastructure: revisions to National Policy Statements</a></li>\n  <li><a href=\"https://www.gov.uk/government/consultations/environmental-outcomes-reports-a-new-approach-to-environmental-assessment\">Environmental Outcomes Reports: a new approach to environmental assessment</a></li>\n  <li><a href=\"https://www.gov.uk/government/consultations/operational-reforms-to-the-nationally-significant-infrastructure-project-consenting-process/outcome/operational-reforms-to-the-nationally-significant-infrastructure-projects-consenting-process-government-response\">Operational reforms to the nationally aignificant infrastructure projects consenting process</a></li>\n  <li><a href=\"https://www.gov.uk/government/consultations/approach-to-siting-new-nuclear-power-stations-beyond-2025\">Approach to siting new nuclear power stations beyond 2025</a></li>\n</ul>\n\n<h3 id=\"property-flood-resilience\">5.2 Property Flood Resilience</h3>\n\n<p>Just under 700 properties were better protected by <abbr title=\"Property Flood Resilience\">PFR</abbr> measures between April 2023 and March 2024.</p>\n\n<p>Between May and October 2023, we ran a joint <abbr title=\"Property Flood Resilience\">PFR</abbr> public awareness campaign alongside Flood Re. The aim of the <a rel=\"external\" href=\"https://www.floodre.co.uk/be-flood-smart/\">Be Flood Smart campaign</a> was to explain:</p>\n\n<ul>\n  <li>what <abbr title=\"Property Flood Resilience\">PFR</abbr> measures are</li>\n  <li>how they can help to reduce flood damage to homes</li>\n</ul>\n\n<p>The campaign included:</p>\n\n<ul>\n  <li>an online web portal          </li>\n  <li>\n<abbr title=\"Property Flood Resilience\">PFR</abbr> case studies</li>\n  <li>social media</li>\n</ul>\n\n<p>It reached over 10 million people.</p>\n\n<p>We <a rel=\"external\" href=\"https://environmentagency.blog.gov.uk/2023/09/28/improving-the-way-we-deliver-property-flood-resilience/\">launched new guidance</a> in September 2023 to help <abbr title=\"Risk Management Authorities\">RMAs</abbr> develop and appraise <abbr title=\"Property Flood Resilience\">PFR</abbr> projects. We developed this guidance in response to feedback on <abbr title=\"Property Flood Resilience\">PFR</abbr> projects.</p>\n\n<p>The guidance will help to:</p>\n\n<ul>\n  <li>streamline <abbr title=\"Property Flood Resilience\">PFR</abbr> projects</li>\n  <li>save time</li>\n  <li>avoid disproportionate project development costs</li>\n  <li>enable more <abbr title=\"Property Flood Resilience\">PFR</abbr> projects to be completed</li>\n  <li>improve the resilience of hundreds more properties to flooding</li>\n</ul>\n\n<p>It is available to all <abbr title=\"Risk Management Authorities\">RMAs</abbr> including:</p>\n\n<ul>\n  <li>local councils</li>\n  <li>water companies</li>\n  <li>internal drainage boards</li>\n</ul>\n\n<p>In December 2023, we launched a new supplier framework for <abbr title=\"Property Flood Resilience\">PFR</abbr> schemes. The framework can be accessed by <abbr title=\"Risk Management Authorities\">RMAs</abbr> in England. It will be used to provide survey and installation services for <abbr title=\"Property Flood Resilience\">PFR</abbr> projects for the next 4 years. This framework introduces new requirements for the quality of products used and installation following the industry led <a rel=\"external\" href=\"https://www.ciria.org/CIRIA/Resources/Free_publications/CoP_for_PFR_resource.aspx\"><abbr title=\"Property Flood Resilience\">PFR</abbr> Code of Practice</a>.</p>\n\n<h3 id=\"reservoir-safety\">5.3 Reservoir safety</h3>\n\n<p>We regulate large raised reservoirs (<abbr title=\"Large Raised Reservoirs\">LRRs</abbr>) in England. In April 2024, there were 2136 registered <abbr title=\"Large Raised Reservoirs\">LRRs</abbr>.</p>\n\n<p>This regulation is a requirement of the Reservoirs Act 1975, which aims to ensure that dams and reservoirs are safe. Flooding from reservoir dam failure, although rare, can be very serious, putting lives at risk. Responsibility for the safety of reservoirs lies with their undertakers who are the owners or operators of the reservoir. </p>\n\n<p>As the enforcement authority, we must make sure undertakers follow the legal safety requirements. We report on our enforcement action in our <a href=\"https://www.gov.uk/government/publications/reservoir-safety-biennial-report/biennial-report-on-reservoir-safety-1-january-2021-to-31-december-2022\">biennial report</a>.  </p>\n\n<p>Owners and operators must report incidents at <abbr title=\"Large Raised Reservoirs\">LRRs</abbr>. Reservoir owners have 12 months following an incident to provide a full and comprehensive post incident report. </p>\n\n<p>Seventeen incidents were reported to us between April 2023 and March 2024, an increase from 7 last year.</p>\n\n<ul>\n  <li>one incident was a Level 2 (serious) incident, which is where emergency measures are required - we did not need to intervene in our regulatory role</li>\n  <li>fifteen level 3 incidents occurred, which is when the undertaker takes precautionary measures</li>\n  <li>one was recorded as a non-reportable incident, where the definition of a formal incident was not met but the undertaker reported the incident to help share some of the learning from the event to the industry</li>\n</ul>\n\n<p>We are working on several <a rel=\"external\" href=\"https://consult.environment-agency.gov.uk/solent-and-south-downs/reservoir-safety-reform-programme/\">reservoir safety reform</a>s to strengthen and modernise reservoir safety management. We provide regular updates on our progress online. We have already made some changes including:</p>\n\n<ul>\n  <li>introducing emergency flood plans</li>\n  <li>updating and publishing flood maps for over 2000 large raised reservoirs</li>\n</ul>\n\n<p>This year we updated our guidance for:</p>\n\n<ul>\n  <li>inspecting engineers on inspections of high risk reservoirs</li>\n  <li>undertakers (owners and operators of reservoirs) on making sure they appoint different people for each of their reservoir engineer appointments.  </li>\n</ul>\n\n<p>We will continue to introduce non-legislative changes in 2024 and 2025.</p>\n\n<h3 id=\"surface-water-management\">5.4 Surface water management</h3>\n\n<p>Currently around 3.2 million properties in England are in areas at risk of surface water flooding. We know that this risk will increase over time due to climate change and population growth unless we act.</p>\n\n<p><abbr title=\"Lead Local Flood Authorities\">LLFAs</abbr> have the principal role in managing flood risk from local sources such as surface water, ground water and ordinary watercourses.</p>\n\n<p>The Environment Agency has a strategic overview role for all sources of flooding, which includes surface water. We show strategic leadership by playing an active role in supporting local authorities and other partners. We help them plan and adapt to current and future surface water flood risk.</p>\n\n<p>This year, we reaffirmed our commitment to actively and boldly working in this strategic leadership space. We are uniquely placed to take a convening role, working with government, local authorities and water companies to share best practice and to promote innovation.</p>\n\n<p>Between 2023 and 2024, we have:</p>\n\n<ul>\n  <li>produced a suite of tools and guidance to help local authorities and partners deliver surface water projects more easily - this includes simplifying and speeding up business case approvals and bespoke guidance on small projects such as <abbr title=\"Property Flood Resilience\">PFR</abbr> measures</li>\n  <li>co-hosted with the Met Office a national surface water risk roundtable on incident response – this brought together partners from national and local government and academia to discuss how we can be better prepared for this type of flooding</li>\n  <li>convened a surface water flood forecasting and real-time communication symposium – this brought together the surface water flood forecasting community to identify priorities and new opportunities for delivering high quality research, innovative and practical solutions in this challenging space</li>\n  <li>provided expert advice to inform <a href=\"https://www.gov.uk/government/publications/government-response-to-the-national-infrastructure-commissions-study-reducing-the-risk-of-surface-water-flooding\">the government response to</a> the Infrastructure Commission’s 2022 <a rel=\"external\" href=\"https://nic.org.uk/studies-reports/reducing-the-risks-of-surface-water-flooding/surface-water-flooding-final-report/\">reducing the risk of surface water flooding study</a>\n</li>\n  <li>worked with water companies, Ofwat and government to publish non-statutory Drainage and Wastewater Management Plans</li>\n</ul>\n\n<h3 id=\"flood-risk-activities--environmental-permitting\">5.5 Flood risk activities – environmental permitting</h3>\n\n<p>We regulate work on or near main rivers using <a href=\"https://www.gov.uk/topic/environmental-management/environmental-permits\">environmental permits</a>.</p>\n\n<p>Our aim is to ensure our customer’s journey is positive and they get their permits in a timely and organised manner. We issue permits within a statutory two-month determination period. Between April 2023 and March 2024, we issued 1,403 bespoke permits and 34 standard rules permits. There were also 1,171 registered exemptions.</p>\n\n<p>We continue to monitor and take enforcement action against unauthorised activity in rivers and floodplains. This can include illegal ground filling in the floodplain or taking material from within the river without the necessary permissions.</p>\n\n<p>We continue to improve our service, to ensure our customers and partners receive value for money. During this reporting period we:</p>\n\n<ul>\n  <li>reviewed the current demand for different types of activities within our rivers</li>\n  <li>worked on refining our risk based regulatory approach</li>\n</ul>\n\n<p>We continue to invest in digital and IT solutions to improve the service we provide to customers.</p>\n\n<h3 id=\"water-companies-contribution-to-reducing-risk\">5.6 Water companies’ contribution to reducing risk</h3>\n\n<p>Water and sewerage companies are risk management authorities. Water companies:</p>\n\n<ul>\n  <li>have a duty to maintain the water supply and sewer network</li>\n  <li>must make sure public sewers effectively drain the areas they serve - this includes draining surface water</li>\n  <li>manage the risk of flooding from their water main and sewer networks</li>\n</ul>\n\n<p>Between April 2023 and March 2024, water and sewerage companies have:</p>\n\n<ul>\n  <li>responded to flood incidents, including participating in multi-agency responses</li>\n  <li>worked with partners to reduce flood risk and deliver wider benefits for communities, including water quality and amenity benefits</li>\n  <li>used strategic partnerships, including with <abbr title=\"Regional Flood and Coastal Committees\">RFCCs</abbr>, to align investment planning and funding</li>\n  <li>finalised their Drainage and Wastewater Management Plans (<abbr title=\"Drainage and Wastewater Management Plans\">DWMPs</abbr>) and submitted their draft business plans to Ofwat in October 2023</li>\n  <li>engaged with local communities, including local flood action groups, schools, farmers and others</li>\n</ul>\n\n<p>Between April 2023 and March 2024, water companies invested:</p>\n\n<ul>\n  <li>£87.8 million to reduce the risk of sewer flooding to properties</li>\n  <li>£167.8 million to maintain the public sewer system to prevent blockages and flooding</li>\n  <li>£12.9 million in property-level protection and mitigation measures to reduce the likelihood of customers’ homes experiencing sewer flooding</li>\n</ul>\n\n<p>Winter 2023 to 2024 was one of the wettest on record for many areas of the country. Several water companies worked with other <abbr title=\"Risk Management Authorities\">RMAs</abbr> to mitigate flooding from multiple sources. They also improved their approach to incident management. Managing surface water flooding can mean fewer storm sewer overflows, which improves water quality.</p>\n\n<p>Water companies published their first <abbr title=\"Drainage and Wastewater Management Plans\">DWMPs</abbr> in May 2023. These plans help build a resilient drainage system. This is one way to manage surface water and reduce the chances of surface water flooding. Through the <abbr title=\"Drainage and Wastewater Management Plan\">DWMP</abbr> process, water companies have worked with stakeholders and developed collaborative approaches to align with other flood alleviation projects. They have also worked with Defra on the next cycle of <abbr title=\"Drainage and Wastewater Management Plans\">DWMPs</abbr>.</p>\n\n<p>There have been some good examples of partnership and integrated working this year. For example:</p>\n\n<ul>\n  <li>Wessex Water partnered with Somerset Council and Somerset Rivers Authority to produce an integrated catchment model of Minehead – this includes surface water, sewers and drainage channels, as well as watercourses and tide levels, and has resulted in a pipeline of integrated flood management projects</li>\n  <li>United Utilities worked with Bolton Council to install rain gardens and permeable surfaces at a new park in Bolton town centre – this will reduce surface water entering the sewer system</li>\n</ul>\n\n<p>Other innovative approaches this year include:</p>\n\n<ul>\n  <li>Southern Water installed additional sewer level monitors and temperature sensors to monitor infiltration and understand the relationship between groundwater and sewage, then used artificial intelligence to identify key points of infiltration</li>\n  <li>Yorkshire Water have engaged with communities using an interactive digital game that allows residents to design streets with SuDS – this helps to understand their preferences and concerns</li>\n  <li>South West Water have developed an ‘introductory course in catchment science and water quality’ for adult learners</li>\n</ul>\n\n<h2 id=\"ambition-3---a-nation-ready-to-respond-and-adapt-to-flooding-and-coastal-change\">6. Ambition 3 - a nation ready to respond and adapt to flooding and coastal change</h2>\n\n<p>This ambition is about ensuring local people understand:</p>\n\n<ul>\n  <li>their risk of flooding and coastal change</li>\n  <li>their responsibilities</li>\n  <li>how to take action</li>\n</ul>\n\n<h3 id=\"skills-and-capacity-in-llfas\">6.1 Skills and capacity in <abbr title=\"Lead Local Flood Authorities\">LLFAs</abbr>\n</h3>\n\n<p>Other Risk Management Authorities (<abbr title=\"Risk Management Authorities\">RMAs</abbr>) are delivering a large part of the £5.6 billion <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> investment programme. It is important that they (and their suppliers) have the capacity and capability to lead the projects that achieve this ambition.</p>\n\n<p>We are supporting them by:</p>\n\n<ul>\n  <li>streamlining processes</li>\n  <li>improving access to guidance, tools and training</li>\n</ul>\n\n<p>This means that projects are approved more quickly and can access grant-in-aid funding more easily.</p>\n\n<p>In April 2023 we launched the <a rel=\"external\" href=\"https://defra.sharepoint.com/sites/Community511/SitePages/D.aspx\">Supporting flood and coast projects</a> SharePoint site. This is for all practitioners as a ‘one-stop-shop’ for:</p>\n\n<ul>\n  <li>guidance</li>\n  <li>support</li>\n  <li>training</li>\n  <li>access to a community of practice</li>\n</ul>\n\n<p>This site has over 1,000 subscribers from over 300 different organisations.</p>\n\n<p>In June 2023 we launched improvements to simplify and strengthen project delivery, summarised in this short video.</p>\n\n<p>([Streamlining processes to secure government grants to build flood resilience projects (youtube.com)[https://www.youtube.com/watch?v=vW3RJ97jYUI].</p>\n\n<p>This focused on support for smaller projects, which make up most projects in the overall programme.</p>\n\n<p>It includes:</p>\n\n<ul>\n  <li>empowering local teams to assure and approve projects below £3 million </li>\n  <li>providing bespoke business case templates for different project types</li>\n  <li>simplifying the process to access funding for <a rel=\"external\" href=\"https://environmentagency.blog.gov.uk/2023/05/22/building-back-better-and-mainstreaming-property-flood-resilience/\">property flood resilience</a>\n</li>\n  <li>providing a more pragmatic approach to tackle flooding from multiple sources including surface water</li>\n</ul>\n\n<h3 id=\"using-digital-technology-to-warn-and-inform\">6.2 Using digital technology to warn and inform</h3>\n\n<p>The way we use digital technology continues to evolve. We have developed and improved our services in several ways, including:</p>\n\n<ul>\n  <li>how we warn the public about expected flooding through our flood warning service</li>\n  <li>our flood risk information services on GOV.UK</li>\n  <li>making our flood information available as open data</li>\n</ul>\n\n<h4 id=\"flood-warning-service\">6.2.1 Flood warning service</h4>\n\n<p>We have continued to improve our flood warning service based on user feedback. We focus on user-centred design and accessibility and have made several enhancements made during 2023.</p>\n\n<p>These have:</p>\n\n<ul>\n  <li>made the registration process easier</li>\n  <li>improved usability</li>\n  <li>made sure the service is accessible to all</li>\n</ul>\n\n<p>We’ve received positive feedback from users which shows the success of these improvements. Government now recognises sign up for Flood Warnings as a ‘Great’ service. This means it reaches a high, measurable standard of both efficiency and usability.</p>\n\n<p>We have completed the tender for the next warning service. This is to find a supplier to replace the current flood warning system by late 2025. We awarded the contact to Leidos, and their partners Intersec and Cogworx. Work started in early 2024.</p>\n\n<p>The new service will be a direct replacement of the legacy flood warning system when initially launched. Improvements will continue to be made for up to eight years. </p>\n\n<p>The next warning service will be:</p>\n\n<ul>\n  <li>user-centred</li>\n  <li>designed to inspire action</li>\n  <li>build resilience to flooding in a changing climate</li>\n  <li>a net zero digital solution</li>\n</ul>\n\n<p><a href=\"https://www.gov.uk/alerts\">Emergency Alerts</a>, which is a central government-led capability, has been operationally live since March 2023. It warns of risk to life from severe flooding from the rivers and sea.</p>\n\n<p>The pilot phase ended in March 2024 and the outcomes are now being evaluated.  We will continue to benefit from access to this capability in the short term.</p>\n\n<h4 id=\"flood-warnings-issued-and-number-of-properties-registered-for-them\">6.2.2 Flood warnings issued and number of properties registered for them</h4>\n\n<p>Being prepared helps reduce the impacts of flooding and enables faster recovery. We encourage people to register for our free <a href=\"https://www.gov.uk/sign-up-for-flood-warnings\">flood warning service</a>. Alerts and warnings enable the public to take action to protect themselves and their possessions.</p>\n\n<p>Our flood warning service covers:</p>\n\n<ul>\n  <li>flooding from rivers and the sea</li>\n  <li>some properties in areas at risk of groundwater flooding</li>\n</ul>\n\n<p>The flood warning service does not cover surface water flooding. This is because it can be difficult to predict:</p>\n\n<ul>\n  <li>where sudden rainstorms will occur</li>\n  <li>their intensity and duration</li>\n  <li>the effect the rain has on the ground</li>\n</ul>\n\n<p>Our <a href=\"https://www.gov.uk/government/publications/surface-water-management-action-plan\">surface water management action plan</a> includes an action to work with the Met Office to develop short range rapid forecasting. This would cover the type of rainfall that causes surface water flooding.</p>\n\n<p>As of March 2024, there were over 1.58 million properties registered to receive <a href=\"https://www.gov.uk/sign-up-for-flood-warnings\">free flood warnings</a>. This includes phone numbers registered in areas at risk from flooding that are automatically opted-in.</p>\n\n<h4 id=\"flood-alerts-flood-warnings-and-severe-flood-warnings-issued\">6.2.3 Flood alerts, flood warnings and severe flood warnings issued</h4>\n\n<p>Between April 2023 to March 2024, we issued:</p>\n\n<ul>\n  <li>5,126 flood alerts</li>\n  <li>2,613 flood warnings</li>\n  <li>7 severe flood warnings</li>\n</ul>\n\n<p>Find out <a rel=\"external\" href=\"https://check-for-flooding.service.gov.uk/\">what to do in a flood and what the different types of warnings mean.</a></p>\n\n<p>Table 10: number of flood alerts, flood warnings and severe flood warnings for the period 1 April 2023 to 31 March 2024</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Month and Year</th>\n      <th scope=\"col\">Number of Flood Alerts</th>\n      <th scope=\"col\">Number of Flood Warnings</th>\n      <th scope=\"col\">Number of Severe Flood Warnings</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">April 2023</th>\n      <td>121</td>\n      <td>28</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">May 2023</th>\n      <td>57</td>\n      <td>11</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">June 2023</th>\n      <td>91</td>\n      <td>14</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">July 2023</th>\n      <td>94</td>\n      <td>20</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">August 2023</th>\n      <td>161</td>\n      <td>21</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">September 2023</th>\n      <td>194</td>\n      <td>63</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">October 2023</th>\n      <td>682</td>\n      <td>654</td>\n      <td>5</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">November 2023</th>\n      <td>585</td>\n      <td>194</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">December 2023</th>\n      <td>972</td>\n      <td>335</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">January 2024</th>\n      <td>552</td>\n      <td>653</td>\n      <td>2</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">February 2024</th>\n      <td>1047</td>\n      <td>491</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">March 2024</th>\n      <td>570</td>\n      <td>129</td>\n      <td>0</td>\n    </tr>\n  </tbody>\n</table>\n\n<p>Table 11: comparison of flood alerts, flood warnings and severe flood warnings issued 1 April to 31 March each year between 2018 and 2024</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Years</th>\n      <th scope=\"col\">Number of flood alerts</th>\n      <th scope=\"col\">Number of flood warnings</th>\n      <th scope=\"col\">Number of severe flood warnings</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">2018 to 2019</th>\n      <td>1,844</td>\n      <td>366</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2019 to 2020</th>\n      <td>4,834</td>\n      <td>2,455</td>\n      <td>27</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2020 to 2021</th>\n      <td>2,843</td>\n      <td>1,176</td>\n      <td>10</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2021 to 2022</th>\n      <td>2,129</td>\n      <td>653</td>\n      <td>14</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2022 to 2023</th>\n      <td>2,473</td>\n      <td>547</td>\n      <td>0</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2023 to 2024</th>\n      <td>5,126</td>\n      <td>2,613</td>\n      <td>7</td>\n    </tr>\n  </tbody>\n</table>\n\n<h4 id=\"messages-sent\">6.2.4 Messages sent</h4>\n\n<p>Between April 2023 and March 2024 we sent over 12.5 million messages to the public, partners and the media. These messages informed them of flooding in their area and the flood warning service they can receive.</p>\n\n<p>This includes messages sent via text, email and automated telephone call.</p>\n\n<p>Table 12: number of messages sent for the period 1 April 2023 to 31 March 2024</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Month and year</th>\n      <th scope=\"col\">Total number of messages sent and attempts to send</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">April 2023</th>\n      <td>303,376</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">May 2023</th>\n      <td>149,782</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">June 2023</th>\n      <td>194,424</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">July 2023</th>\n      <td>301,406</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">August 2023</th>\n      <td>451,202</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">September 2023</th>\n      <td>616,107</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">October 2023</th>\n      <td>1,895,935</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">November 2023</th>\n      <td>1,200,581</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">December 2023</th>\n      <td>1,944,180</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">January 2024</th>\n      <td>2,000,140</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">February 2024</th>\n      <td>2,193,370</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">March 2024</th>\n      <td>1,288,715</td>\n    </tr>\n  </tbody>\n</table>\n\n<p>Table 13: comparison of messages sent 1 April to 31 March each year between 2018 and 2024</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Year</th>\n      <th scope=\"col\">Number of messages sent</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">2018 to 2019</th>\n      <td>2,987,759</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2019 to 2020</th>\n      <td>10,713,780</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2020 to 2021</th>\n      <td>6,882,140</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2021 to 2022</th>\n      <td>4,935,396</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2022 to 2023</th>\n      <td>4,741,047</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2023 to 2024</th>\n      <td>12,539,218</td>\n    </tr>\n  </tbody>\n</table>\n\n<h3 id=\"flood-risk-information-service\">6.3 Flood risk information service</h3>\n\n<p>Between April 2023 and March 2024, we continued to improve the 3 main flood risk information services on GOV.UK.</p>\n\n<p>These are:</p>\n\n<ul>\n  <li><a rel=\"external\" href=\"https://check-for-flooding.service.gov.uk/\">Check for flooding</a></li>\n  <li><a href=\"https://www.gov.uk/check-long-term-flood-risk\">Check your long term flood risk for an area in England</a></li>\n  <li><a rel=\"external\" href=\"https://flood-map-for-planning.service.gov.uk/\">Flood map for planning</a></li>\n</ul>\n\n<p>Table 14: Check for flooding service user totals each year from 1 January to 31 December between 2018 and 2023</p>\n\n<table>\n  <thead>\n    <tr>\n      <th scope=\"col\">Year</th>\n      <th scope=\"col\">Total number of users</th>\n      <th scope=\"col\">Total page views</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n      <th scope=\"row\">2018</th>\n      <td>1.6 million</td>\n      <td>18 million</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2019</th>\n      <td>5.0 million</td>\n      <td>48 million</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2020</th>\n      <td>6.2 million</td>\n      <td>65 million</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2021</th>\n      <td>3.2 million</td>\n      <td>37.3 million</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2022</th>\n      <td>794,000</td>\n      <td>8.7 million</td>\n    </tr>\n    <tr>\n      <th scope=\"row\">2023</th>\n      <td>1.2 million</td>\n      <td>33 million</td>\n    </tr>\n  </tbody>\n</table>\n\n<p>In March 2024 we launched a trial of our Floodline webchat service. This new service connects our digital front-end Check for flooding service to our existing assisted digital support team at Floodline.</p>\n\n<p>The purpose of this trial is to understand the current need and potential demand from users for a webchat. This will help define our future service offering. We will review user feedback to improve the service. We will also carry out operational reviews to define our future digital and assisted digital support channels.</p>\n\n<h3 id=\"fcerm-research-and-development-programme\">6.4 <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Research and Development Programme</h3>\n\n<p>The <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> Research and Development Programme is a collaborative partnership between:</p>\n\n<ul>\n  <li>the Environment Agency</li>\n  <li>Defra</li>\n  <li>Welsh Government</li>\n  <li>Natural Resources Wales</li>\n</ul>\n\n<p>The research is used to:  </p>\n\n<ul>\n  <li>understand and assess coastal and flood risks now and in the future  </li>\n  <li>manage flood and coastal erosion risk management assets in an efficient and sustainable way  </li>\n  <li>prepare for and manage flood events effectively  </li>\n  <li>increase resilience to flooding and coastal erosion </li>\n  <li>meet policy and practical needs</li>\n</ul>\n\n<p>This means that research is created and used to understand and manage flooding and coastal risks effectively in England and Wales. </p>\n\n<p>The <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> research and development programme:   </p>\n\n<ul>\n  <li>works with <abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> stakeholders to understand their needs and ensure research has a pathway to impact   </li>\n  <li>works with research funders, research institutes and leading academics to explore our greatest challenges  </li>\n  <li>carries out research and brings together evidence using our own expertise or by commissioning others  </li>\n  <li>translates research into practical advice for risk management authorities in England and Wales   </li>\n  <li>communicates research through the programme webpages <a href=\"https://www.gov.uk/government/organisations/flood-and-coastal-erosion-risk-management-research-and-development-programme\"><abbr title=\"Flood and Coastal Erosion Risk Management\">FCERM</abbr> research and development programme</a>, conference papers seminars, webinars and scientific journals   </li>\n</ul>\n\n<p>The research provides the evidence to support policy and practice in the partner organisations and flood and coastal risk management authorities.  This supports the FCRM Strategy Ambition 3. It also supports the Strategy Roadmap which says that world leading research and international best practice will underpin flood and coastal risk management.</p>\n\n<h3 id=\"research-publication-highlights\">6.5 Research publication highlights</h3>\n\n<h4 id=\"published-areas-of-research-interest\">6.5.1 Published areas of research interest</h4>\n\n<p>We work with universities, research councils and other partners to produce and access world leading research for the benefit of flood and coastal risk management.</p>\n\n<p>We committed to publishing a research plan by Spring 2024 to provide focus for our future research programmes and academic partnerships.  </p>\n\n<p>On 8 May, we published our <a href=\"https://www.gov.uk/government/publications/flood-and-coastal-erosion-risk-management-areas-of-research-interest/flood-and-coastal-erosion-risk-management-areas-of-research-interest\">areas of research interest</a> which will guide our research work until 2028. This lists the pressing research issues and outcomes we need to achieve. They are used as a consistent way across government to express to others where we want to collate existing research in certain topics. </p>\n\n<p>We will use the areas of research interest to:</p>\n\n<ul>\n  <li>concentrate our effort where research is needed most</li>\n  <li>determine the research activity we do</li>\n  <li>engage with the research community, industry partners and government</li>\n  <li>connect people who have the operational problems with researchers who have solutions</li>\n</ul>\n\n<h4 id=\"estimating-flood-peaks-and-hydrographs-in-small-catchments\">6.5.2 Estimating flood peaks and hydrographs in small catchments</h4>\n\n<p>In March 2023, we published research describing our <a href=\"https://www.gov.uk/flood-and-coastal-erosion-risk-management-research-reports/review-of-methodology-for-estimating-flood-peaks-and-hydrographs-for-small-catchments\">review of methods for estimating flood peaks and hydrographs in small catchments</a>.</p>\n\n<p>This work will help minimise uncertainties estimating the frequency of flooding, flood peaks, and hydrographs in small catchments.</p>\n\n<p>We worked with the UK Centre for Ecology and Hydrology and research partners to:</p>\n\n<ul>\n  <li>build an expanded data set of small catchments peak flow data</li>\n  <li>developed improved methods to model flood flows in small ungauged catchments and plots of land</li>\n</ul>\n\n<p>This information will be used by flood risk management authorities and developers when they design:</p>\n\n<ul>\n  <li>flood risk management assets</li>\n  <li>drainage systems</li>\n  <li>flood mitigation in new development</li>\n</ul>\n\n<h4 id=\"planning-for-the-risk-of-widespread-flooding\">6.5.3 Planning for the risk of widespread flooding</h4>\n\n<p>In March 2023, we published the Multivariate Event Modeller (<abbr title=\"multivariate event modeller\">MEM</abbr>) tool code on GitHub. This is an update to research undertaken in 2017 on <a href=\"https://www.gov.uk/flood-and-coastal-erosion-risk-management-research-reports/planning-for-the-risk-of-widespread-flooding\">planning for the risk of widespread flooding</a>.</p>\n\n<p>This work developed methods and guidance to address the need for realistic planning scenarios that account for the:</p>\n\n<ul>\n  <li>risk of widespread flooding across England and Wales</li>\n  <li>flooding from multiple sources (river, surface water and sea)</li>\n  <li>potential impacts of this flooding</li>\n</ul>\n\n<p>It enables central government, emergency planners and responders to review their:</p>\n\n<ul>\n  <li>planning assumptions</li>\n  <li>emergency response</li>\n  <li>mutual aid capabilities</li>\n</ul>\n\n<p>This will help to increase the England and Wales preparedness for widespread flooding.</p>\n\n<p>The <abbr title=\"multivariate event modeller\">MEM</abbr> tool update allows others to contribute to developing the code via the <a rel=\"external\" href=\"https://github.com/jbaconsulting/Multivariate-Event-Modeller\">GitHub repository</a>.</p>\n\n<h3 id=\"international-learning\">6.6 International learning </h3>\n\n<p>We continue to have strong links and good relationships with several international organisations and agencies: </p>\n\n<p>These include the: </p>\n\n<ul>\n  <li>Dutch flood agency, Rijkswaterstaat (<abbr title=\"Rijkswaterstaat\">RWS</abbr>) </li>\n  <li>Dutch regional water authority, Hoogheemraadschap Hollands Noorderkwartier </li>\n  <li>United States Army Corps of Engineers (USACE) </li>\n  <li>Australian Bureau of Meteorology </li>\n</ul>\n\n<p>We have worked with these organisations for many years, exchanging knowledge, research, innovations and technical expertise in flood and coastal risk management.  </p>\n\n<p>The topics and issues covered include: </p>\n\n<ul>\n  <li>flood assets </li>\n  <li>nature-based solutions </li>\n  <li>coastal processes </li>\n  <li>incident management and response </li>\n  <li>sustainability </li>\n</ul>\n\n<h4 id=\"international-engagement\">International Engagement</h4>\n\n<p>Our work with international partners includes development of early career engineers through the <a rel=\"external\" href=\"https://www.i-storm.org/initiatives/events/next-generation-kick-off-meeting\">I-Storm Next Generation group</a>.</p>\n\n<p>In April 2023 early career engineers from <abbr title=\"Rijkswaterstaat\">RWS</abbr> joined our graduate engineers in the Lake District to share knowledge and experience. This was followed by a joint visit to the Maeslant barrier’s annual test closure in September 2023. This was part of the <abbr title=\"Rijkswaterstaat\">RWS</abbr> 225th Anniversary events schedule. </p>\n\n<p>In 2023 we hosted a member of USACE on a 12-month technical exchange programme as part of our work with the Levee Safety Partnership. In July 2024 the second part of this exchange will begin. An Environment Agency technical lead will start a 12-month placement with USACE in the USA.  </p>\n\n<p>We hosted international partners, including a keynote speaker from the New South Wales State Emergency Service (Australia), at the annual Flood and Coast conference in June 2023.  </p>\n\n<p>In November 2023 a delegation of senior Environment Agency leaders attended the Rijkswaterstaat 225th Anniversary celebrations in the Netherlands. They gave a keynote speech and participated in workshops. </p>\n\n<p>Several international delegations visited the Thames Flood Barrier in 2023 and early 2024. These included:  </p>\n\n<ul>\n  <li>a delegation from Hong Kong in October 2023 - to share flood risk management knowledge and explore opportunities for future collaboration</li>\n  <li>an MSc student group from Sciences Po - Urban School, France in February 2024 - to find out more about our work towards climate adaptation in the Greater London Area</li>\n</ul>\n\n<p>We have participated in numerous international events between March 2023 and April 2024.</p>\n\n<p>We are continuing to develop our international network of contacts and strengthening relationships with our partners. Broadening the reach of our knowledge, experience, research, and innovations, will help us all better prepare, respond, and adapt to future flood and coastal risks.</p>\n\n<p>The Environment Agency has worked with leading international partners on an International Handbook on Emergency Responses for Flood Defences. This shares best practices to manage risks during extreme flood events. These include during:</p>\n\n<ul>\n  <li>preparedness</li>\n  <li>response</li>\n  <li>recovery</li>\n</ul>\n\n<h2 id=\"looking-ahead\">7. Looking ahead</h2>\n\n<p>This section lists some of the activities that we, government and other <abbr title=\"Risk Management Authorities\">RMAs</abbr> will be carrying out beyond March 2024.</p>\n\n<h4 id=\"national-flood-risk-assessment-nafra2\">National Flood Risk Assessment (<abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr>)</h4>\n\n<p>The Environment Agency is developing a new National Flood Risk Assessment (<abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr>).</p>\n\n<p>We will publish a “National assessment of flood and coastal erosion risk in England 2024’ report in December 2024. The report will identify national trends in terms of the source and characteristics of flood risk, the distribution of risk across England, and the potential for these to change in the future.</p>\n\n<p>Nafra2 will:</p>\n\n<ul>\n  <li>provide significant improvements including detail not currently available such as flood depth and climate change scenario information</li>\n  <li>form a new baseline assessment of flood risk in England including updated estimates of properties at risk and average anticipated economic impacts of flooding</li>\n</ul>\n\n<p>The <abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr> data will be published in early 2025.</p>\n\n<p>Following that, we plan regular updates and will use the capabilities of <abbr title=\"National Flood Risk Assessment 2\">NaFRA2</abbr> to help determine how flood risk is changing, including the impact of investment in flood resilience.</p>\n\n<h4 id=\"ncerm2\">NCERM2</h4>\n\n<p>We are currently updating the full National Coastal Erosion Risk Map (<abbr title=\"National Coastal Erosion Risk Mapping\">NCERM</abbr>) dataset based on a further 10 years of coastal monitoring data and the latest climate change evidence.</p>\n\n<p>The updated <abbr title=\"National Coastal Erosion Risk Mapping\">NCERM</abbr> will provide the best available information on coastal erosion risk. It will be used by coastal risk management authorities and the Environment Agency to inform coastal management investment and local planning decisions.</p>\n\n<p>We plan to:</p>\n\n<ul>\n  <li>publish a summary of the updated <abbr title=\"National Coastal Erosion Risk Mapping\">NCERM</abbr> data in the “National assessment of flood and coastal erosion risk in England 2024” report in December 2024.</li>\n  <li>at the same time, we will also publish the updated <abbr title=\"National Coastal Erosion Risk Mapping\">NCERM</abbr> on <a rel=\"external\" href=\"https://environment.data.gov.uk/shoreline-planning\"><abbr title=\"Shoreline Management Plan\">SMP</abbr> Explorer</a> in December 2024</li>\n</ul>\n\n<h4 id=\"section-19-guidance\">Section 19 Guidance</h4>\n\n<p>The 2020 Jenkins review outlined differences in:</p>\n\n<ul>\n  <li>\n<abbr title=\"Lead Local Flood Authority\">LLFA</abbr> flood investigation (section 19) report content</li>\n  <li>thresholds for triggering investigations</li>\n  <li>type of evidence being collated</li>\n</ul>\n\n<p>Defra is co-developing guidance, with users and <abbr title=\"Lead Local Flood Authority\">LLFA</abbr>, to bring more consistency to these reports, whilst preserving flexibility. The project will report in Autumn 2024.</p>\n\n<h4 id=\"review-of-flood-and-coastal-erosion-risk-management-assets\">Review of Flood and Coastal Erosion Risk Management Assets</h4>\n\n<p>The review of statutory powers and responsibilities to map, monitor, inspect and maintain all assets will be published in 2024. It covered coastal, fluvial, and surface water assets and examined riparian ownership. The aim was to make sure that responsibilities are clear and that there are effective powers in place.</p>\n\n<p>It covers challenges and opportunities. Defra will consider the findings and act where necessary.</p>\n\n<h4 id=\"rapid-flood-guidance-service\">Rapid flood guidance service</h4>\n\n<p>The Rapid Flood Guidance service is provided by the Flood Forecasting Centre.</p>\n\n<p>Rapid flooding is defined as any flooding:</p>\n\n<ul>\n  <li>that starts within 6 hours of rain</li>\n  <li>is caused by water getting trapped in urban low spots, overflowing drains, and flow from small streams and rivers</li>\n</ul>\n\n<p>The service will give short notice updates for England and Wales to supplement the Flood Guidance Statement (<abbr title=\"Flood guidance statement\">FGS</abbr>). It is aimed at responders who need to make decisions at a timescale of 0 to 6 hours.</p>\n\n<p>It will initially run as a trial service from 14 May 2024 to 30 September 2024.</p>\n\n<p>*TCPA]: Town and Country Planning Association\n*[USACE]: United States Army Corps of Engineers</p>\n</div>","first_published_version":false,"headers":[{"id":"executive-summary","level":2,"text":"1. Executive summary"},{"headers":[{"headers":[{"id":"storm-babet--18-to-21-october-2023","level":4,"text":"2.1.1 Storm Babet – 18 to 21 October 2023"},{"id":"storm-ciarn--1-to-3-november-2023","level":4,"text":"2.1.2 Storm Ciarán – 1 to 3 November 2023"},{"id":"storm-gerrit-27-to-28-december-2023-and-storm-henk-2-january-2024","level":4,"text":"2.1.3 Storm Gerrit (27 to 28 December 2023) and Storm Henk (2 January 2024)"},{"id":"recovery-activities","level":4,"text":"2.1.3 Recovery activities"},{"id":"record-of-past-flood-events","level":4,"text":"2.1.4 Record of past flood events"}],"id":"flooding-between-april-2023-and-march-2024","level":3,"text":"2.1 Flooding between April 2023 and March 2024"},{"headers":[{"id":"flood-and-coastal-erosion-risk-management-strategy-roadmap-to-2026","level":4,"text":"2.2.1 Flood and Coastal Erosion Risk Management Strategy Roadmap to 2026"}],"id":"national-flood-and-coastal-erosion-risk-management-strategy-for-england","level":3,"text":"2.2 National Flood and Coastal Erosion Risk Management Strategy for England"},{"headers":[{"id":"property-flood-resilience-repair-grant-scheme","level":4,"text":"Property flood resilience repair grant scheme"},{"id":"farming-recovery-fund","level":4,"text":"Farming recovery fund"},{"id":"frequently-flooded-allowance","level":4,"text":"Frequently flooded allowance"},{"id":"coastal-transition-accelerator-programme","level":4,"text":"Coastal transition accelerator programme"},{"id":"national-audit-office-and-public-accounts-committee-reports","level":4,"text":"National Audit Office and Public Accounts Committee reports"},{"id":"natural-flood-management-programme","level":4,"text":"Natural flood management programme"},{"id":"flood-risk-indicators","level":4,"text":"Flood risk indicators"}],"id":"changes-to-government-policy-and-announcements","level":3,"text":"2.3 Changes to government policy and announcements"}],"id":"the-year-in-context","level":2,"text":"2. The year in context"},{"headers":[{"headers":[{"id":"changes-in-properties-in-areas-at-risk-from-flooding-and-coastal-erosion","level":4,"text":"3.1.1 Changes in properties in areas at risk from flooding and coastal erosion"}],"id":"properties-in-areas-at-risk-of-flooding","level":3,"text":"3.1 Properties in areas at risk of flooding"},{"headers":[{"id":"other-benefits-of-fcerm-investment","level":4,"text":"3.2.1 Other benefits of FCERM investment"},{"id":"significant-projects-completed","level":4,"text":"3.2.2 Significant projects completed"},{"id":"case-study-1---perry-barr-and-witton-and-bromford-and-castle-vale-schemes","level":4,"text":"Case Study 1 - Perry Barr and Witton and Bromford and Castle Vale schemes"},{"id":"partnership-funding","level":4,"text":"3.2.3 Partnership funding"},{"id":"asset-management","level":4,"text":"3.2.4 Asset management"}],"id":"investment-in-fcerm","level":3,"text":"3.2 Investment in FCERM"},{"id":"public-sector-cooperation-agreements","level":3,"text":"3.3 Public sector cooperation agreements"},{"headers":[{"id":"case-study-2southsea-coastal-scheme","level":4,"text":"Case Study 2: Southsea Coastal Scheme "}],"id":"efficiency-savings","level":3,"text":"3.4 Efficiency savings"}],"id":"current-risk-and-investment","level":2,"text":"3. Current risk and investment"},{"headers":[{"headers":[{"id":"mitigation","level":4,"text":"4.1.1 Mitigation"},{"id":"case-study-3-bridgewater-tidal-barrier-scheme","level":4,"text":"Case study 3: Bridgewater Tidal Barrier Scheme"},{"id":"adaptation-and-resilience","level":4,"text":"4.1.2 Adaptation and resilience"},{"id":"flood-and-coastal-innovation-programmes-fcip","level":4,"text":"Flood and coastal innovation programmes (FCIP)"},{"id":"flood-and-coastal-resilience-innovation-programme-fcrip","level":4,"text":"Flood and Coastal Resilience Innovation Programme (FCRIP)"},{"id":"case-study-4-reclaim-the-rain","level":4,"text":"Case study 4: Reclaim the Rain"},{"id":"adaptive-pathways-programme-app","level":4,"text":"Adaptive Pathways Programme (APP)"},{"id":"coastal-transition-accelerator-programme-1","level":4,"text":"4.1.2.3 Coastal Transition Accelerator Programme"}],"id":"climate-change","level":3,"text":"4.1 Climate change"},{"headers":[{"id":"shoreline-management-plans","level":4,"text":"4.2.1 Shoreline management plans"},{"id":"shoreline-management-plan-explorer","level":4,"text":" 4.2.1.1 Shoreline Management Plan Explorer"},{"id":"coastal-habitats","level":4,"text":"4.2.2 Coastal habitats"},{"id":"intertidal-saltmarsh-and-mudflats","level":4,"text":"4.2.3 Intertidal saltmarsh and mudflats"},{"id":"freshwater-and-other-coastal-habitats","level":4,"text":"4.2.4 Freshwater and other coastal habitats"}],"id":"coastal-change","level":3,"text":"4.2 Coastal change"},{"headers":[{"id":"nfm-programme","level":4,"text":"NFM Programme"},{"id":"mainstream-the-use-of-natural-flood-management","level":4,"text":"Mainstream the use of natural flood management"}],"id":"natural-flood-management","level":3,"text":"4.3 Natural flood management"},{"headers":[{"id":"case-study-5-tamar-estuary-habitat-creation-program-south-hooe","level":4,"text":"Case Study 5: Tamar estuary habitat creation program (South Hooe)"}],"id":"improving-the-environment","level":3,"text":"4.4 Improving the environment"},{"id":"strategic-planning-flood-risk-management-plans","level":3,"text":"4.5  Strategic planning: flood risk management plans"},{"headers":[{"id":"catchment-sensitive-farming-csf","level":4,"text":"4.6.1 Catchment Sensitive Farming (CSF)"}],"id":"agriculture-and-land-management","level":3,"text":"4.6 Agriculture and land management"}],"id":"fcerm-strategy-ambition-1---climate-resilient-places","level":2,"text":"4. FCERM strategy ambition 1 - climate resilient places"},{"headers":[{"headers":[{"id":"planning-policy-guidance-and-research","level":4,"text":"5.1.1 Planning policy, guidance and research"}],"id":"promoting-safe-development-resilient-to-flooding-and-coastal-change","level":3,"text":"5.1 Promoting safe development resilient to flooding and coastal change"},{"id":"property-flood-resilience","level":3,"text":"5.2 Property Flood Resilience"},{"id":"reservoir-safety","level":3,"text":"5.3 Reservoir safety"},{"id":"surface-water-management","level":3,"text":"5.4 Surface water management"},{"id":"flood-risk-activities--environmental-permitting","level":3,"text":"5.5 Flood risk activities – environmental permitting"},{"id":"water-companies-contribution-to-reducing-risk","level":3,"text":"5.6 Water companies’ contribution to reducing risk"}],"id":"ambition-2--todays-growth-and-infrastructure-resilient-in-tomorrows-climate","level":2,"text":"5. Ambition 2 – today’s growth and infrastructure resilient in tomorrow’s climate"},{"headers":[{"id":"skills-and-capacity-in-llfas","level":3,"text":"6.1 Skills and capacity in LLFAs"},{"headers":[{"id":"flood-warning-service","level":4,"text":"6.2.1 Flood warning service"},{"id":"flood-warnings-issued-and-number-of-properties-registered-for-them","level":4,"text":"6.2.2 Flood warnings issued and number of properties registered for them"},{"id":"flood-alerts-flood-warnings-and-severe-flood-warnings-issued","level":4,"text":"6.2.3 Flood alerts, flood warnings and severe flood warnings issued"},{"id":"messages-sent","level":4,"text":"6.2.4 Messages sent"}],"id":"using-digital-technology-to-warn-and-inform","level":3,"text":"6.2 Using digital technology to warn and inform"},{"id":"flood-risk-information-service","level":3,"text":"6.3 Flood risk information service"},{"id":"fcerm-research-and-development-programme","level":3,"text":"6.4 FCERM Research and Development Programme"},{"headers":[{"id":"published-areas-of-research-interest","level":4,"text":"6.5.1 Published areas of research interest"},{"id":"estimating-flood-peaks-and-hydrographs-in-small-catchments","level":4,"text":"6.5.2 Estimating flood peaks and hydrographs in small catchments"},{"id":"planning-for-the-risk-of-widespread-flooding","level":4,"text":"6.5.3 Planning for the risk of widespread flooding"}],"id":"research-publication-highlights","level":3,"text":"6.5 Research publication highlights"},{"headers":[{"id":"international-engagement","level":4,"text":"International Engagement"}],"id":"international-learning","level":3,"text":"6.6 International learning "}],"id":"ambition-3---a-nation-ready-to-respond-and-adapt-to-flooding-and-coastal-change","level":2,"text":"6. Ambition 3 - a nation ready to respond and adapt to flooding and coastal change"},{"id":"looking-ahead","level":2,"text":"7. Looking ahead"}],"national_applicability":{"england":{"applicable":true,"label":"England"},"northern_ireland":{"alternative_url":"","applicable":false,"label":"Northern Ireland"},"scotland":{"alternative_url":"","applicable":false,"label":"Scotland"},"wales":{"alternative_url":"","applicable":false,"label":"Wales"}},"political":false,"public_timestamp":"2026-06-30T16:07:58.000+01:00"},"document_type":"html_publication","first_published_at":"2024-09-03T09:06:34+01:00","links":{"available_translations":[{"api_path":"/api/content/government/publications/flood-and-coastal-risk-management-national-report/flood-and-coastal-erosion-risk-management-report-1-april-2023-to-31-march-2024","api_url":"https://www.gov.uk/api/content/government/publications/flood-and-coastal-risk-management-national-report/flood-and-coastal-erosion-risk-management-report-1-april-2023-to-31-march-2024","base_path":"/government/publications/flood-and-coastal-risk-management-national-report/flood-and-coastal-erosion-risk-management-report-1-april-2023-to-31-march-2024","content_id":"d8b0d145-d97f-46b7-a5ff-b7a6e746beb4","document_type":"html_publication","links":{},"locale":"en","public_updated_at":"2026-06-30T15:07:58Z","schema_name":"html_publication","title":"Flood and coastal erosion risk management report: 1 April 2023 to 31 March 2024","web_url":"https://www.gov.uk/government/publications/flood-and-coastal-risk-management-national-report/flood-and-coastal-erosion-risk-management-report-1-april-2023-to-31-march-2024","withdrawn":false}],"government":[{"api_path":"/api/content/government/2010-to-2015-conservative-and-liberal-democrat-coalition-government","api_url":"https://www.gov.uk/api/content/government/2010-to-2015-conservative-and-liberal-democrat-coalition-government","base_path":"/government/2010-to-2015-conservative-and-liberal-democrat-coalition-government","content_id":"591c83aa-3b74-437d-a342-612bddd97572","details":{"current":false,"ended_on":"2015-05-08T00:00:00+00:00","started_on":"2010-05-12T00:00:00+00:00"},"document_type":"government","links":{},"locale":"en","title":"2010 to 2015 Conservative and Liberal Democrat coalition government","web_url":"https://www.gov.uk/government/2010-to-2015-conservative-and-liberal-democrat-coalition-government"}],"organisations":[{"analytics_identifier":"EA199","api_path":"/api/content/government/organisations/environment-agency","api_url":"https://www.gov.uk/api/content/government/organisations/environment-agency","base_path":"/government/organisations/environment-agency","content_id":"16628142-57b2-4611-bc03-5912785acee3","details":{"acronym":"","brand":"department-for-environment-food-rural-affairs","default_news_image":{"high_resolution_url":"https://assets.publishing.service.gov.uk/media/62c56ed9e90e0774833f5583/s960_EA-officer-high-viz-jacket_960x640.jpg","url":"https://assets.publishing.service.gov.uk/media/62c56ed9d3bf7f30034430da/s300_EA-officer-high-viz-jacket_960x640.jpg"},"logo":{"crest":"custom","formatted_title":"Environment Agency","image":{"alt_text":"Environment Agency","url":"https://assets.publishing.service.gov.uk/media/61fd3365e90e0768a8e97523/environment-agency-logo-480w.png"}},"organisation_govuk_status":{"status":"live","updated_at":null,"url":null}},"document_type":"organisation","links":{},"locale":"en","schema_name":"organisation","title":"Environment Agency","web_url":"https://www.gov.uk/government/organisations/environment-agency","withdrawn":false}],"parent":[{"api_path":"/api/content/government/publications/flood-and-coastal-risk-management-national-report","api_url":"https://www.gov.uk/api/content/government/publications/flood-and-coastal-risk-management-national-report","base_path":"/government/publications/flood-and-coastal-risk-management-national-report","content_id":"5f467618-7631-11e4-a3cb-005056011aef","document_type":"corporate_report","links":{},"locale":"en","public_updated_at":"2026-06-30T15:07:58Z","schema_name":"publication","title":"Flood and coastal erosion risk management annual report","web_url":"https://www.gov.uk/government/publications/flood-and-coastal-risk-management-national-report","withdrawn":false}],"primary_publishing_organisation":[{"analytics_identifier":"EA199","api_path":"/api/content/government/organisations/environment-agency","api_url":"https://www.gov.uk/api/content/government/organisations/environment-agency","base_path":"/government/organisations/environment-agency","content_id":"16628142-57b2-4611-bc03-5912785acee3","details":{"acronym":"","brand":"department-for-environment-food-rural-affairs","default_news_image":{"high_resolution_url":"https://assets.publishing.service.gov.uk/media/62c56ed9e90e0774833f5583/s960_EA-officer-high-viz-jacket_960x640.jpg","url":"https://assets.publishing.service.gov.uk/media/62c56ed9d3bf7f30034430da/s300_EA-officer-high-viz-jacket_960x640.jpg"},"logo":{"crest":"custom","formatted_title":"Environment Agency","image":{"alt_text":"Environment Agency","url":"https://assets.publishing.service.gov.uk/media/61fd3365e90e0768a8e97523/environment-agency-logo-480w.png"}},"organisation_govuk_status":{"status":"live","updated_at":null,"url":null}},"document_type":"organisation","links":{},"locale":"en","schema_name":"organisation","title":"Environment Agency","web_url":"https://www.gov.uk/government/organisations/environment-agency","withdrawn":false}]},"locale":"en","phase":"live","public_updated_at":"2026-06-30T16:07:58+01:00","publishing_app":"whitehall","publishing_request_id":"21-1782832078.616-10.13.20.235-2754","publishing_scheduled_at":null,"rendering_app":"frontend","scheduled_publishing_delay_seconds":null,"schema_name":"html_publication","title":"Flood and coastal erosion risk management report: 1 April 2023 to 31 March 2024","updated_at":"2026-08-24T10:19:19+01:00","withdrawn_notice":{}}